Elaboration of Feasibility Study and Technical Execution Project for DN73C Connection with Sibiu – Pitesti Highway (Nod Tigveni) and DN73C Modernisation (km 44+ 800 – km 68+ 000) (Q3095601): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: co-financing rate (P837): 0.85 percent) |
(Changed an Item: modifying co-financing rates in romania) |
||||||
Property / co-financing rate | |||||||
85.0 percent
| |||||||
Property / co-financing rate: 85.0 percent / rank | |||||||
Normal rank |
Revision as of 14:14, 24 September 2021
Project Q3095601 in Romania
Language | Label | Description | Also known as |
---|---|---|---|
English | Elaboration of Feasibility Study and Technical Execution Project for DN73C Connection with Sibiu – Pitesti Highway (Nod Tigveni) and DN73C Modernisation (km 44+ 800 – km 68+ 000) |
Project Q3095601 in Romania |
Statements
3,419,404.3 Romanian Leu
0 references
4,022,828.59 Romanian Leu
0 references
85.0 percent
0 references
1 June 2020
0 references
31 December 2021
0 references
COMPANIA NAŢIONALĂ DE ADMINISTRARE A INFRASTRUCTURII RUTIERE S.A./Departament Documentatii Obtinere Fonduri Externe
0 references
Avand in vedere ca transporturile reprezinta motorul economiei, la nivel national si european, se doreste sustinerea unei dezvoltari economice sustenabile plecand de la asigurarea unei infrastructuri corespunzatoare. Din pacate, la ora actuala pe cea mai mare parte din retea, drumurilor care deservesc coridoare Pan Europene de transport, inclusiv TEN-T CORE si Comprehensive, in solutia existenta nu le sunt asigurate capacitati de circulatie corespunzatoare si nici conditii optime de siguranta la nivelul desfasurarii circulatiei rutiere. Obiectivul general al proiectului este de a spori eficiența tehnico-economică a rețelei de transport din România si de a aduce îmbunatatiri în ceea ce privește viteza de călătorie, îmbunatatind de asemenea conectivitatea la nivel regional si conditiile traficului de marfuri ce va fi asigurat prin drumul national DN 73C, respectiv drumul de legatura ce asigura conexiunea cu Autostrada Sibiu – Pitesti, in zona Tigveni (mai exact a nodului rutier de la Tigveni). Realizarea prezentului proiect - faza elaborare Studiu de Fezabilitate si Proiect Tehnic pentru “Realizare conexiune DN73C cu Autostrada Sibiu - Pitesti (Nod Tigveni) si Modernizare DN73C (km 44+800 - km 68+000)” contribuie la indicatorul de rezultat 2S81 - Cerere de finanțare transmisă, spre analiză și aprobare la AMPOIM/OIT. (Romanian)
0 references
Given that transport is the engine of the economy, at national and European level, it is desirable to support a sustainable economic development starting from the provision of proper infrastructure. Unfortunately, at present on most of the network, roads serving Pan European transport corridors, including TEN-T CORE and Comprehensive, are not provided with adequate traffic capacities or optimal safety conditions at road level. The general objective of the project is to increase the technical and economic efficiency of the transport network in Romania and to bring improvements in travel speed, also improving the connectivity at regional level and the conditions of goods traffic that will be provided through the national road DN 73C, namely the connecting road that connects with the Sibiu – Pitesti Highway, in the Tigveni area (i.e. the Tigveni road node). Implementation of the present project – Phase of Feasibility Study and Technical Project for “Delivering DN73C connection with Sibiu – Pitesti Highway (Nod Tigveni) and DN73C Modernisation (km 44+ 800 – km 68+ 000)” contributes to the result indicator 2S81 – Grant application submitted for analysis and approval at AMPOIM/ITO. (English)
14 September 2021
0 references
Tigveni, Romania
0 references
Identifiers
129996
0 references