Complex renovation of the building No. 48 – Social-operational building (Q3100675): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
(‎Removed claims)
Property / beneficiary name (string)
Ústav na výkon trestu odňatia slobody
 
Property / beneficiary name (string): Ústav na výkon trestu odňatia slobody / rank
Normal rank
 
Property / summary
Ciežom projektu je dosiahnu komplexné riešenie energetickej hospodárnosti administratívnej budovy s ubytovňou zabezpečujúce energetickú efektívnos budovy pri jej užívaní a zníženie energetickej náročnosti (skutočnej spotreby energie). Uvedená budova sa nachádza v areály Ústavu na výkon trestu odňatia slobody Želiezovce.  Ubytovanie situované v objekte sa využíva hlavne na ubytovanie vlastných príslušníkov a zamestnancov zboru zo všetkých 18 ústavov zboru počas organizovaných aktivít bezodplatne. Zbor vykonáva svoju činnos v zmysle zákona č. 4/2001 Z.z. o Zbore väzenskej a justičnej stráže v znení neskorších predpisov.Úlohou projektu je rieši problematiku znižovania náročnosti a spotreby energie v budove zlepšením tepelnej ochrany budovy vrátane jej zateplenia, zmenami v technických systémoch a vybudovaním nových udržatežných technológií, ktoré trvalo znížia emisie spôsobené tradičným vykurovaním budovy. Projekt zahŕňa aj realizáciu zariadení produkujúcich energiu z obnovitežných zdrojov energie. Navrhovanými technologickými opatreniami sa dosiahne výrazná úspora potreby energie verejnej budovy. (Slovak)
 
Property / summary: Ciežom projektu je dosiahnu komplexné riešenie energetickej hospodárnosti administratívnej budovy s ubytovňou zabezpečujúce energetickú efektívnos budovy pri jej užívaní a zníženie energetickej náročnosti (skutočnej spotreby energie). Uvedená budova sa nachádza v areály Ústavu na výkon trestu odňatia slobody Želiezovce.  Ubytovanie situované v objekte sa využíva hlavne na ubytovanie vlastných príslušníkov a zamestnancov zboru zo všetkých 18 ústavov zboru počas organizovaných aktivít bezodplatne. Zbor vykonáva svoju činnos v zmysle zákona č. 4/2001 Z.z. o Zbore väzenskej a justičnej stráže v znení neskorších predpisov.Úlohou projektu je rieši problematiku znižovania náročnosti a spotreby energie v budove zlepšením tepelnej ochrany budovy vrátane jej zateplenia, zmenami v technických systémoch a vybudovaním nových udržatežných technológií, ktoré trvalo znížia emisie spôsobené tradičným vykurovaním budovy. Projekt zahŕňa aj realizáciu zariadení produkujúcich energiu z obnovitežných zdrojov energie. Navrhovanými technologickými opatreniami sa dosiahne výrazná úspora potreby energie verejnej budovy. (Slovak) / rank
Normal rank
 
Property / summary
The aim of the project is to achieve a comprehensive solution to the energy performance of an administrative building with a hostel ensuring the energy efficiency of the building while using it and reducing the energy intensity (real energy consumption). The building is located in the premises of the Institute for the Administration of Penalty of Eliezovce.  Accommodation situated in the building is mainly used for accommodation of its own members and staff of the choir from all 18 institutions of the choir during organised activities free of charge. The Corps performs its activities in accordance with Act No. 4/2001 Coll. on the Corps of Prison and Judicial Guard as amended by the late regulations. The task of the project is to address the issue of reducing the intensity and energy consumption in the building by improving the thermal protection of the building, including its insulation, changes in technical systems and the construction of new ventilation technologies that will permanently reduce emissions caused by traditional heating of the building. The project also includes the implementation of plants producing energy from renewable energy sources. The proposed technological measures will achieve significant energy savings in the public building. (English)
 
Property / summary: The aim of the project is to achieve a comprehensive solution to the energy performance of an administrative building with a hostel ensuring the energy efficiency of the building while using it and reducing the energy intensity (real energy consumption). The building is located in the premises of the Institute for the Administration of Penalty of Eliezovce.  Accommodation situated in the building is mainly used for accommodation of its own members and staff of the choir from all 18 institutions of the choir during organised activities free of charge. The Corps performs its activities in accordance with Act No. 4/2001 Coll. on the Corps of Prison and Judicial Guard as amended by the late regulations. The task of the project is to address the issue of reducing the intensity and energy consumption in the building by improving the thermal protection of the building, including its insulation, changes in technical systems and the construction of new ventilation technologies that will permanently reduce emissions caused by traditional heating of the building. The project also includes the implementation of plants producing energy from renewable energy sources. The proposed technological measures will achieve significant energy savings in the public building. (English) / rank
Normal rank
 
Property / summary: The aim of the project is to achieve a comprehensive solution to the energy performance of an administrative building with a hostel ensuring the energy efficiency of the building while using it and reducing the energy intensity (real energy consumption). The building is located in the premises of the Institute for the Administration of Penalty of Eliezovce.  Accommodation situated in the building is mainly used for accommodation of its own members and staff of the choir from all 18 institutions of the choir during organised activities free of charge. The Corps performs its activities in accordance with Act No. 4/2001 Coll. on the Corps of Prison and Judicial Guard as amended by the late regulations. The task of the project is to address the issue of reducing the intensity and energy consumption in the building by improving the thermal protection of the building, including its insulation, changes in technical systems and the construction of new ventilation technologies that will permanently reduce emissions caused by traditional heating of the building. The project also includes the implementation of plants producing energy from renewable energy sources. The proposed technological measures will achieve significant energy savings in the public building. (English) / qualifier
point in time: 15 September 2021
Timestamp+2021-09-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 

Revision as of 13:48, 24 September 2021

Project Q3100675 in Slovakia
Language Label Description Also known as
English
Complex renovation of the building No. 48 – Social-operational building
Project Q3100675 in Slovakia

    Statements

    0 references
    390,275.32 Euro
    0 references
    459,147.44 Euro
    0 references
    0.85 percent
    0 references
    1 March 2017
    0 references
    1 December 2019
    0 references
    0 references

    48°2'49.52"N, 18°39'16.45"E
    0 references

    Identifiers

    310041A315
    0 references