Construction of Gajle III photovoltaic power plant up to 1 MW (Q2717282): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed claim: EU contribution (P835): 486,292.75 euro)
(‎Changed claim: budget (P474): 607,865.93 euro)
Property / budget: 607,865.93 Euro / rankProperty / budget: 607,865.93 Euro / rank
Normal rank
Preferred rank

Revision as of 00:54, 22 September 2021

Project Q2717282 in Poland
Language Label Description Also known as
English
Construction of Gajle III photovoltaic power plant up to 1 MW
Project Q2717282 in Poland

    Statements

    0 references
    2,187,551.72 zloty
    0 references
    486,292.75 Euro
    0.2223 Euro
    0 references
    2,734,439.65 zloty
    0 references
    607,865.93 Euro
    0.2223 Euro
    0 references
    80.0 percent
    0 references
    16 March 2020
    0 references
    15 September 2020
    0 references
    PW GAJLE SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references
    0 references

    54°14'19.0"N, 20°7'32.9"E
    0 references
    Przedsięwzięcie dotyczy budowy elektrowni fotowoltaicznej o mocy do 0,932 MW na działce nr ew. 373/2, jednostka ewidencyjna 280205_5 Pieniężno, obręb 280205_5.0001 Białczyn podłączonej linią kablową położoną na działkach 373/2,384,385,301 Przedmiotem inwestycji jest budowa elektrowni słonecznej. Elektrownia składa się z wolnostojących paneli fotowoltaicznych, montowanych na konstrukcjach wsporczych wbijanych w grunt. Panele połączone są instalacją kablową ze skrzynkami sterowniczymi oraz stacją transformatorową. W stacji transformatorowej zamontowany jest licznik energii. Parametry planowanej instalacji: • Moc przyłączeniowa:933 kW • Moc zainstalowana :932 kW • Instalacja składać się będzie z 2742 paneli o mocy 340 W,14 falowników o mocy AC 60kVA,kontenerowej stacji trafo. Zakres robót dla całego zamierzenia oraz kolejność realizacji poszczególnych obiektów: • roboty budowlano-montaż. paneli fotowoltaicznych • roboty budowlano-montaż. kontenerowej stacji trafo 15/0,4kV • roboty ziemne • roboty montażowe • roboty w zakresie układania przewodów podziemnych, montaż skrzynek sterowniczych • roboty w zakresie budowy przyłącza Projekt posiada pełną dokumentację techniczną oraz wszelkie uzgodnienia i decyzje : decyzje środowiskową, warunki przyłączenia do sieci, pozwolenie na budowę. Realizacja projektu w przestawionym we wniosku zakresie uzależniona jest od uzyskania dotacji inwestycyjnej. Realizacja projektu zostanie poprzedzona wyborem wykonawcy zgodnie z zasadą konkurencyjności, zgodnie z zapisami sekcji 6.5.3 Wytycznych w zakresie kwalifikowalności wydatków w ramach EFRR,EFS i FS na lata 2014-2020 Realizacja projektu zaplanowana jest od 03 do 09. 2020 roku. Wartość kosztów bezpośrednio związanych z osiągnięciem wyższego poziomu ochrony środowiska wg wytycznych to 3531800,00 PLN, koszty kwalifikowalne po uwzględnieniu instalacji referencyjnej 2734439,65 PLN, wnioskowana wartość dotacji 2187551,72 PLN,Wnioskodawca zapewnia wkład własny. (Polish)
    0 references
    The project concerns the construction of a photovoltaic power plant with a capacity of up to 0,932 MW on plot no. 373/2, cadastral unit 280205_5 Money, area 280205_5.0001 Białczyn connected with a cable line located on plots 373/2,384,385,301 The object of the investment is the construction of a solar power plant. The power plant consists of free-standing photovoltaic panels mounted on support structures that are inserted into the ground. The panels are connected by cable installation with control boxes and transformer station. An energy meter is installed in the transformer station. Parameters of the planned installation: • Power przyłączeniowa:933 kW • Power zainstalowana:932 kW • The installation will consist of 2742 panels with a power of 340 W,14 inverters with the power of AC 60kVA, a container traft station. Scope of works for the whole purpose and order of realisation of individual objects: • construction works-assembly. photovoltaic panels • construction works-assembly. container station trafo 15/0.4 kV • earthworks • assembly works • underground pipe laying works, installation of control boxes • works in connection construction The project has full technical documentation and all arrangements and decisions: environmental decisions, grid connection conditions, building permit. The implementation of the project to the extent set out in the application depends on obtaining an investment grant. Implementation of the project will be preceded by the selection of the contractor in accordance with the principle of competitiveness, in accordance with the provisions of Section 6.5.3 of the Guidelines on eligibility of expenditure under ERDF, ESF and CF 2014-2020 The project implementation is planned from 03 to 09. 2020 The value of the costs directly linked to achieving a higher level of environmental protection according to the Guidelines is PLN 3531800.00, eligible costs after taking into account the reference installation PLN 2734439.65, the requested grant value PLN 2187551.72. The applicant shall provide its own contribution. (English)
    8 July 2021
    0 references

    Identifiers

    RPWM.04.01.00-28-0286/18
    0 references