Road reconstruction No. II/517 Pova ská Bystrica (most Orlové) – Domani a – ETAPA No. 1 (Q3100755): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the materialized bot - inferring region from the coordinates) |
(Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string) |
||
Property / beneficiary | |||
Property / beneficiary: Q3120080 / rank | |||
Normal rank |
Revision as of 20:54, 23 September 2021
Project Q3100755 in Slovakia
Language | Label | Description | Also known as |
---|---|---|---|
English | Road reconstruction No. II/517 Pova ská Bystrica (most Orlové) – Domani a – ETAPA No. 1 |
Project Q3100755 in Slovakia |
Statements
3,552,391.4 Euro
0 references
4,179,284.0 Euro
0 references
0.85 percent
0 references
1 July 2017
0 references
1 June 2021
0 references
Trenčiansky samosprávny kraj
0 references
Ciežom projektu je rekontrukcia cesty č. II/517 v dĺke 3,590 km vrátane mosta Orlové a ďalích dvoch mostných objektov. Projekt bude pozostáva z jednej hlavnej aktivity. Ciežovou skupinou budú obyvatelia Povaskej Bystrice a ostatní občania prechádzajúci regiónom vrátane prižahlých vidieckych oblastí. Meratežné ukazovatele tohto projektu sú: Celková dĺka rekontruovaných a renovovaných úsekov ciest (II. a III. triedy) - ciežová hodnota 3,590 km a úspora času v cestnej doprave na cestách II. a III. triedy - ciežová hodnota - 57 958 Eur. iadatež plánuje realizova aj ďalie etapy rekontrukcie cesty od km 3,590, ktorá pokračuje cez obec Prečín a končí v km 14,470 za obcou Domania. (Slovak)
0 references
The aim of the project is to reconstruct road No. II/517 in the length 3.590 km including the bridge Orlové and other two bridge objects. The project will consist of one main activity. The target group will be the inhabitants of Povaska Bystrica and other citizens passing through the region, including in rural areas. The measurement indicators of this project are: The total length of reconstructed and refurbished sections of roads (class II and III) – target value of 3.590 km and time savings in road traffic on II and III roads – target value – EUR 57 958. The request plans to implement further stages of the reconstruction of the road from km 3,590, which continues through the municipality of Prečín and ends in km 14,470 behind the village Domania. (English)
15 September 2021
0 references
Identifiers
302011F227
0 references