(‎Removed claim: co-financing rate (P837): 0.85 percent)
Property / co-financing rate
0.85 percent
Amount0.85 percent
Unitpercent
 
Property / co-financing rate: 0.85 percent / rank
Normal rank
 

Revision as of 12:01, 27 September 2021

Project Q3056962 in Latvia
Language Label Description Also known as
English
Improvement of energy efficiency in the building Brivibas gatve 333, Riga
Project Q3056962 in Latvia

    Statements

    0 references
    0 references
    846,996.37 Euro
    0 references
    996,466.32 Euro
    0 references
    11 February 2019
    0 references
    10 July 2020
    0 references
    LATVIJAS SPORTA PEDAGOĢIJAS AKADĒMIJA
    0 references
    0 references

    56°59'8.84"N, 24°12'28.76"E
    0 references
    Projekta mērķis ir veicināt energoefektivitātes paaugstināšanu LSPA ēkā Brīvības gatvē 333, Rīga.1) plānotais siltumenerģijas ietaupījums pēc projekta īstenošanas ir ne mazāks kā 279,07 MWh/gadā (35,72% gadā);2) plānotais enerģijas daudzums (karstajam ūdenim), kurš tiek aizstāts ar atjaunojamajiem energoresursiem (AER) - 26,5 MWh/gadā3) plānotais siltumenerģijas patēriņš apkurei pēc projekta īstenošanas nepārsniegs 62,61 kWh/m2 gadā;4) plānotais CO2 emisiju samazinājums 80 670,84 kg/gadā;Projekta kopējās izmaksas 1 009 833,09 Eur, attiecināmās izmaksas - 996 466,32 Eur, t.sk. Eiropas Reģionālās attīstības fonda atbalsts 85% jeb 846 996,37 Eur apmērā un valsts budžeta finansējums 15% jeb 149 469,95 Eur. Projekta plānotās neattiecināmās izmaksas 13 366,77 Eur apmērā.Projekta ietvaros ēkā plānots:- uzstādīt jaunu vertikālo hidroizolāciju, jaunu pamatu nokrišņu novadīšanas apmales izbūvi;- ēkas fasādēs esošo plaisu/dekoratīvo elementu remontu;- ārsienu un cokola daļas siltuma noturības paaugstināšanas darbus (kā nedalāms pasākumu kopums), nodrošinot ēkas atbilstību Latvijas būvnormatīva LBN 002-15 "Ēku norobežojošo konstrukciju siltumtehnika" un Latvijas būvnormatīva LBN 231-15 "Dzīvojamo un publisko ēku apkure un ventilācija" vismaz minimālajām prasībām;- paredzēts uzstādīt saules kolektorus siltā ūdens sagatavošanai;- koka durvju nomaiņu;- koka logu nomaiņu- īstenota Projekta publicitāteProjekta ilgums: 17 mēneši no vienošanās par projekta īstenošanu parakstīšanas laika. (Latvian)
    0 references
    The aim of the project is to promote energy efficiency improvement in LSPA building Brivibas gatve 333, Riga.1) The planned amount of thermal energy after project implementation is not less than 279.07 MWh/year (35.72 % per year);2) The planned amount of energy (hot water), which is replaced by renewable energy sources (AER) – 26.5 MWh/year3) the planned heat energy consumption for heating after the project will not exceed 62.61 kWh/m² per year;4) The planned CO2 emission reduction (AER) – 26.5 MWh/year3) the planned heat consumption for heating after the project will not exceed 62.61 kWh/m²/m²;4) the planned CO2 emission reduction (EUR32/09, EUR466,833 kg). European Regional Development Fund support 85 % or EUR 846 996,37 and state budget funding 15 % or EUR 149 469,95.The project’s planned ineligible costs of EUR 13366.77.The project plans to install new vertical hydroisolation in the building’s facades;- to install new vertical hydroisolation, new foundation for draining wood construction construction construction constructions;- Building-consumption of wooden building (as inseparable set of events;-Operation of the building in the facades) repair of existing cracks/decorative elements of building;- outboard wall and plumbing part of thermal insulation works (as inseparable set of events; Project-Operation-Operation-Operation of the building building “Surveillance-in-to-beam”, ensuring the conformity of the building with the requirements of the Latvian thermal insulation of 002; “as an indivisible set of non-described measures and building building”Surveillary-Surveillance for the building’s building’s “Surviable building” is planned to be implemented in the amount of 85 % or EUR 846 996,37 and state budget funding of 15 % or EUR 149 469,95. 17 months from the signing of the agreement on project implementation. (English)
    15 July 2021
    0 references
    Brīvības gatve 333, Rīga, LV-1006
    0 references

    Identifiers

    4.2.1.2/18/I/008