Rehabilitation works for railway bridges, bridges and tunnels – Timisoara Regional Railway Branch Phase II a (Q3098955): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
(‎Removed claim: co-financing rate (P837): 0.85 percent)
Property / co-financing rate
0.85 percent
Amount0.85 percent
Unitpercent
 
Property / co-financing rate: 0.85 percent / rank
Normal rank
 

Revision as of 13:20, 27 September 2021

Project Q3098955 in Romania
Language Label Description Also known as
English
Rehabilitation works for railway bridges, bridges and tunnels – Timisoara Regional Railway Branch Phase II a
Project Q3098955 in Romania

    Statements

    0 references
    9,864,258.31 Romanian Leu
    0 references
    1,972,851.6620000002 Euro
    13 September 2021
    0 references
    11,605,009.76 Romanian Leu
    0 references
    2,321,001.952 Euro
    13 September 2021
    0 references
    18 May 2008
    0 references
    28 June 2021
    0 references
    COMPANIA NATIONALA DE CAI FERATE "CFR" SA/SECTOR INVESTITII
    0 references
    0 references
    Obiectivul principal al proiectului este: Reabilitarea a 7 structuri selectate de pe raza SRCF Timişoara, după cum urmează: 1. Tunel km 446 + 811 - km 447 + 080, CF 100, Orşova – Timişoara Nord, între staţiile Teregova şi Armeniş (jud. Caraş – Severin); 2. Pod km 72 + 569, CF 116, Simeria - Livezeni Directa II, între staţiile Baniţa şi Petroşani (jud. Hunedoara); 3. Tunel km 63 + 315 - km 63 + 407, CF 116, Simeria - Livezeni Directa II, între staţiile Merişor şi Baniţa (jud. Hunedoara); 4. Pod km 3 + 724, CF 216, Ilia - Lugoj, între staţiile Ilia şi Dobra (jud. Hunedoara); 5. Pod km 36 + 673, CF 116, Simeria - Livezeni Directa I si II, între staţiile Subcetate şi Baieşti (jud. Hunedoara); 6. Pod km 5 + 403, CF 216, Ilia - Lugoj, între staţiile Ilia şi Dobra (jud. Hunedoara); 7. Podeţ km 12 + 255, CF 216, Ilia - Lugoj, între staţiile Dobra şi Holdea (jud. Hunedoara). Proiectul a fost fazat conform adresei CE ARES (2016) 3986196/28.07.2016 iar fazarea proiectului este: a) lucrări executate până la data de 30.11.2015 b) lucrări executate în perioada 01.12.2015 – 30.06.2016 care justifică valoarea avansului acordat și nerecuperat până la 31.12.2015 c) plăţile efectuate până la 31.12.2015. • Faza 2 reprezintă: - lucrări aferente finalizării proiectului in integralitatea sa ale căror cheltuieli eligibile vor fi rambursate din Programul Operațional Infrastructura Mare (POIM) 2014-2020. Proiectul este împărțit în două faze dintre care faza a- II- a este subiectul acestei aplicații de finanțare în cadrul Programului Operațional Infrastructra Mare. Lucrările ce se execută în faza a- II- a , după data de 01.10.2016 pentru finalizarea obiectivului de investiții, aferente indicatorilor de fazare, sunt după cum urmează: FAZA II : LUCRĂRI CE VOR FI EXECUTATE DUPĂ DATA DE 01.10.2016. I. POD KM 3+724, LINIA CF 216, ILIA - LUGOJ, ÎNTRE STAŢIILE ILIA ŞI DOBRA (JUD. HUNEDOARA) - I1 Lucrări pregătitoare - 1a Drum de acces și platformă 44.33% - I2 Amenajare albie - 2a Amenajare albie 2.70% - I3 Suprastructură CF - 3a Suprastructură CF 24.48% - I4 Suprastructură Pod - 4a Suprastructură Pod 19.38% - I5 Infrastructură Pod - 5a Infrastructură Pod 92.62% - I8 Instalaţii BLA - 8a Reţele cabluri exterioare 2.04% - I10 Instalaţii TTR - 10a Lucrări Provizorii 1.40% - 10b Lucrări Definitive 0.92% II. POD KM 5+403, LINIA CF 216, ILIA - LUGOJ, ÎNTRE STAŢIILE ILIA ŞI DOBRA (JUD. HUNEDOARA) - I1Lucrări Pregătitoare - 1a Drum de acces și platformă 9.06% - I2 Amenajare albie - 2a Amenajare albie 95.81% - I3 Suprastructura CF - 3a Suprastructura CF 22.96% - I4 Suprastructura pod - 4a Suprastructura pod 7.74% - I5 Infrastructură pod - 5a Pila 23.5% - 5b Culee și sferturi de con 23.33% - 5c Demolare pod existent 6.47% - I8 Instalaţii BLA - 8a Reţele de cabluri exterioare 17.02% - I10 Instalaţii TTR - 10a Lucrări definitive 1.20% III. PODEŢ KM 12 + 255, CF 216, ILIA - LUGOJ, ÎNTRE STAŢIILE DOBRA ŞI HOLDEA (JUD. HUNEDOARA) - I1L (Romanian)
