Extension and modernisation of water and sewerage infrastructure in the municipality of Wisznice (Q2706232): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Changed claim: EU contribution (P835): 505,962.11 euro)
Property / EU contribution: 505,962.11 Euro / rankProperty / EU contribution: 505,962.11 Euro / rank
Normal rank
Preferred rank

Revision as of 20:47, 21 September 2021

Project Q2706232 in Poland
Language Label Description Also known as
English
Extension and modernisation of water and sewerage infrastructure in the municipality of Wisznice
Project Q2706232 in Poland

    Statements

    0 references
    0 references
    2,276,032.88 zloty
    0 references
    505,962.11 Euro
    0.2223 Euro
    0 references
    2,677,685.75 zloty
    0 references
    595,249.54 Euro
    0.2223 Euro
    0 references
    85.0 percent
    0 references
    16 September 2019
    0 references
    30 November 2021
    0 references
    GMINNY ZAKŁAD KOMUNALNY W WISZNICACH SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references
    0 references

    51°47'13.6"N, 23°12'34.9"E
    0 references
    Potrzeba realizacji projektu wynika z potrzeb interesariuszy: mieszkańców gm. Wisznice, operatora infrastruktury oraz władz lokalnych. Grupę docelową stanowią w/w interesariusze główni oraz przedmiotowi: środowisko naturalne i jego zasoby oraz potencjalni inwestorzy i turyści. Celem projektu jest podniesienie poziomu oraz jakości usług komunalnych w zakresie dostaw wody pitnej oraz oczyszczania ścieków w gminie Wisznice. Rezultaty: a)przewidywana liczba osób korzystających z ulepszonego oczyszczania ścieków: 24 RLM b)liczba dodatkowych osób korzystających z ulepszonego oczyszczania ścieków: 24 RLM c)przewidywana liczba osób korzystających z ulepszonego zaopatrzenia w wodę: 2400 os. d)liczba dodatkowych osób korzystających z ulepszonego zaopatrzenia w wodę: 7 os. e) Wydajność dobowa wybudowanych ujęć wody -946 m3/d Zadania: 1)Opracowanie studium wykonalności 2)Opracowanie dokumentacji technicznej 3)Budowa sieci kanaliz. o dł. 1,52km (kw. dł. 856m, niekw. dł. 665m) 4)Przyłącza kanalizacyjne (17 szt. o dł. 0,176km w kw i 0,134km w niekw.) 5)Remont urządzeń istniejącej sieci kanalizacyjnej w m. Dubica (remont 30 lokalnych przepompowni ścieków) 6)Modernizacja oczyszczalni ścieków w Wisznicach (wymiana dmuchaw, montaż instalacji fotowoltaicznej) 7)Rozbudowa sieci wodociągowej o łącznej dł. 1,408 km 8)Przyłącza wodociągowe (18 szt. o dł. 0,679 km w cz. kw i 0,044km w cz. niekw) 9)Remont urządzeń istniejącej sieci wodociągowej (wymiana 29 zasuw) 10)Przebudowa ujęcia wody w Wisznicach (remont istniejących zbiorników i budowa nowego zbiornika wyrównawczego o poj. 250 m3, montaż filtrów, remont studni i zbiornika popłuczyn, montaż instalacji fotowoltaicznej, budowa 2 stacji podnoszenia ciśnienia, agregat prądotwórczy) 11)Nadzór inwestorski 12)Zarządzanie projektem 13)Promocja projektu -tablice informacyjne (4 szt.) Roboty w zakresie infrastruktury wodociągowej prowadzone będą wyłącznie na terenach, na których zapewnione jest prawidłowe zagospodarowanie ścieków (Polish)
    0 references
    The need for the project results from the needs of stakeholders: residents of Wisznice, infrastructure operator and local authorities. The target group shall be the main stakeholders and the subject of: the environment and its resources and potential investors and tourists. The aim of the project is to improve the level and quality of municipal services in the field of drinking water supply and waste water treatment in the municipality of Wisznice. Results: (a)expected number of persons benefiting from improved waste water treatment: 24 p.e. (b)Number of additional persons benefiting from improved waste water treatment: 24 p.e. (c)expected number of people benefiting from improved water supply: 2400 persons (d)Number of additional persons benefiting from improved water supply: 7 pers. (e) Daily performance of built water intakes -946 m³/d Tasks: 1)Elaboration of feasibility study 2)Elaboration of technical documentation 3)Construction of sewerage network 1,52 km (square length) 856 m, some length. 665 m) 4)Sewerage connectors (17 pcs. 0.176 km in square and 0.134 km in some) 5)Renovation of equipment of the existing sewage network in Dubica (renovation of 30 local sewage pumping stations) 6)Modernisation of the sewage treatment plant in Wisznice (exchange of blowers, installation of photovoltaic installation) 7)Expansion of the water supply network with a total length. 1,408 km 8)Water connections (18 pcs. 0.679 km in quarter and 0,044 km in some parts) 9)Renovation of equipment of the existing water supply network (replacement 29 gates)10)Reconstruction of the water supply in Wisznice (renovation of existing tanks and construction of a new balancing tank with capacity. 250 m³, assembling of filters, renovation of wells and washing tanks, installation of photovoltaic installation, construction of 2 pressure stations, generator) 11)Investor supervision 12)Project management 13)Promotion of the project – information boards (4 pieces) Works in the field of water supply infrastructure will be carried out only in areas where proper wastewater management is ensured (English)
    7 July 2021
    0 references

    Identifiers

    RPLU.06.04.00-06-0043/18
    0 references