Cycling route Martin Vrútky, time Vrútky (Q3102386): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string) |
(Removed claims) |
||||||||||||||
Property / beneficiary name (string) | |||||||||||||||
Property / beneficiary name (string): Mesto Vrútky / rank | |||||||||||||||
Property / summary | |||||||||||||||
Property / summary: Ciežom projektu je rozvinú infratruktúru pre cyklodopravu a tým vytvori podmienky pre zvýenie podielu cyklodopravy v rámci dežby prepravnej práce v meste Vrútky s prepojením na cyklodopravnú dostupnos aj do susedného mesta Martin. V rámci predkladaného projektu sa vybuduje samostatná cyklocestička v katastri mesta Vrútky začínajúca pri hranici katastrálneho územia Martin - Vrútky, kde bude nadväzova na čas cyklocestičky v k.ú. Priekopa (rieené samostatným projektom mesta Martin - aj so samostatnou PD) projektom rieená trasa pokračuje v po žavom nábreí rieky Turiec v dĺke 0,131 km po most pre peích, od ktorého ďalej u vedie spevnený chodník pre peích a cyklistov, ktorý plynule prejde do ul. Hlboký dvor ústiacej do Námestia S. Zachara vo Vrútkach. Súčasou cyklocestičky budú 2 novovytvorené oddychové plochy. Pozdĺ cyklocestičky a novovybudovanej oddychovej plochy bude rieené verejné osvetlenie svietidlami umiestnenými na svetelných stĺpoch. Pre cyklochodníček a jeho okolie sa projektom obstará mobiliár - lavičky, stojany na bicykle, smetné koe, informačné a náučné tabule. 2 oddychové miesta budú rieené ako spevnená plocha zo zámkovej dlaby lemovaná parkovým obrubníkom. (Slovak) / rank | |||||||||||||||
Property / summary | |||||||||||||||
Property / summary: The aim of the project is to develop infrastructure for cycling and thus create conditions for increasing the share of cycling transport as part of the split of transport work in Vrútky with connection to cycling access also to the neighbouring town of Martin. As part of the presented project, a separate cycle path will be built in the cadastre of the town of Vrútky starting at the border of the cadastral area Martin – Vrútky, where it will follow the time of the cycle path in the k.ú. The trench (directed by a separate project of the city of Martin – even with a separate PD) project proceeds along the spring embankment of the river Turiec in a distance of 0.131 km to the bridge for pee and cyclists, from which further leads the paved path for pedestrians and cyclists, which goes smoothly to the street. Deep yard mouthing into S. Zachar Square in Vrútky. The time of the cycle path will be 2 newly created rest areas. Along the cycle path and the newly built rest area will be solved by public lighting by lamps located on the light poles. For cycling and its surroundings, the project will procure mobile phones – benches, bicycle stands, garbage boxes, information and educational boards. 2 resting places will be solved as a paved area of the locking pavement lined with a park curb. (English) / rank | |||||||||||||||
Property / summary: The aim of the project is to develop infrastructure for cycling and thus create conditions for increasing the share of cycling transport as part of the split of transport work in Vrútky with connection to cycling access also to the neighbouring town of Martin. As part of the presented project, a separate cycle path will be built in the cadastre of the town of Vrútky starting at the border of the cadastral area Martin – Vrútky, where it will follow the time of the cycle path in the k.ú. The trench (directed by a separate project of the city of Martin – even with a separate PD) project proceeds along the spring embankment of the river Turiec in a distance of 0.131 km to the bridge for pee and cyclists, from which further leads the paved path for pedestrians and cyclists, which goes smoothly to the street. Deep yard mouthing into S. Zachar Square in Vrútky. The time of the cycle path will be 2 newly created rest areas. Along the cycle path and the newly built rest area will be solved by public lighting by lamps located on the light poles. For cycling and its surroundings, the project will procure mobile phones – benches, bicycle stands, garbage boxes, information and educational boards. 2 resting places will be solved as a paved area of the locking pavement lined with a park curb. (English) / qualifier | |||||||||||||||
|
Revision as of 12:36, 27 September 2021
Project Q3102386 in Slovakia
Language | Label | Description | Also known as |
---|---|---|---|
English | Cycling route Martin Vrútky, time Vrútky |
Project Q3102386 in Slovakia |
Statements
47,948.07 Euro
0 references
56,409.5 Euro
0 references
0.85 percent
0 references
1 September 2018
0 references
1 May 2021
0 references
Identifiers
302011N519
0 references