MAIN CONDUCTOR FOR THE WATER SUPPLY OF A CENTRAL DRY SETTLEMENT OF NORTH-WESTERN SEASIDE SEASIDE (Q2777514): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
(‎Removed claim: co-financing rate (P837): 80.0 percent, Removing co-finance rate from projects in greece)
Property / co-financing rate
80.0 percent
Amount80.0 percent
Unitpercent
 
Property / co-financing rate: 80.0 percent / rank
Normal rank
 

Revision as of 11:02, 27 September 2021

Project Q2777514 in Greece
Language Label Description Also known as
English
MAIN CONDUCTOR FOR THE WATER SUPPLY OF A CENTRAL DRY SETTLEMENT OF NORTH-WESTERN SEASIDE SEASIDE
Project Q2777514 in Greece

    Statements

    0 references
    934,978.0 Euro
    0 references
    29 June 2018
    0 references
    31 December 2023
    0 references
    ΔΕΥΑ Δ. ΒΟΡΕΙΑΣ ΚΥΝΟΥΡΙΑΣ
    0 references
    0 references

    37°19'52.07"N, 22°20'54.35"E
    0 references

    37°19'52.07"N, 22°20'54.35"E
    0 references
    Το έργο «Βασικός αγωγός τροφοδότησης υδρευτικού ύδατος κεντρικής δεξαμενής οικισμού Παράλιου ’στρους Δήμου Βόρειας Κυνουρίας» αφορά την αντικατάσταση / κατασκευή του εξωτερικού αγωγού ύδρευσης – μεταφοράς ύδατος από την υφιστάμενη δεξαμενή, που εντοπίζεται βορειοδυτικά του οικισμού ’στρους, μέχρι τη νέα δεξαμενή του οικισμού Παράλιου ’στρους, που προβλέπεται να κατασκευαστεί βόρεια του οικισμού Παράλιου ’στρους, στη θέση των παλαιών υφιστάμενων δεξαμενών. Επιπλέον, το έργο περιλαμβάνει και την κατασκευή της νέας υπόγειας δεξαμενής χωρητικότητας 384 m3 , στη θέση των δύο υφιστάμενων δεξαμενών οι οποίες θα κατεδαφιστούν. (Greek)
    0 references
    The project “Basic water supply pipeline for the central reservoir of the settlement of Paralios Astros Municipality of Northern Kynouria” concerns the replacement/construction of the external water supply pipeline from the existing reservoir, which is located north-west of the settlement of Astras, up to the new reservoir of the settlement of Paralios Astras, which is expected to be constructed north of the settlement of Paralios Astras, at the location of the old existing tanks. In addition, the project includes the construction of the new underground tank with a capacity of 384 m³, in place of the two existing tanks to be demolished. (English)
    2 July 2021
    0 references

    Identifiers

    5.009.791
    0 references