Improvement of energy efficiency of the Jūrmala City Kauguru Secondary School building (Q3057131): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Removed claim: co-financing rate (P837): 0.47 percent) |
||||||
Property / co-financing rate | |||||||
| |||||||
Property / co-financing rate: 0.47 percent / rank | |||||||
Revision as of 09:37, 27 September 2021
Project Q3057131 in Latvia
Language | Label | Description | Also known as |
---|---|---|---|
English | Improvement of energy efficiency of the Jūrmala City Kauguru Secondary School building |
Project Q3057131 in Latvia |
Statements
512,648.6 Euro
0 references
1,094,020.57 Euro
0 references
20 December 2018
0 references
31 March 2020
0 references
Jūrmalas pilsētas dome
0 references
Projekta mērķis - samazināt primārās enerģijas gada patēriņu Kauguru vidusskolas ēkā, Raiņa ielā 118, Jūrmalā par 76,46 kWh/m2, veicot ieguldījumus pašvaldības ēkā sekmēt energoefektivitātes paaugstināšanu un pašvaldības izdevumu samazināšanos par siltumapgādi. Projekta ietvaros plānots veikt šadus pasākumus: 1. Ēkas fasādes ārsienu, pamatu, cokola un aiļu siltināšanu; 2. Augšējā pārseguma (jumta plaknes) siltināšanu, jauna jumta seguma izveidošana; 3. Veco koka logu, PVC logu sporta zālē un durvju nomaiņu uz jauniem blīviem logiem un durvīm;4. Apkures sistēmas pārbūvi, t.sk. siltummezgla modernizāciju;5. Jauna LED tipa energoefektīva apgaismojuma uzstādīšanu un jaunu iekšējās elektroinstalācijas sistēmas izbūvi. Projekta īstenošanas rezultātā plānotais vidējais siltumenerģijas patēriņš apkurei pēc renovācijas – 66,01 kWh/m2 gadā, primārās enerģijas gada patēriņa samazinājums pēc darbu pabeigšanas – 76,46 kWh/m2 gadā, aprēķinātais siltumnīcefekta gāzu samazinājums gadā (CO2 ekvivalents tonnās) – 107,78 t gadā, kā arī veikta ēkas ar kopējo platību 5098,400 m2 energoefektivitātes paaugstināšana. Projekta kopējās izmaksas -1 444 644.39 EUR, t.sk. Eiropas Reģionālās attīstības fonda līdzfinansējums - 512 648,60 EUR; Valsts budžeta dotācija - 87 204,38 EUR; Pašvaldības finansējums - 494 167,59 EUR Neattiecināmās izmaksas - 350 623.82EUR.Projektu plānots īstenot 16 (sešpadsmit) mēnešos. (Latvian)
0 references
The aim of the project – to reduce the annual consumption of primary energy in Kauguru Secondary School building, Raiņa street 118, Jurmala by 76.46 kWh/m², by investing in municipal building to promote energy efficiency and reduction of municipal expenditure on heating. Within the project it is planned to take the following measures: 1. Insulation of facade walls, foundations, plinths and columns of the building; 2. Insulation of upper cover (roof plane), creation of new roofing; 3. Replacement of old wooden windows, PVC windows in the gym and doors to new dense windows and doors;4. Reconstruction of the heating system, including modernisation of the heating unit;5. Installation of new LED-type energy efficient lighting and construction of new internal wiring system. The project results in the planned average heat consumption for heating after renovation – 66,01 kWh/m² per year, reduction of annual primary energy consumption after completion of works – 76.46 kWh/m² per year, estimated annual greenhouse gas reduction (CO2 equivalent tons) – 107.78 t per year, as well as improvement of energy efficiency of a building with a total area of 5098.400 m². Total cost of the project – EUR 1444644.39, incl. Co-financing from the European Regional Development Fund – EUR 512648,60; State budget grant – EUR 87204,38; Municipal funding – EUR 494167,59 ineligible costs – EUR 350623.82. The project is planned to be implemented in 16 (sixteen) months. (English)
15 July 2021
0 references
Raiņa iela 118, Jūrmala, LV-2016
0 references
Identifiers
4.2.2.0/18/I/011
0 references