Anchorage of Vassiliki Lefkada tourist boats (Q2769499): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
(‎Removed claim: co-financing rate (P837): 80.0 percent, Removing co-finance rate from projects in greece)
Property / co-financing rate
80.0 percent
Amount80.0 percent
Unitpercent
 
Property / co-financing rate: 80.0 percent / rank
Normal rank
 

Revision as of 09:50, 27 September 2021

Project Q2769499 in Greece
Language Label Description Also known as
English
Anchorage of Vassiliki Lefkada tourist boats
Project Q2769499 in Greece

    Statements

    0 references
    12,387,318.0 Euro
    0 references
    1 January 2014
    0 references
    31 December 2023
    0 references
    ΔΗΜΟΣ ΛΕΥΚΑΔΑΣ
    0 references
    0 references

    38°13'51.92"N, 20°33'5.29"E
    0 references

    38°13'51.92"N, 20°33'5.29"E
    0 references
    Πρόκειται να ολοκληρωθεί η κατασκευή αγκυροβολίου τουριστικών σκαφών στην Τ.Κ. Βασιλικής, της Δ.Ε. Απολλωνίων Λευκάδας, το οποίο θα περιλαμβάνει έργα προστασίας του αγκυροβολίου, 100 θέσεις ελλιμενισμού, 4 κτίρια εξυπηρέτησης του αγκυροβολίου και διαμόρφωση του περιβάλλοντα χώρου.Ανά ομάδα εργασιών το ποσοστό που περιλαμβάνεται στην β΄φάση είναι: Α. ΛΙΜΕΝΙΚΑ ΕΡΓΑ1. Χωματουργικά Λιμενικών 47,47 %2. Λιθορριπές – Φυσικοί ογκόλιθοι 68,46 %3. Σκυροδέματα 99,45 %4. Εξαρτήματα – Εξοπλισμοί 100,00 %5. Πλωτοί προβλήτες 100,00 %6. Οδοστρωσία Ασφαλτικά 100,00 %Β. ΚΤΙΡΙΑΚΑ ΕΡΓΑ ΚΑΙ ΧΕΡΣΑΙΕΣ ΕΓΚΑΤΑΣΤΑΣΕΙΣ1. Χωματουργικά – Καθαιρέσεις 68,85 %2. Σκυροδέματα 36,85%3. Τοιχοποιΐες – Επιχρίσματα 100,00 %4. Δίκτυα (Υδραυλικά – Ηλεκτρικά) 99,58 %5. Επενδυσεις – Επιστρώσεις 100,00%6. Κατασκευές Ξύλινες – Μεταλλικές 100,00%7. Λοιπά – Τελειώματα 92,85 % (Greek)
    0 references
    The construction of a tourist boat anchorage in P.K. Vassiliki, D.E.Apolonia Lefkada, will be completed, which will include works to protect the anchorage, 100 berths, 4 buildings serving the anchorage and the configuration of the surrounding area.If a group of works is included in the second phase is: A. PORTABLE WORKS1. Port earthmoving 47.47 %2. Natural boulders 68,46 %3. Concrete 99.45 %4. Accessories Equipment 100,00 %5. Floating piers 100,00 %6. Roadblocks Insurance 100.00 %B. Buildings AND HOLDER Installations1. Earthmoving Destroyers 68,85 %2. Concrete 36.85 %3. Masonry coatings 100,00 %4. Networks (Hydraulic Electrics) 99,58 %5. Coatings 100,00 %6. Constructions Wooden Metal 100,00 %7. Other Finishes 92,85 % (English)
    2 July 2021
    0 references

    Identifiers

    5.003.754
    0 references