Construction of sanitary sewerage system in Grabówka in Dydnia Municipality (Q2711817): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed claim: EU contribution (P835): 150,703.49 euro)
(‎Changed claim: budget (P474): 177,298.23 euro)
Property / budget: 177,298.23 Euro / rankProperty / budget: 177,298.23 Euro / rank
Normal rank
Preferred rank

Revision as of 23:12, 21 September 2021

Project Q2711817 in Poland
Language Label Description Also known as
English
Construction of sanitary sewerage system in Grabówka in Dydnia Municipality
Project Q2711817 in Poland

    Statements

    0 references
    677,928.43 zloty
    0 references
    150,703.49 Euro
    0.2223 Euro
    0 references
    797,562.87 zloty
    0 references
    177,298.23 Euro
    0.2223 Euro
    0 references
    85.0 percent
    0 references
    5 May 2020
    0 references
    31 December 2021
    0 references
    GMINA DYDNIA
    0 references
    0 references

    49°41'15.7"N, 22°10'16.7"E
    0 references
    Głównym celem projektu jest ochrona środowiska naturalnego, w szczególności ochrona wód powierzchniowych,gruntowych, dostosowanie gospodarki wodno-ściekowej Gminy Dydnia do wymagań Polski i Unii Europejskiej, a tym samym przyczynienie się do realizacji celów polityki ekologicznej Unii Europejskiej, tj. ochrony, zachowania i poprawy jakości środowiska, ochrony zdrowia ludzkiego oraz oszczędnego i racjonalnego wykorzystania zasobów naturalnych. Zrealizowany projekt wpłynie pozytywnie na ochronę środowiska naturalnego chroniąc jego potencjał ekologiczny i podnosząc poziom życia mieszkańców gminy Dydnia. Uzbrojenie terenu w sieć kanalizacyjną zwiększy również atrakcyjność gminy dla inwestorów zewnętrznych co pośrednio przyczyni się do lokalnego wzrostu gospodarczego w tym wzrostu zatrudnienia. Zaplanowana w ramach projektu budowa sieci kanalizacji sanitarnej w systemie grawitacyjnym wraz z przyłączami do budynków mieszkalnych, budynku szkoły i budynku Domu Ludowego stworzy możliwość właścicielom nieruchomości włączenia istniejących instalacji sanitarnych w zbiorczy system oczyszczania ścieków komunalnych oraz wykonania podłączeń do nieruchomości, w których brakuje lokalnych systemów gromadzenia ścieków. Z nowo powstałego systemu kanalizacji korzystać będzie około 410 osób. Realizacja przedsięwzięcia pozwoli na likwidację nie spełniających warunków zbiorników bezodpływowych (szamb), szamb lokalnych oraz dołów kloacznych, a także na wyeliminowanie „dzikich” przyłączy do kanalizacji deszczowej, co wpłynie na poprawę oraz dalsze uporządkowanie gospodarki ściekowej na terenie Gminy Dydnia. (Polish)
    0 references
    The main objective of the project is to protect the environment, in particular the protection of surface waters and land waters, to adapt the water and wastewater management of Dydnia Municipality to the requirements of Poland and the European Union, thereby contributing to the achievement of the objectives of the European Union’s ecological policy, i.e. the protection, preservation and improvement of the quality of the environment, the protection of human health and the economic and rational use of natural resources. The implemented project will have a positive impact on the protection of the natural environment, protecting its ecological potential and increasing the living standards of residents of the municipality of Dydnia. Equipping the site with a sewage network will also increase the attractiveness of the municipality to external investors, which will indirectly contribute to local economic growth, including employment. The planned construction of the sanitary sewerage network in the gravitational system, together with connections to residential buildings, the school building and the building of the People’s House, will provide the possibility for property owners to include existing sanitary installations in the collective urban waste water treatment system and to make connections to real estates where local waste water collection systems are lacking. The newly established sewerage system will be used by around 410 people. The implementation of the project will allow for the elimination of non-compliant drainage tanks (septic tanks), local septic tanks and water pits, as well as the elimination of “wild” connections to the rainwater system, which will improve and further organise waste water management in the municipality of Dydnia. (English)
    8 July 2021
    0 references

    Identifiers

    RPPK.04.03.01-18-0034/17
    0 references