    0 references
    The main objective of the project is: Rehabilitation of 7 selected structures within the SRCF Timisoara radius, as follows: 1. Tunnel km 446 + 811 – km 447 + 080, CF 100, Orșova – Timişoara Nord, between Teregova and Armenis stations (county. Caraș – Severin); 2. Bridge km 72 + 569, CF 116, Simeria – Livezeni Directa II, between Banița and Petroșani stations (county. Hunedoara); 3. Tunnel km 63 + 315 – km 63 + 407, CF 116, Simeria – Livezeni Directa II, between Merişor and Banița stations (county. Hunedoara); 4. Bridge km 3 + 724, CF 216, Ilia – Lugoj, between Ilia and Dobra stations (county. Hunedoara); 5. Pod km 36 + 673, CF 116, Simeria – Livezeni Directa I and II, between Subcetate and Baiești stations (county. Hunedoara); 6. Bridge km 5 + 403, CF 216, Ilia – Lugoj, between Ilia and Dobra stations (county. Hunedoara); 7. Flooring km 12 + 255, CF 216, Ilia – Lugoj, between Dobra and Holdea stations (county. Hunedoara). The project was phased according to the letter CE ARES (2016) 3986196/28.07.2016 and the project phase is: a) works executed up to 30.11.2015 b) works executed in the period 01.12.2015-30.06.2016 justifying the amount of the advance granted and not recovered by 31.12.2015 c) payments made until 31.12.2015. • Phase 2 is: works related to the completion of the project in its entirety, the eligible expenses of which will be reimbursed from the Large Infrastructure Operational Programme (MAOP) 2014-2020. The project is divided into two phases, phase II of which is the subject of this funding application under the Large Infrastructure Operational Programme. The work to be carried out in phase II, after 01.10.2016 for the completion of the investment objective, related to the phase-in indicators, is as follows: PHASE II: WORKS TO BE CARRIED OUT AFTER 01.10.2016. I. BRIDGE KM 3+ 724, LINE CF 216, ILIA – LUGOJ, BETWEEN ILIA AND DOBRA STATIONS (COUNTY. Hunedoara) – I1 Preparatory works – 1a Access road and platform 44.33 % – I2 Beam layout – 2a Beam design 2.70 % – I3 CF superstructure – 3a CF superstructure 24.48 % – I4 Bridge superstructure – 4a Bridge superstructure 19.38 % – I5 Bridge infrastructure – 5a Bridge infrastructure 92.62 % – I8 BLA installations – 8a Outer Cable Networks 2.04 % – I10 Installations TTR – 10th Provisional Works 1.40 % – 10b Definitive Works 0.92 % II. BRIDGE KM 5+ 403, LINE CF 216, ILIA – LUGOJ, BETWEEN ILIA AND DOBRA STATIONS (COUNTY. Hunedoara) – I1Preparatory Works – 1a Access Road and Platform 9.06 % – I2 Beell design – 2a Beell design 95.81 % – I3 CF superstructure – 3a CF superstructure 22.96 % – I4 Bridge superstructure – 4a Bridge superstructure 7.74 % – I5 Bridge infrastructure – 5a Pila 23.5 % – 5b cone quarters 23.33 % – 5c Existing bridge demolition 6.47 % – I8 BLA installations – 8a Outdoor cable networks 17.02 % – I10 TTR installations – 10a Definitive Works 1.20 % III. FLOORING KM 12 + 255, CF 216, ILIA – LUGOJ, BETWEEN DOBRA AND HOLDEA STATIONS (COUNTY. HUNEDOARA) – I1L (English)
    16 September 2021
    0 references
    Judeţul Caraş-Severin, Romania
    0 references
    Judeţul Hunedoara, Romania
    0 references

    Identifiers

    111698
    0 references