Increase energy efficiency of public buildings at Ezermalas Street 8A, Riga (Q3056985): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: co-financing rate (P837): 0.85 percent) |
(Changed an Item: modifying co-finance rate with the percentage) |
||||||
Property / co-financing rate | |||||||
85.0 percent
| |||||||
Property / co-financing rate: 85.0 percent / rank | |||||||
Normal rank |
Revision as of 11:53, 27 September 2021
Project Q3056985 in Latvia
Language | Label | Description | Also known as |
---|---|---|---|
English | Increase energy efficiency of public buildings at Ezermalas Street 8A, Riga |
Project Q3056985 in Latvia |
Statements
4,439,857.5 Euro
0 references
5,223,361.77 Euro
0 references
85.0 percent
0 references
16 September 2020
0 references
15 November 2022
0 references
Nodrošinājuma valsts aģentūra
0 references
Projekta mērķis ir veikt valsts ēku Ezermalas ielā, Rīgā, nepieciešamos atjaunošanas pasākumus, tādējādi uzlabojot ēku siltumnoturību un pozitīvi ietekmējot energoresursu efektīvu izmantošanu Latvijā. Nekustamā īpašuma Ezermalas ielā 8A, Rīgā, kadastra numurs 0100 085 0017, sastāvā ir vairākas funkcionāli saistītas ēkas, tai skaitā: - mācību korpuss, kadastra apzīmējums 0100 085 0017 002, adrese Ezermalas iela 10B, Rīga, ēkas kopējā platība 15 014,20 m²; - administratīvā ēka, kadastra apzīmējums 0100 085 0017 004, adrese Ezermalas iela 10, Rīga, ēkas kopējā platība 6 217,40 m² ,- kopmītne, kadastra apzīmējums 0100 085 0017 007, adrese, Ezermalas iela 8A, Rīga, ēkas kopējā platība 5 302,90 m² (turpmāk – Ēkas). Ēku kopējā platība ir 26 534,50 m² un tās lieto Iekšlietu ministrija un tās padotībā esošas iestādes (Valsts policija, Valsts policijas koledža,Nodrošinājuma valsts aģentūra).2016.gadā Ēku tehniskās apsekošanas rezultātā secināts, ka Ēku norobežojošās konstrukcijas neatbilst Ministru kabineta 2015.gada 30.jūnija noteikumiem Nr.339 “Noteikumi par Latvijas būvnormatīvu LBN 002-15 “Ēku norobežojošo konstrukciju siltumtehnika”” prasībām, apkures sistēmas ir novecojušas.Projekta ietvaros plānots veikt šādus galvenos Ēku energoefektivitāti paaugstinošus pasākumus: fasādes atjaunošana, tai skaitā ārsienu, Ēku pāreju grīdas pamatnes un balstu, cokola siltināšana un vides pieejamības nodrošināšana; logu un ārdurvju nomaiņa, ailu siltināšana; pēdējā stāvu pārseguma un jumtu siltināšana; apkures sistēmas atjaunošana; apgaismojuma modernizācija uz energoefektīvu LED apgaismojumu.Pēc projekta īstenošanas sagaidāmie galvenie rezultāti: 1) siltumenerģijas patēriņa samazinājums kopā trīs ēkām - 132,27 %; 2) primārās enerģijas patēriņa samazinājums kopā trīs ēkām -107,6 %. 3) oglekļa dioksīda (turpmāk - CO2) emisijas samazinājums gadā kopā trīs ēkām - 122,18 %. Projekta ieviešanas laiks ir 2020.gada 1.septembris – 2022.gada 31.oktobris, kopā –26 mēneši. Projekta kopējās izmaksas: 7 250 388,73 EUR, kur projekta attiecināmās izmaksas ir 5 223 361,77 EUR: 85% ir ERAF finansējums 4 439 857,50 EUR un 15% ir valsts budžeta līdzekļi 783 504,27 EUR; projekta neattiecināmās izmaksas 2 027 027,08 EUR. (Latvian)
0 references
The aim of the project is to carry out the necessary renovation measures of the state building on Ezermalas Street, Riga, thus improving the thermal stability of buildings and having a positive effect on the efficient use of energy resources in Latvia. Real estate at Ezermalas Street 8A, Riga, cadastral number 0100 085 0017, consists of several functionally connected buildings, including: — training body, cadastre designation 0100 085 0017 002, address 10B Ezermalas Street, Riga, total area of the building 15014,20 m²; Administrative building, cadastral designation 0100 085 0017 004, address Ezermalas street 10, Riga, total area of the building 6217,40 m²,- dormitory, cadastral designation 0100 085 0017 007, address, Ezermalas street 8A, Riga, total area of the building 5302.90 m² (hereinafter – Buildings). The total area of the buildings is 26534.50 m² and they are used by the Ministry of the Interior and its subordinate institutions (State Police, State Police College, Security State Agency).In 2016 it was concluded that building envelope structures do not comply with Cabinet Regulations of 30 June 2015 No.339 “Regulations on Latvian Construction Norms LBN 002-15”The thermal engineering of building envelopes“”, heating systems are outdated. Facade renovation, including insulation of floor bases and supports, plinths and access to environment of exterior walls, transitions of buildings; Replacement of windows and exterior doors, insulation of boxes; Insulation of the last floor covering and roof; Reconditioning of the heating system; Retrofitting of lighting to energy efficient LED lighting.After implementation of the project, the main results are expected: 1) A reduction in thermal energy consumption for a total of three buildings – 132,27 %; 2) Reduction in primary energy consumption for three buildings -107.6 %. 3) A total of 122.18 % reduction of carbon dioxide (hereinafter CO2) emissions per year for three buildings. Project implementation time is 1 September 2020-31 October 2022, total -26 months. Total cost of the project: EUR 7250388,73, where the eligible costs of the project are EUR 5223361,77: 85 % is ERDF funding of EUR 4439857,50 and 15 % is State budget of EUR 783504,27; Ineligible costs of the project EUR 2027027,08. (English)
15 July 2021
0 references
Ezermalas iela 8A, Rīga, LV-1014
0 references
Ezermalas iela 10B, Rīga, LV-1014
0 references
Ezermalas iela 10, Rīga, LV-1014
0 references
Identifiers
4.2.1.2/19/I/012
0 references