Topožníky – Sewage and treatment of WWTP (Q3100615): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the materialized bot - inferring region from the coordinates) |
(Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string) |
||
Property / beneficiary | |||
Property / beneficiary: Q3120051 / rank | |||
Normal rank |
Revision as of 20:54, 23 September 2021
Project Q3100615 in Slovakia
Language | Label | Description | Also known as |
---|---|---|---|
English | Topožníky – Sewage and treatment of WWTP |
Project Q3100615 in Slovakia |
Statements
11,400,432.56 Euro
0 references
13,412,273.6 Euro
0 references
0.85 percent
0 references
1 February 2017
0 references
1 December 2020
0 references
OBEC Topožníky
0 references
Na základe zistenia vysokej hladiny podzemných vôd - podloenými IG prieskumami z mája 2015 bola podmienená zmena návrhu v hĺbkovom uloení gravitačných kanalizačných stôk tak , aby v čo najminimálnejom rozsahu zasahovali pod hladinu podzemných vôd. Projektová dokumentácia dodrala z 90% pôvodne navrhnuté trasovanie stôk splakovej kanalizácie, s prepracovaním prietokov - podža prirodzeného spádu terénu , s prihliadnutím na zdokumentované hladiny podzemných vôd v zriadených sondách v rámci obce Topožníky. Projektová dokumentácia riei v celo-obecnom meradle - odvádzanie splakových vôd systémom gravitačných kanalizačných stôk - v kombinácii s návrhom osadenia 19 ks novo-navrhnutých prečerpávacích kanalizačných staníc, včetne výtlačných potrubí do najbliích kanalizačných achiet - včetne napojenia IBV na celoobecnú kanalizáciu. Stavba bude slúi na odvedenie splakových odpadových vôd zo záujmového územia obce - od nehnutežností v celoobecnom rozsahu - na budovanú čistiareň odpadových vôd v Topožníkoch. Stavba je z ekologického hžadiska významnou stavbou. (Slovak)
0 references
On the basis of the findings of the high groundwater level – the underlying IG surveys of May 2015, a change in the design of the deep storage of gravitational sewerage was made conditional on it reaching below the groundwater level to the minimum extent possible. Project documentation of 90 % originally designed route of sewage channels, with reworking of flows – under the natural slope of the terrain, taking into account documented groundwater levels in established probes within the village Topožníky. Project documentation on a whole-municipal scale – drainage of sewage by the system of gravity sewerage – in combination with the proposal to install 19 pcs of newly designed pumping sewer stations, including discharge pipes to the nearest sewer achets – including connections of IBV to the municipal sewerage system. The building will be used to remove sewage from the municipality’s interest area – from non-municipalities – to the built wastewater treatment plant in Topožníky. The building is an important building from the ecological hut. (English)
15 September 2021
0 references
Identifiers
310011A121
0 references