Thermomodernisation and modernisation of the building of the School Complex with Integration Branches at ul. Czarniecki in Tychy (Q2713183): Difference between revisions
Jump to navigation
Jump to search
(Changed claim: EU contribution (P835): 515,202.14 euro) |
(Changed claim: budget (P474): 606,120.16 euro) |
||
Property / budget: 606,120.16 Euro / rank | Property / budget: 606,120.16 Euro / rank | ||
Preferred rank |
Revision as of 23:04, 21 September 2021
Project Q2713183 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Thermomodernisation and modernisation of the building of the School Complex with Integration Branches at ul. Czarniecki in Tychy |
Project Q2713183 in Poland |
Statements
2,317,598.45 zloty
0 references
2,726,586.42 zloty
0 references
85.0 percent
0 references
19 December 2017
0 references
31 December 2021
0 references
GMINA MIASTA TYCHY
0 references
Przedmiotem projektu jest termomodernizacja i modernizacja budynku Zespół Szkół z Oddziałami Integracyjnymi przy ul. Czarnieckiego 22 w Tychach. Zakres obejmuje: - docieplenie ścian zewnętrznych styropianem gr. 14 cm, - docieplenie ścian przyziemia styropianem gr. 14 cm, - docieplenie strychu wełną mineralną gr. 19 cm, wykuszy oraz sufitu piwnic styropianem gr. 10 cm, - wymianę stolarki drzwiowej oraz okiennej, - wymianę instalacji c.o. wraz z grzejnikami oraz instalacji wod-kan, - wykonanie drenażu opaskowego wokół budynku, - wykonanie wentylacji mechanicznej z odzyskiem ciepła w sali gimnastycznej, - wymianę opraw oświetleniowych wewnętrznych oraz zewnętrznych na energooszczędne typu LED, - wymianę instalacji odgromowej, - roboty remontowo-modernizacyjne towarzyszące oraz elektryczne, - zagospodarowanie terenu, chodniki, - budowę windy osobowej dla uczniów niepełnosprawnych. W wyniku inwestycji zaoszczędzonych zostanie: 24,47 MWh/r e.e, 2055,80 GJ/r e.c., redukcja CO2 214,21 t/r. (Polish)
0 references
The subject of the project is thermomodernisation and modernisation of the building of the School Complex with Integration Branches at ul. Czarniecki 22 in Tychy. The scope includes: — warming of the external walls with styrofoam g. 14 cm, – warming of the walls with styrofoam g. 14 cm, – warming of the attic with mineral wool 19 cm, forging and ceiling of the basement with polystyrene g. 10 cm, – replacement of door and window joinery, – replacement of central heating installations together with radiators and water-wall installations, – execution of a band drain around the building, – execution of mechanical ventilation with heat recovery in the gym, – replacement of indoor and outdoor lighting fixtures with energy-saving LED type, – replacement of lightning system, – repair and modernisation works accompanying and electrical, – land development, pavement, – construction of a passenger lift for disabled students. The following will be saved as a result of the investment: 24,47 MWh/r e.e., 2055.80 GJ/r e.c., CO2 reduction 214,21 t/y. (English)
8 July 2021
0 references
Identifiers
RPSL.04.03.01-24-0020/19
0 references