Cycle path H2 (Solinky centre) section I. (Q3102500): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
Property / beneficiary
 
Property / beneficiary: Q3120060 / rank
 
Normal rank

Revision as of 22:06, 23 September 2021

Project Q3102500 in Slovakia
Language Label Description Also known as
English
Cycle path H2 (Solinky centre) section I.
Project Q3102500 in Slovakia

    Statements

    0 references
    119,509.86 Euro
    0 references
    140,599.84 Euro
    0 references
    0.85 percent
    0 references
    1 April 2020
    0 references
    1 September 2020
    0 references
    Mesto Žilina
    0 references
    0 references

    49°12'23.87"N, 18°46'19.88"E
    0 references
    Predmetom projektu je zvýšenie atraktivity a prepravnej kapacity nemotorovej dopravy na celkovom počte prepravených osôb v meste Žilina, prostredníctvom dobudovania kžúčového úseku chýbajúcej časti cyklotrasy H2. Mesto Žilina patrí k jedným z najznečistenejších miest Slovenska. Prioritou mesta je preto aj budovanie cyklotrás ako odpoveď na zvyšovanie dopravného zaaženia priamo v meste a v jeho blízkom okolí. Realizáciou projektu dôjde k výstavbe I. úseku chýbajúcej časti cyklotrasy H2 v meste Žilina. Plánovaná cyklotrasa H2 napojí sídliska Solinky a Hliny I-VI na centrum, v opačnom smere pokračuje trasa až do Bytčice s možnosou napojenia na  Rajeckú cyklomagistrálu. Čas cyklotrasy H2 v centre mesta už bola vybudovaná z vlastných zdrojov mesta. Mesto ďalej riešilo majetko – právne vysporiadania k povožovacím procesom aj na ostatné časti cyklotrasy H2. Ako prvé bolo vydané stavebné povolenie na I. a III. úsek chýbajúcej časti H2. Najdlhší I. úsek je predmetom projektu, III. úsek nie je možné realizova, kým nebude stavebným úradom povolený aj II. úsek chýbajúcej časti cyklotrasy H2. Zostávajúce dva úseky (II. a IV. úsek) sú v povožovacích procesoch, prebieha majetko – právne vysporiadanie. Snahou mesta Žilina je však v čo najkratšej dobe dobudova všetky chýbajúce úseky cyklotrasy H2 zo Soliniek do centra mesta. Následne aj v opačnom smere na mestskú čas Bytčica. Takto by bola dobudovaná cyklotrasa H2, ktorá je v rámci koncepcie mestských cyklistických komunikácií mesta Žilina zaradená medzi hlavné cyklotrasy. Zvolená aktivita projektu umožní rozšíri existujúcu čas cyklistického úseku H2  o úsek v mestskej časti sídliska Solinky a zároveň umožní napojenie cyklotrasy H2 na dobudovaný cyklochodník V6. Takto sa mesto snaží dobudova čo najcelistvejšie úseky pre nemotorovú dopravu v meste a tým odžahči komunikácie od automobilovej dopravy s pozitívnym dopadom na životné prostredie. Projekt prispeje k podpore bezpečnej a ekologickej doprave v meste Žilina. Zároveň sa predpokladá zvýšenie atraktivity a prepravnej kapacity cyklistickej dopravy, čo je aj hlavným ciežom projektu. Na základe uvedených prínosov a očakávaných ciežov projektu môžeme konštatova, že predkladaný projekt je v priamom súlade so stratégiou IROP, konkrétne špecifickým ciežom 1.2.2.Projekt bude určený pre obyvatežov mesta Žilina, ako aj ich návštevníkov. Realizovaný bude prostredníctvom 1 hlavnej aktivity na stavebné práce a jednoznačne meratežný prostredníctvom 1 zvoleného ukazovateža: „Dĺžka nových úsekov cyklistických komunikácií“: 0,835 km. (Slovak)
    0 references
    The subject of the project is to increase the attractiveness and transport capacity of non-motorised transport to the total number of passengers transported in the town of ilina, through the completion of the key section of the missing part of the H2 cycle path. The town of ilina is one of the most polluted cities in Slovakia. The priority of the city is therefore the construction of cycling routes in response to the increase of traffic in the city and its surroundings. The implementation of the project will lead to the construction of the I. section of the missing part of the cycle path H2 in the town of ilina. The planned cycle route H2 connects the settlement Solinky and Hliny I-VI to the center, in the opposite direction continues the route and to Bytčice with a monosouth connection to the Rajecka Cyclingmagistral. The time of the H2 cycle path in the city center u was built from the city’s own resources. The city further dealt with the possession of legal settlements to the promotion processes also for other parts of the H2 cycle path. First, the building permit was issued for the I. and III. section of the missing H2. The most long I. section is the subject of the project, the III section is not possible to implement until the construction authority is also allowed the II. section of the missing part of the cycle path H2. The remaining two sections (sections II and IV) are in the process of cultivating, legal settlement is taking place. The aim of ilina is to complete all the missing sections of the H2 cycle path from Soliniek to the city center in the shortest possible time. Then in the opposite direction to the city time Bytčica. In this way, the H2 cycle route, which is included among the main cycling routes of the city of ilina as part of the concept of urban cycling roads, would be completed. The selected project activity will expand the existing time of the cycle section H2 by a section in the municipal district of the Solinky settlement and at the same time will monetise the connection of the H2 cycle path to the completed cycle path V6. In this way, the city strives to complete as many sections as possible for non-motorised traffic in the city and thus make it easy to communicate from car transport with a positive impact on the environment. The project will contribute to the promotion of safe and environmentally friendly transport in ilina. At the same time, it is envisaged to increase the attractiveness and transport capacity of cycling, which is also the main objective of the project. On the basis of the above benefits and the expected objectives of the project, we can account that the submitted project is directly in line with the IROP strategy, namely the specific objective 1.2.2. The project will be designed for residents of the city of ilina as well as their visitors. It will be realised through 1 main activity for construction works and clearly measured through 1 selected indicator: A lot of new cycling roads: 0.835 km. (English)
    15 September 2021
    0 references

    Identifiers

    302011P420
    0 references