Expansion of capacity M railway 74, Pova ská Bystrica (Q3100867): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
Property / beneficiary
 
Q3120055 (Deleted Item)
Property / beneficiary: Q3120055 (Deleted Item) / rank
 
Normal rank

Revision as of 20:56, 23 September 2021

Project Q3100867 in Slovakia
Language Label Description Also known as
English
Expansion of capacity M railway 74, Pova ská Bystrica
Project Q3100867 in Slovakia

    Statements

    0 references
    389,216.72 Euro
    0 references
    457,902.02 Euro
    0 references
    0.85 percent
    0 references
    1 September 2018
    0 references
    1 August 2020
    0 references
    Mesto Považská Bystrica
    0 references
    Q3120055 (Deleted Item)
    0 references

    49°7'0.91"N, 18°26'53.34"E
    0 references
    Materská škola Železničná v Meste Považská Bystrica má momentálnu kapacitu 183 detí. Objekt bol postavený v roku  1977 podža projektovej dokumentácie a stavebno-technických požiadaviek a noriem platných v tom období, v súčasnosti už nevyhovuje technickým požiadavkám a neposkytuje priestor pre rozšírenie kapacity školy bez stavebných úprav a nadstavby. Má 7 riadnych tried s príslušenstvom, hospodársky pavilón s kuchyňou, práčovňou a priestormi pre administratívu. Pre vežký záujem o umiestnenie detí v MŠ sú triedy napĺňané na maximálne možnú hranicu. Ciež sa dosiahne prestavbou a nadstavbou jestvujúceho pavilónu „D“, čím sa priestorovo dosiahne zvyšovanie kapacít miest o 40 detí, ako aj zníženie energetickej náročnosti budovy. Realizáciou projektu sa tiež rieši úprava vonkajšieho areálu, detského ihriska a obstaranie potrebného materiálno-technického vybavenia tried. (Slovak)
    0 references
    The Maternity Round Railway in Povaská Bystrica has a current capacity of 183 children. The building was built in 1977 under the design documentation and building and technical requirements and standards applicable at that time, currently it does not meet the technical requirements and does not provide space for expansion of the capacity of the wheel without building modifications and superstructure. It has 7 regular classes with accessories, an economic pavilion with kitchen, laundry and administrative space. For a great interest in the placement of children in M, the classes are filled to the maximum possible limit. The aim is to be achieved through the conversion and superstructure of the existing Pavilion D, thus achieving spatially increasing the capacity of the cities by 40 children, as well as reducing the energy intensity of the building. The implementation of the project also solves the adjustment of the outdoor area, children’s playground and the acquisition of the necessary material and technical equipment classes. (English)
    15 September 2021
    0 references

    Identifiers

    302021H957
    0 references