Repair works, conservation and introduction to the tourist circuit at the ensemble of the fortified Evangelical Church of VULCAN (Q2746708): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: co-financing rate (P837): 0.83 percent)
(‎Changed an Item: modifying co-finance rate with the percentage)
Property / co-financing rate
 
83.3 percent
Amount83.3 percent
Unitpercent
Property / co-financing rate: 83.3 percent / rank
 
Normal rank

Revision as of 11:16, 27 September 2021

Project Q2746708 in Romania
Language Label Description Also known as
English
Repair works, conservation and introduction to the tourist circuit at the ensemble of the fortified Evangelical Church of VULCAN
Project Q2746708 in Romania

    Statements

    0 references
    1,136,280.16 Romanian Leu
    0 references
    227,256.032 Euro
    13 September 2021
    0 references
    1,364,081.82 Romanian Leu
    0 references
    272,816.364 Euro
    13 September 2021
    0 references
    83.3 percent
    0 references
    7 December 2017
    0 references
    6 December 2022
    0 references
    BISERICA EVANGHELICA C.A.PAROHIA VULCAN
    0 references
    0 references

    45°22'29.50"N, 23°17'38.72"E
    0 references
    Obiectivul general al proiectului este creșterea atractivității turistice a zonei prin punerea în valoare și utilizarea durabilă a obiectivului de patrimoniu Ansamblul Bisericii Fortificate Vulcan și introducerea acestuia în circuitul turistic real și virtual. (Romanian)
    0 references
    The general objective of the project is to increase the tourist attractiveness of the area by enhancing and sustainably using the heritage objective The Vulcan Fortified Church Assembly and its introduction into the real and virtual tourist circuit. (English)
    16 September 2021
    0 references
    Vulcan, Romania
    0 references

    Identifiers

    123797
    0 references