Reconstruction of heating networks in the city of Krāslava (Q3057263): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: co-financing rate (P837): 0.4 percent) |
(Changed an Item: modifying co-finance rate with the percentage) |
||||||
Property / co-financing rate | |||||||
40.0 percent
| |||||||
Property / co-financing rate: 40.0 percent / rank | |||||||
Normal rank |
Revision as of 09:20, 27 September 2021
Project Q3057263 in Latvia
Language | Label | Description | Also known as |
---|---|---|---|
English | Reconstruction of heating networks in the city of Krāslava |
Project Q3057263 in Latvia |
Statements
293,524.75 Euro
0 references
733,811.88 Euro
0 references
40.0 percent
0 references
11 May 2018
0 references
10 February 2020
0 references
Sabiedrība ar ierobežotu atbildību "Krāslavas nami"
0 references
Galvenais projekta mērķis ir samazināt siltumenerģijas un siltumnesēja zudumus pārvades un sadalēs sistēmās, rekonstruējot siltumtīklus, rekonstruējot siltumapgādes sistēmu ar otrā tipa rūpnieciski izolētām caurulēm. Galvenajam projekta mērķim pakārtoti projekta specifiskie mērķi, kuri ir vērsti uz integrētu pieeju augstāk minētās problēmas risinājumam:•Nodrošināt Krāslavas centralizētās siltumapgādes sistēmas patērētājiem stabilu un drošu siltumapgādi par pieņemamu cenu – t.i. tehnoloģiskajam risinājumam ir jāpaaugstina siltumapgādes kvalitāte par cenu, kas neatstāj negatīvu iespaidu uz patērētāju un energoapgādes uzņēmuma maksātspēju un attīstību;•Samazinot siltumenerģijas zudumus pārvades un sadales sistēmās, paaugstināt kurināmā izmantošanas efektivitāti un, atbilstoši, samazināt gaisu piesārņojošo vielu emisiju apjomu apkārtējā vidē.Īstenojot projektu, SIA „Krāslavas nami”, iegūs efektīvāku siltumapgādes tīklu ar zemākiem siltuma zudumiem. Siltumu zudumu samazināšana siltumtīklos radīs arī izmešu samazinājumu apkārtējā vidē. Modernizējot siltumtīklus, tiks panākta stabila un pietiekama siltuma piegāde gala patērētājiem. Pēc projekta īstenošana ekspluatācijā tiks nodota vienota siltumapgādes sistēma, kura paaugstinās arī uzņēmuma vērtību un gan finansiālās, gan saimnieciskās darbības stabilitāti.No veiktajiem aprēķiniem var secināt, ka zudumi rekonstruētā posmā būs 279 MWh, kas samazinās kopējos sistēmas zudumus par 753 MWh gadā līdz 10 033 MWh, kas nozīmē, ka tīklos tiks nodots 35738 MWh. Proporcionāli zudumiem samazinās arī elektroenerģijas par 12 000 kWh gadā.Paredzams, ka projekts tiks īstenots 21 mēnešu laikā no līguma ar CFLA noslēgšanas brīža par KF līdzfinansējuma piesaisti. Tā kopējās izmaksas varētu sasniegt ap EUR 944 398 no kā aptuveni EUR 293 525 sastādīt KF līdzfinansējums. (Latvian)
0 references
The main aim of the project is to reduce losses of thermal energy and heat transferr in transmission and distribution systems by reconstructing heat networks, reconstruction of heating system with industrially insulated pipes of the second type. According to the main objective of the project, the specific objectives of the project are aimed at an integrated approach to the solution of the above mentioned problem:•To ensure stable and safe heating supply for consumers of the district heating system in Krāslava for an affordable price – i.e. technological solution must increase the quality of heating at a price that does not have a negative impact on the solvency and development of consumers and the energy supply company;•Less heat losses in transmission and distribution systems, increase fuel efficiency and, accordingly, reduce air pollutants emissions in the environment, will become more efficient in the environment. Reducing heat losses in heat networks will also lead to a reduction of emissions in the environment. Retrofitting of heat networks will ensure a stable and sufficient supply of heat to final consumers. After the implementation of the project a unified heating system will be put into operation, which will increase the value of the company and both financial and business stability.From the calculations made it can be concluded that losses in the reconstructed stage will be 279 MWh, which will reduce the total system losses by 753 MWh per year to 10033 MWh, which means that 35738 MWh will be transferred to the networks. It is expected that the project will be implemented within 21 months of the conclusion of the contract with the CFLA for attracting co-funding of the CF. Its total cost could amount to around EUR 944 398 of which the CF co-funding approximately EUR 293 525. (English)
15 July 2021
0 references
Krāslava, Krāslavas nov.
0 references
Identifiers
4.3.1.0/17/A/084
0 references