Reduction of energy consumption during operation of the Municipal Office (Q3100676): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
Property / beneficiary
 
Property / beneficiary: Q3120647 / rank
 
Normal rank

Revision as of 21:03, 23 September 2021

Project Q3100676 in Slovakia
Language Label Description Also known as
English
Reduction of energy consumption during operation of the Municipal Office
Project Q3100676 in Slovakia

    Statements

    0 references
    332,303.53 Euro
    0 references
    390,945.33 Euro
    0 references
    0.85 percent
    0 references
    1 December 2018
    0 references
    1 July 2019
    0 references
    Mesto Želiezovce
    0 references
    0 references

    48°2'49.52"N, 18°39'16.45"E
    0 references
    Predkladaný projekt rieši zateplenie objektu mestského úradu v Želiezovciach. Jedná sa o murovaný objekt s jedným podzemným a štyrmi nadzemnými podlažiami, ktorý je zastrešený valbovou strechou s vikiermi. V suteréne je riešené prevažne technické zázemie objektu, sklady. V nadzemných podlažiach sa nachádzajú kancelárie, soc.-hygienické a spoločenské priestory. Na objekte sa navrhuje kompletné zateplenie fasády, zateplenie časti stropu nad podzemným podlažím a zateplenie strešnej konštrukcie objektu. Vzhžad objektu sa po vykonaní rekonštrukcie výrazne nezmení, odlišné bude farebné riešenie objektu. Na západnej strane objektu je navrhnutá betónová rampa umožňujúca bezbariérový prístup do objektu s protišmykovou povrchovou úpravou. (Slovak)
    0 references
    Submitted project solution insulation of the building of the municipal office in eliezovce. It is a brick building with one underground and tyrmi aboveground floors, which is covered with a hipped roof with dormers. In the basement is solved mainly technical background of the building, warehouses. In the above ground floors there are offices, sanitary and social spaces. The building proposes complete insulation of the facade, insulation of the part of the ceiling above the underground floor and thermal insulation of the structure of the building. The object will not change significantly after reconstructing, different will be the color solution of the object. On the west side of the building is designed concrete ramp allowing barrier-free access to the building with anti-lock coating. (English)
    15 September 2021
    0 references

    Identifiers

    310041A591
    0 references