Construction and refurbishment work and change of use of the water tower building to a viewpoint together with technical and communication infrastructure to be carried out as part of the service building (Q2711414): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed claim: EU contribution (P835): 87,334.71 euro) |
||
Property / EU contribution: 87,334.71 Euro / rank | Property / EU contribution: 87,334.71 Euro / rank | ||
Preferred rank |
Revision as of 22:26, 21 September 2021
Project Q2711414 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction and refurbishment work and change of use of the water tower building to a viewpoint together with technical and communication infrastructure to be carried out as part of the service building |
Project Q2711414 in Poland |
Statements
392,868.68 zloty
0 references
598,885.21 zloty
0 references
65.6 percent
0 references
2 October 2020
0 references
31 July 2021
0 references
GMINA NURZEC-STACJA
0 references
Wnioskodawcą projektu jest gmina Nurzec-Stacja. W ramach projektu zaplanowano prace remontowo-budowlane ze zmianą sposobu użytkowania budynku wieży ciśnień na punkt widokowy wraz z infrastrukturą techniczną. Punk widokowy urządzony będzie w zabytkowym budynku wieży ciśnień. Budynek będzie obsługiwany przez pracownika Urzędu Gminy Nurzec Stacja. Na parterze stworzonego na wieży ciśnień punktu widokowego, zostanie wyznaczona przestrzeń wystawowa, która jednocześnie będzie pełniła funkcję informacyjno-promocyjną Gminy. Dzięki niej osoby odwiedzający to miejsce będą mogły poznać historię tego obiektu, jak i całego zespołu dworca kolejowego w miejscowości Nurzec-Stacja, a także poznać losy całej Gminy oraz twórczość lokalnych artystów, dzieci ze szkół itp. Technologia wykonania prac remontowych została uzgodniona z konserwatorem zabytków i opisana w dokumentacji technicznej (załącznik 5 do projektu). Oferta punktu widokowego będzie skierowana do szerokiego grona zainteresowanych, bez względu na wiek czy niepełnosprawność (przewidziano rozwiązania umożliwiające korzystanie z wyremontowanego obiektu przez osoby z niepełnosprawnością, osoby z małymi dziećmi oraz osoby starsze). Docelowo oferta przedmiotowego projektu będzie kierowana do wszystkich mieszkańców gminy Nurzec-Stacja (osoby z obszarów wiejskich), w tym w szczególności do dzieci w wieku przedszkolnym i szkolnym, rolników, osób młodych, osób powyżej 50 r.ż., osób niepełnosprawnych i niesamodzielnych (grupy defaworyzowane). Całkowita wartość projektu to ponad 588 tys. zł., z czego 65,6 % jest finansowane ze środków RPOWP. Harmonogram projektu: III kw. 2020 - IV kw. 2020 r. Projekt został opracowany przy wykorzystaniu doradztwa świadczonego przez biuro LGD Tygiel Doliny Bugu na 5 dni roboczych przed upływem terminu składania wniosków. (Polish)
0 references
The applicant for the project is the municipality of Nurzec-Station. As part of the project, renovation and construction works were planned with the change of use of the water tower building to a viewpoint together with technical infrastructure. The observation punk will be decorated in the historic building of the water tower. The building will be operated by an employee of Nurzec Station Municipal Office. On the ground floor of the viewpoint water tower, an exhibition space will be designated, which will at the same time serve as an informative and promotional function of the Municipality. Thanks to it, visitors to this place will be able to learn about the history of this facility, as well as the entire train station in Nurzec-Station, as well as the fate of the entire Municipality, as well as the works of local artists, children from schools, etc. The technology of repair works was agreed with the monuments conservator and described in the technical documentation (Annex 5 to the project). The lookout offer will be addressed to a wide range of interested parties, regardless of age or disability (a solution is provided for the use of the renovated facility by persons with disabilities, people with young children and the elderly). Ultimately, the offer of this project will be addressed to all residents of the municipality of Nurzec-Station (persons from rural areas), including in particular children of pre-school and school age, farmers, young people, people over 50 years old, people with disabilities and dependents (disadvantaged groups). The total value of the project is over PLN 588 000, of which 65.6 % is financed by the ROPWP. Timetable for the project: Q3 2020 – Q4 2020 The project was developed using advice provided by the LAG’s Bureau of the Bug Valley Tilt at 5 working days before the deadline for submitting applications. (English)
8 July 2021
0 references
Identifiers
RPPD.08.06.00-20-0436/20
0 references