Construction of photovoltaic micro-installation by SKIPAL (Q2717201): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed claim: EU contribution (P835): 37,564.25 euro)
Property / EU contribution: 37,564.25 Euro / rankProperty / EU contribution: 37,564.25 Euro / rank
Normal rank
Preferred rank

Revision as of 00:46, 22 September 2021

Project Q2717201 in Poland
Language Label Description Also known as
English
Construction of photovoltaic micro-installation by SKIPAL
Project Q2717201 in Poland

    Statements

    0 references
    168,980.0 zloty
    0 references
    37,564.25 Euro
    0.2223 Euro
    0 references
    198,800.0 zloty
    0 references
    44,193.24 Euro
    0.2223 Euro
    0 references
    85.0 percent
    0 references
    10 February 2020
    0 references
    30 June 2020
    0 references
    JANUSZ SKIBA ­ SKIPAL
    0 references
    0 references

    53°28'56.6"N, 21°21'34.9"E
    0 references
    Projekt dotyczy instalacji paneli fotowoltaicznych w istniejącej infrastrukturze Wnioskodawcy: Klon 74 dz. nr 282/1, 281 (KW OL1S/00038073/3). Projektowana instalacja fotowoltaiczna o łącznej mocy zainstalowanych paneli 40,02 kWp, będzie posadowiona na dachu budynku, zbudowana jest z 116 modułów o mocy 345 W. Optymalizatory mocy Optymalizatory mocy są przetwornikami DC/DC regulującymi napięcie układu. Urządzenia posiadają układ śledzący punkt mocy maksymalnej. Projektuje się zestaw złożony z 58 optymalizatorów mocy. Inwerter Projektuje się dwa inwertery 3-fazowe Konstrukcja System konstrukcji wsporczej umożliwia zamocowanie modułów fotowoltaicznych na dachu skośnym pokrytym dachówką. System oparty na uchwytach dachowych przytwierdzonych do krokwi. Etapy realizacji projektu: - złożenie wniosku o do?nansowanie - podpisanie umowy o do?nansowanie - wybór wykonawcy zgodnie z zasadą konkurencyjności - zawarcie umowy z wykonawcą i rozpoczęcie prac - realizacja prac zgodnie z założonym harmonogramem - zakończenie projektu i podpisanie protokołu końcowego - końcowe rozliczenie projektu sposób wdrażania zakr. rzeczowego: - podpisanie umowy - realizacja prac - odbiór końcowy i podpisanie protokołu końcowego Projekt wpisuje się w założenia wpisane w SzOOP RPOWiM realizując założony cel: Zwiększony udział OZE w ogólnym bilansie energetycznym regionu. Realizacja poddziałania pozwoli na zwiększenie udziału energii odnawialnej w bilansie energ. przedsiębiorstwa, co wpłynie na zwiększenie udziału energii odnawialnej w bilansie energ. Regionu. Wpłynie to na ograniczenie emisji szkodliwych gazów i pyłów do atmosfery oraz dzięki wykorzystaniu lokalnych źródeł energii odnawialnej zwiększy konkurencyjność ?rmy. W wyniku realizacji inwestycji spadną koszty związane z zużyciem energii. (Polish)
    0 references
    The project concerns the installation of photovoltaic panels in the Applicant’s existing infrastructure: Clone 74 d. No 282/1, 281 (KW OL1S/00038073/3). The designed photovoltaic installation with a total power of 40.02 kWp installed panels will be installed on the roof of the building, it is built with 116 modules with a power of 345 W. Power Optimisers Power Optimisers are DC/DC converters regulating the system voltage. The devices shall have a system that tracks the maximum power point. A set of 58 power optimisers is designed. Inverter Designs two 3-phase inverters The support structure system allows the installation of photovoltaic modules on the roof with an oblique roof covered with a roof tile. System based on roof holders attached to rafters. Stages of project implementation: — submission of an application for funding – signature of the grant agreement – selection of the contractor in accordance with the principle of competitiveness – conclusion of the contract with the contractor and commencement of works – execution of the works in accordance with the planned timetable – completion of the project and signing of the final protocol – final settlement of the project’s implementation method: — signing of the contract – implementation of works – final acceptance and signing of the final protocol The project is in line with the assumptions entered in the Polish Regional Development Office in order to achieve the objective of: Increased share of RES in the region’s overall energy balance. The implementation of the sub-measure will increase the share of renewable energy in the balance sheet of the company, which will increase the share of renewable energy in the energy balance sheet. The region. This will reduce emissions of harmful gases and dusts into the atmosphere and make use of local renewable energy sources more competitive. As a result of the investment, the costs associated with energy consumption will decrease. (English)
    8 July 2021
    0 references

    Identifiers

    RPWM.04.01.00-28-0134/17
    0 references