Reconstruction in front of the AURA school (Q3102351): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string) |
(Removed claims) |
||||||||||||||
Property / beneficiary name (string) | |||||||||||||||
Property / beneficiary name (string): Občianske zdruenie AURA / rank | |||||||||||||||
Property / summary | |||||||||||||||
Property / summary: Ciežom projektu je vytvorenie priestorových a materiálnotechnických podmienok pre zvýenie úrovne zakolenosti detí, celkové skvalitnenie výchovno-vzdelávacieho procesu s dôrazom na zvýenie kapacity a zlepenia energetickej hospodárnosti verejnej budovy. Projekt tak vytvára podmienky nielen pre zvýenie úrovne zakolenosti detí v meste, ale zároveň podporuje rozvoj kvality vzdelania a tým zlepenie kvality ivota obyvatežov. Prvé dve aktivity projektu sú postavené tak aby prostredníctvom stavebno technických úprav existujúceho objektu M a jeho vonkajieho areálu vytvorili priestorové podmienky pre navýenie kapacity (o 10 detí vrátane vytvorenia 1 novej triedy). Treou súvisiacou aktivitou sú stavebné úpravy prispievajúce k zvýenie energetickej hospodárnosti. Prínosy projektu sú zamerané na deti v predkolskej výchove a zároveň podporujú udratežné poskytovanie verejných sluieb. Budova ktorá je predmetom projektu (stavebné úpravy a prístavba k stavbe č. súp. 5039, spojené so zmenou v uívaní stavby) sa nachádza v k.ú. Humenné. Zriaďovatežom koly je Občianske zdruenie AURA. Meratežné ukazovatele: počet renovovaných budov, areálov, podporených M = 1, renovovaná podlahová plocha =. 551,11 m2, dosiahnutá kapacita zariadenia na úroveň 41 detí, zníenie ročnej spotreby primárnej energie vo verejných budovách - 28 038,32 kWh/rok. (Slovak) / rank | |||||||||||||||
Property / summary | |||||||||||||||
Property / summary: The aim of the project is to create spatial and material conditions for raising the level of education of children, the overall improvement of the educational process with an emphasis on increasing capacity and improving the energy performance of the public building. In this way, the project not only creates conditions for raising the level of education of children in the city, but also promotes the development of the quality of education and thus improve the quality of life of the inhabitants. The first two activities of the project are built to create space conditions for capacity increase (by 10 children, including the creation of 1 new class) through the construction of technical modifications of the existing M building and its external area. The third related activity is building modifications contributing to the improvement of energy performance. The benefits of the project are aimed at children in pre-school education and at the same time support the aggravating provision of public services. Building which is the subject of the project (construction modifications and extension to the construction No. Súp. 5039, associated with a change in the use of construction) is located in the.ú. Humenné. The set-up of the wheel is the Civic Association of the AURA. Measurement indicators: number of renovated buildings, areas, supported M = 1, renovated floor area =. 551,11 m², equipment capacity achieved to 41 children, reduction of annual primary energy consumption in public buildings – 28038.32 kWh/year. (English) / rank | |||||||||||||||
Property / summary: The aim of the project is to create spatial and material conditions for raising the level of education of children, the overall improvement of the educational process with an emphasis on increasing capacity and improving the energy performance of the public building. In this way, the project not only creates conditions for raising the level of education of children in the city, but also promotes the development of the quality of education and thus improve the quality of life of the inhabitants. The first two activities of the project are built to create space conditions for capacity increase (by 10 children, including the creation of 1 new class) through the construction of technical modifications of the existing M building and its external area. The third related activity is building modifications contributing to the improvement of energy performance. The benefits of the project are aimed at children in pre-school education and at the same time support the aggravating provision of public services. Building which is the subject of the project (construction modifications and extension to the construction No. Súp. 5039, associated with a change in the use of construction) is located in the.ú. Humenné. The set-up of the wheel is the Civic Association of the AURA. Measurement indicators: number of renovated buildings, areas, supported M = 1, renovated floor area =. 551,11 m², equipment capacity achieved to 41 children, reduction of annual primary energy consumption in public buildings – 28038.32 kWh/year. (English) / qualifier | |||||||||||||||
|
Revision as of 12:35, 27 September 2021
Project Q3102351 in Slovakia
Language | Label | Description | Also known as |
---|---|---|---|
English | Reconstruction in front of the AURA school |
Project Q3102351 in Slovakia |
Statements
83,759.65 Euro
0 references
98,540.76 Euro
0 references
0.85 percent
0 references
1 July 2019
0 references
1 June 2020
0 references
Identifiers
302021M851
0 references