Enhancement of energy efficiency in Daugavpils Stropu Primary School – Development Centre building – Mihoelsa iela 4, Daugavpils (Q3057127): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: co-financing rate (P837): 0.85 percent)
(‎Changed an Item: modifying co-finance rate with the percentage)
Property / co-financing rate
 
85.0 percent
Amount85.0 percent
Unitpercent
Property / co-financing rate: 85.0 percent / rank
 
Normal rank

Revision as of 11:55, 27 September 2021

Project Q3057127 in Latvia
Language Label Description Also known as
English
Enhancement of energy efficiency in Daugavpils Stropu Primary School – Development Centre building – Mihoelsa iela 4, Daugavpils
Project Q3057127 in Latvia

    Statements

    0 references
    0 references
    334,150.32 Euro
    0 references
    393,118.02 Euro
    0 references
    85.0 percent
    0 references
    18 July 2018
    0 references
    17 January 2021
    0 references
    DAUGAVPILS PILSĒTAS DOME
    0 references
    0 references

    55°52'3.97"N, 26°31'34.00"E
    0 references
    Projekta mērķis – samazināt primārās enerģijas patēriņu, sekmējot energoefektivitātes paaugstināšanu Daugavpils Stropu pamatskolas - attīstības centra ēkai - Mihoelsa ielā 4, Daugavpilī. Lai sasniegtu projekta mērķi, Daugavpils Stropu pamatskolas - attīstības centrā – Mihoelsa ielā 4, Daugavpilī, tiks veiktas sekojošas galvenās aktivitātes:1) ēkas fasādes siltināšana t.sk. ārsienu siltināšana, logu un durvju nomaiņa, cokola pamatu siltināšana, esoša jumta pārseguma siltināšana, pagrāba pārseguma siltināšana;2) ventilācijas sistēmas atjaunošana uzstādot rekuperācijas iekārtu;3) siltumapgādes sistēmas rekonstrukcija;4) enerģiju taupošu LED gaismekļu uzstādīšana;5) automātiskās ugunsgrēka atklāšanas un trauksmes signalizācijas sistēmas, kā arī evakuācijas avārijas apgaismes ierīkošana;6) vides pieejamības prasību nodrošināšana;7) autoruzraudzība un būvuzraudzība;8) projekta publicitāte.Projekta realizācijas rezultātā tiks samazināts primārās enerģijas patēriņš, sekmējot ilgtermiņā energoefektivitātes paaugstināšanu un pašvaldības izdevumu samazināšanos par siltumapgādi, tiks sasniegtas energoefektivitātes prasības atbilstoši Latvijas būvnormatīvā LBN 002-015 “Ēku norobežojošo konstrukciju siltumtehnika”, kā arī objekts tiks pielāgots personām ar īpašām vajadzībām, tādējādi nodrošinot vides pieejamību.Projekta kopējās izmaksas: 1 045 667.74 EURtai skaitā · attiecināmās: 396 650.21 no tām- 337152.68 EUR – ERAF līdzekļi (85%);- 17849.26 EUR – valsts budžeta dotācija (4.50%);- 41648.27 EUR– pašvaldības līdzekļi (10.50%).· neattiecināmās: 649 017.53 EUR izmaksas, kas nav saistītas ar energoefektivitāti paaugstinošiem pasākumiem.Paredzēts, ka projekta ilgums būs 30 mēneši no līguma par projekta īstenošanu parakstīšanas dienas.Projekta atbalstāmo darbību īstenošana ir uzsākta 2016.gada 17.augustā, kad tika parakstīts Uzņēmuma līgums Nr. D-2016/521 starp Daugavpils pilsētas domi un SIA “Ēkas siltināšana” par būvprojekta izstrādi būvobjektam „2.speciālās pirmsskolas izglītības iestādes ēkas energoefektivitātes paaugstināšana, vides pieejamības prasību nodrošināšana – Mihoelsa iela 4, Daugavpilī”. (Latvian)
    0 references
    The aim of the project is to reduce primary energy consumption by promoting energy efficiency improvement of Daugavpils Stropu Primary School – Development Centre building – Mihoelsa iela 4, Daugavpils. In order to achieve the project goal, Daugavpils Stropu Elementary School – development centre – Mihoelsa street 4, Daugavpils main activities will be carried out: 1) insulation of the facade of the building including insulation of exterior walls, replacement of windows and doors, insulation of the base of the cap, existing roof cover insulation, the energy efficiency of the existing roof protection in the long term will be achieved, thus making the building cover insulation;2) restoration of ventilation system installing the recuperation unit;3) the installation of electric efficiency of the heating system; 5) the energy efficiency reduction of the building in the long term will be reduced) the energy requirements of the building will be reduced in the long term.Unsuperficiary requirements of the building with heat cover insulation;2) restoration of ventilation system installing recuperation unit;3) heating system reconstruction, and the energy efficiency reduction of the electric energy system will be applied in the long term; 4) the installation of the electric energy system in accordance with the requirements of the building.2) Restoration of the ventilation system by installing recuperation equipment; 3) Eat the energy efficiency reduction of the building in the long term will be reduced by the energy efficiency reduction of the building.4) The restoration of ventilation system by installing the recuperation equipment;3) the reconstruction of the heating system in accordance with the installation of the electric energy efficiency of the building system will be reduced in the long term; 4) the installation of the electric power supply system will be applied in accordance with the requirements of the building.2) Restoration of ventilation system by installing recuperation equipment; 3) Installation of the heating system in accordance with the requirements of the building will be made in order to achieve the goal of the project: 1) Insulation of the facade of the building, including insulation of exterior walls, replacement of windows and doors, insulation of the bases of the coat, insulation of the existing roof cover in the long term, the energy efficiency of the existing roof, in the long-term use of the building, in order to provide heat cover insulation; 2) The restoration of ventilation system by installing a recuperation unit; 3) the heating of the heating system in accordance with the requirements of the building will be reduced as well as energy efficiency reduction of the energy system in the long term will be applied to ensure the thermal insulation of the facade of the building including insulation of external walls, replacement of windows and doors, insulation of the bases of the basement of the base of the basement, insulation of existing roof covering, etc.; Insulating of external walls, replacement of windows and doors, the insulation of the base of the base of the cape, the existing roof cover insulation, in a way the overall requirements of the building will be reduced in the long term, the energy efficiency requirements of the building with the heat insulation of the buildings; 2) Restoration of ventilation system by installing the recuperation equipment;3) the heating of the heating system as the object of the heating system; 5) the energy efficiency reduction of the building will be reduced as well as the energy efficiency reduction of the building.Under the requirements of the building will be reduced by the installation of thermal insulation of external walls, the replacement of windows and doors, the insulation of the base of the base of the base of the base, as well as the energy efficiency reduction of the existing roof covering, in the long term, with the 1 045 667.74 of which: 396 650.21 of them – EUR 337152.68 – ERDF funds (85 %);- EUR 17849.26 – state budget grant (4.50 %);- EUR 41648.27 – municipal funds (10.50 %).· Ineligible: It is planned that the project will last 30 months from the date of signing of the contract for project implementation.The implementation of the project’s supported activities has been started on August 17, 2016, when the Company Agreement No. D-2016/521 between Daugavpils City Council and SIA “Building Insulation” for the construction object “Enhancing energy efficiency of 2 special pre-school educational establishment building, ensuring environmental accessibility requirements – Mihoelsa iela 4, Daugavpils” was signed. (English)
    15 July 2021
    0 references
    Mihoelsa iela 4, Daugavpils, LV-5401
    0 references

    Identifiers

    4.2.2.0/17/I/062
    0 references