Bypass BACAU (Q3095668): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: co-financing rate (P837): 0.85 percent) |
(Changed an Item: modifying co-financing rates in romania) |
||||||
Property / co-financing rate | |||||||
85.0 percent
| |||||||
Property / co-financing rate: 85.0 percent / rank | |||||||
Normal rank |
Revision as of 14:15, 24 September 2021
Project Q3095668 in Romania
Language | Label | Description | Also known as |
---|---|---|---|
English | Bypass BACAU |
Project Q3095668 in Romania |
Statements
689,436,848.6 Romanian Leu
0 references
811,102,174.8 Romanian Leu
0 references
85.0 percent
0 references
9 January 2012
0 references
31 December 2023
0 references
COMPANIA NAŢIONALĂ DE ADMINISTRARE A INFRASTRUCTURII RUTIERE S.A./Departament Documentatii Obtinere Fonduri Externe
0 references
The general objective of the project, as defined in the GTMP, is to improve the economic efficiency of the national transport network in Romania by reducing travel times on the TEN-T Core network, as well as to provide improved connectivity between national economic growth poles, for both passenger and freight transport. The project is intended to achieve the following general objectives: • Ensuring safe and comfortable travel as a result of high quality infrastructure and removing transit traffic from the urban areas; • Improvement of infrastructure, with direct impact on improving quality of life and living environment; • Contribution to establishment of appropriate conditions for sustainable economic growth in the region; • Improvement of performance of the national and TEN-T road network by increasing travel speeds and reducing travel time and operating costs; • Reduction of exposure of people living along the existing national road to air pollution, noise and traffic accidents. After the project is finalized, it will contribute to the accomplishment of the general objective of POIM 2014-2020, Priority Axis no. 1 Improving mobility by developing the TEN-T and subway network, Specific Objective 1.1: “Increasing mobility on the central TEN-T road network”. (Romanian)
0 references
The general objective of the project, as defined in the GTMP, is to improve the economic efficiency of the national transport network in Romania by reducing travel times on the TEN-T Core network, as well as to provide improved connectivity between national economic growth poles, for both passenger and freight transport. The project is intended to achieve the following general objectives: • Ensuring safe and comfortable travel as a result of high quality infrastructure and removing transit traffic from the urban areas; • Improvement of infrastructure, with direct impact on improving quality of life and living environment; • Contribution to establishment of appropriate conditions for sustainable economic growth in the region; • Improvement of performance of the national and TEN-T road network by increasing travel speeds and reducing travel time and operating costs; • Reduction of exposure of people living along the existing national road to air pollution, noise and traffic accidents. After the project is Finalised, it will contribute to the Accomplishment of the general objective of LIOP 2014-2020, Priority Axis no. 1 Improving mobility by developing the TEN-T and subway network, Specific Objective 1.1: “Increasing mobility on the central TEN-T road network”. (English)
16 September 2021
0 references
Municipiul Bacău, Romania
0 references
Identifiers
120235
0 references