OVEN FISHING SHELTER (Q2784139): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
(‎Removed claim: co-financing rate (P837): 75.0 percent, Removing co-finance rate from projects in greece)
Property / co-financing rate
75.0 percent
Amount75.0 percent
Unitpercent
 
Property / co-financing rate: 75.0 percent / rank
Normal rank
 

Revision as of 12:18, 27 September 2021

Project Q2784139 in Greece
Language Label Description Also known as
English
OVEN FISHING SHELTER
Project Q2784139 in Greece

    Statements

    0 references
    4,076,000.0 Euro
    0 references
    29 November 2019
    0 references
    31 December 2023
    0 references
    ΠΕΡΙΦΕΡΕΙΑ ΒΟΡΕΙΟΥ ΑΙΓΑΙΟΥ
    0 references
    0 references

    39°9'24.48"N, 26°21'8.17"E
    0 references

    39°9'24.48"N, 26°21'8.17"E
    0 references
    <p><span style="font-size: 9.0pt;color: black;">Το έργο αφορά στην κατασκευή αλιευτικού καταφυγίου στο κεντρικό λιμένα Φούρνων Κορσεών νομού Σάμου, για την προστασία από τους  κυματισμούς που εισέρχονται εντός του όρμου και καθιστούν προβληματική τη χρήση του, από τα αλιευτικά σκάφη. </span></p><p><span style="font-size: 9.0pt;color: black;">Θα κατασκευαστεί επέκταση του νότιου μώλου κατά 110μ. και πλάτους 10μ., κρηπίδωση της παραλίας, εγκατάσταση πλωτής προβλήτας και επισκευή – ενίσχυση του υφιστάμενου εγκάρσιου στην παραλία προβόλου και επέκτασή του κατά 20μ. περίπου. Θα κατασκευαστούν επίσης οι ηλεκτρομηχανολογικές εγκαταστάσεις και δίκτυα του καταφυγίου.</span></p><p><span style="font-size: 9.0pt;color: black;">Μετά την κατασκευή των έργων θα μπορούν να ελλιμενιστούν 6 σκάφη μήκους έως 12μ., 17 σκάφη έως 10,5μ. και 24 σκάφη έως 8,00μ. δηλαδή  συνολικά 47 σκάφη. </span></p><p><br/></p> (Greek)
    0 references
    <p><span style="font-size: 9.0pt;color: Black?">The project concerns the construction of a fishing shelter in the central port of Fourni Korseon Prefecture of Samos, to protect against ripples entering the bay and make its use problematic by fishing vessels. </span></p><p><span style="font-size: 9.0pt;color: Black?">Will build an extension of the southern pier by 110 m. and 10 m wide, platforming of the beach, installation of a floating pier and repairing the existing transverse on the beach and extending it by about 20 m. Electromechanical installations and networks of the shelter will also be constructed.</span></p><p><span style="font-size: 9.0pt;color: Black?">After the construction of the projects, 6 vessels up to 12 m in length can be docked, 17 vessels up to 10.5 m and 24 vessels up to 8.00 m, i.e. a total of 47 vessels. </span></p><p><br/></p> (English)
    2 July 2021
    0 references

    Identifiers

    5.021.798
    0 references