Creation of a Regional Team of Accredited Research Laboratories and Modelling Department of the Cracow University of Technology (Q2708497): Difference between revisions
Jump to navigation
Jump to search
(Changed claim: EU contribution (P835): 2,435,170.17 euro) |
(Changed claim: budget (P474): 2,962,874.14 euro) |
||
Property / budget: 2,962,874.14 Euro / rank | Property / budget: 2,962,874.14 Euro / rank | ||
Preferred rank |
Revision as of 22:38, 21 September 2021
Project Q2708497 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Creation of a Regional Team of Accredited Research Laboratories and Modelling Department of the Cracow University of Technology |
Project Q2708497 in Poland |
Statements
10,954,431.72 zloty
0 references
13,328,268.74 zloty
0 references
82.19 percent
0 references
1 January 2020
0 references
29 December 2022
0 references
POLITECHNIKA KRAKOWSKA IM. TADEUSZA KOŚCIUSZKI
0 references
Projekt swym zakresem obejmuje utworzenie Regionalnego Zespołu Akredytowanych Laboratoriów Badawczych i Wzorcujących, prowadzącego prace oraz świadczącego usługi badawcze na światowym poziomie, na które składać się będą 3 laboratoria:1 Laboratorium Metrologii Współrzędnościowej LMW,2 Laboratorium Badań Technoklimatycznych i Maszyn Roboczych LBTiMR,3 Laboratorium Maszyn i Urządzeń Energetycznych LMiUE.W ramach przedmiotowej inwestycji zakupione zostaną specjalistyczne urządzenia laboratoryjne i specjalistyczna aparatura naukowobadawcza, szczegółowo opisane w pkt. C.2.3 wniosku o dofinansowanie.Dzięki zakupowi wyposażenia badawczego możliwe będzie świadczenie usług badawczych na najwyższym, światowym poziomie, dotyczących m.in. oceny jakości wytwarzania, koniecznego wzrostu dokładności pomiarów, opracowywania procedur badawczych wzorcujących wraz z ich wdrażaniem, badań technoklimatycznych maszyn, urządzeń i materiałów, badań wpływu środowiska na stan zdrowia, badań właściwości fizycznych i wytrzymałościowych materiałów i paliw stosowanych w energetycznej.Usługi badawcze będą prowadzone w obszarze wysoko zaawansowanych materiałów oraz technologii dla przemysłu.Laboratorium będzie wykorzystywane do działalności gospodarczej i niegospodarczej, przy czym:1. Podział na potrzeby weryfikacji mechanizmu monitorowania i wycofania kryterium czas wykorzystania: cz. gosp.: 40, cz. niegosp.: 60,2. Podział na potrzeby kryterium dostępowego i liczby punktów kryterium koszty: cz. gosp.: 35,15, cz. niegosp.: 64,85.Realizacja projektu przyczyni się do wykazania wskaźników produktu: Liczba jednostek naukowych ponoszących nakłady inwestycyjne na działalność BR, Liczba wspartych laboratoriów badawczych. (Polish)
0 references
The scope of the project includes the creation of a Regional Team of Accredited Research and Modeling Laboratories, carrying out work and providing worldwide research services, consisting of 3 laboratories: 1 Laboratory of Coordinate Meterology LMW,2 Laboratory for Technoclimatic Research and Working Machines LBTiMR,3 Laboratory of Machines and Energy Devices LMiUE.In the framework of this investment, specialised laboratory equipment and specialised research equipment will be purchased, detailed in section. C.2.3 of the application for funding.Thanks to the purchase of research equipment, it will be possible to provide research services at the highest, world level, concerning, among others, the assessment of the quality of production, the necessary increase in the accuracy of measurements, the development of calibration testing procedures together with their implementation, technological studies of machines, equipment and materials, environmental impact studies on health status, physical and endurance tests of materials and fuels used in energy. Research services will be carried out in the field of highly advanced materials and technologies for industry. The laboratory will be used for economic and non-economic activities, with:1. Breakdown of the duration of use for the verification of the monitoring and withdrawal mechanism: part of the gosp.: 40, part no.: 60,2. Breakdown of the access criterion and the number of points of the cost criterion: part of the gosp.: 35,15, part no.: 64,85.The implementation of the project will contribute to the demonstration of output indicators: Number of scientific units involved in investment in the activities of BR, Number of research laboratories supported. (English)
7 July 2021
0 references
Identifiers
RPMP.01.01.00-12-0077/19
0 references