Q3099321 (Q3099321): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en) |
(Created claim: summary (P836): The general objective of the project is to increase the capacity to manage the health crisis through investments necessary to strengthen the capacity to react to the public health crisis caused by the spread of the SARS-CoV-2 virus in Petrosani Emergency Hospital, within 11 months through the purchase of devices, medical devices, protective equipment and other appropriate facilities in order to respond in a timely and effective manner to the cri...) |
||||||||||||||
Property / summary | |||||||||||||||
The general objective of the project is to increase the capacity to manage the health crisis through investments necessary to strengthen the capacity to react to the public health crisis caused by the spread of the SARS-CoV-2 virus in Petrosani Emergency Hospital, within 11 months through the purchase of devices, medical devices, protective equipment and other appropriate facilities in order to respond in a timely and effective manner to the crisis caused by providing adequate medical services. The overall objective is in line with Specific Objective 9.1 Increasing the capacity to manage the COVID-19 health crisis aims to promote the necessary investments to strengthen the response capacity to the public health crisis caused by the spread of the SARS-CoV-2 virus by directly contributing to the development of the health infrastructure, by investing in equipment and specific equipment/device thus contributing to the development of operationality at national, regional and local level, reducing inequalities in public health and improving access to quality medical services. The project aims to modernise and technologicalise the Petrosani Emergency Hospital, the poor infrastructure that continues to use physically and morally worn equipment, through the acquisition of new and efficient equipment, as well as protective equipment that brings a qualitative increase in the services offered, as well as a quantitative increase in the number of beneficiaries of medical services, improving the state of public health at Hunedoara county level. One of the major problems faced by the health sector, generating social disparities and the inequity of access to health services is represented by insufficiently developed and worn out health infrastructure from a physical and moral point of view. Many of the hospitals in Romania operate in buildings built more than 50 years ago, composed of many pavilions, which are sometimes located in the same premises, but are often located at a long distance. This characteristic of hospital infrastructure causes difficulties in treating patients with associated pathologies, especially in the context of the pandemic, generating high costs for patient transport, difficult access to explorations taking place in different pavilions (which generates prolongation of hospitalisations) and a high need for medical staff to provide specific care. Moreover, these deficiencies are added to the lack of specific equipment and protective equipment so vital to carry out the medical act and protect the lives of all people involved in the fight COVID 19. Directly and indirectly, this situation leads to a very high consumption of resources by the hospital, negatively influencing the funds available for primary or outpatient care. Outdated medical equipment generates additional costs (English) | |||||||||||||||
Property / summary: The general objective of the project is to increase the capacity to manage the health crisis through investments necessary to strengthen the capacity to react to the public health crisis caused by the spread of the SARS-CoV-2 virus in Petrosani Emergency Hospital, within 11 months through the purchase of devices, medical devices, protective equipment and other appropriate facilities in order to respond in a timely and effective manner to the crisis caused by providing adequate medical services. The overall objective is in line with Specific Objective 9.1 Increasing the capacity to manage the COVID-19 health crisis aims to promote the necessary investments to strengthen the response capacity to the public health crisis caused by the spread of the SARS-CoV-2 virus by directly contributing to the development of the health infrastructure, by investing in equipment and specific equipment/device thus contributing to the development of operationality at national, regional and local level, reducing inequalities in public health and improving access to quality medical services. The project aims to modernise and technologicalise the Petrosani Emergency Hospital, the poor infrastructure that continues to use physically and morally worn equipment, through the acquisition of new and efficient equipment, as well as protective equipment that brings a qualitative increase in the services offered, as well as a quantitative increase in the number of beneficiaries of medical services, improving the state of public health at Hunedoara county level. One of the major problems faced by the health sector, generating social disparities and the inequity of access to health services is represented by insufficiently developed and worn out health infrastructure from a physical and moral point of view. Many of the hospitals in Romania operate in buildings built more than 50 years ago, composed of many pavilions, which are sometimes located in the same premises, but are often located at a long distance. This characteristic of hospital infrastructure causes difficulties in treating patients with associated pathologies, especially in the context of the pandemic, generating high costs for patient transport, difficult access to explorations taking place in different pavilions (which generates prolongation of hospitalisations) and a high need for medical staff to provide specific care. Moreover, these deficiencies are added to the lack of specific equipment and protective equipment so vital to carry out the medical act and protect the lives of all people involved in the fight COVID 19. Directly and indirectly, this situation leads to a very high consumption of resources by the hospital, negatively influencing the funds available for primary or outpatient care. Outdated medical equipment generates additional costs (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The general objective of the project is to increase the capacity to manage the health crisis through investments necessary to strengthen the capacity to react to the public health crisis caused by the spread of the SARS-CoV-2 virus in Petrosani Emergency Hospital, within 11 months through the purchase of devices, medical devices, protective equipment and other appropriate facilities in order to respond in a timely and effective manner to the crisis caused by providing adequate medical services. The overall objective is in line with Specific Objective 9.1 Increasing the capacity to manage the COVID-19 health crisis aims to promote the necessary investments to strengthen the response capacity to the public health crisis caused by the spread of the SARS-CoV-2 virus by directly contributing to the development of the health infrastructure, by investing in equipment and specific equipment/device thus contributing to the development of operationality at national, regional and local level, reducing inequalities in public health and improving access to quality medical services. The project aims to modernise and technologicalise the Petrosani Emergency Hospital, the poor infrastructure that continues to use physically and morally worn equipment, through the acquisition of new and efficient equipment, as well as protective equipment that brings a qualitative increase in the services offered, as well as a quantitative increase in the number of beneficiaries of medical services, improving the state of public health at Hunedoara county level. One of the major problems faced by the health sector, generating social disparities and the inequity of access to health services is represented by insufficiently developed and worn out health infrastructure from a physical and moral point of view. Many of the hospitals in Romania operate in buildings built more than 50 years ago, composed of many pavilions, which are sometimes located in the same premises, but are often located at a long distance. This characteristic of hospital infrastructure causes difficulties in treating patients with associated pathologies, especially in the context of the pandemic, generating high costs for patient transport, difficult access to explorations taking place in different pavilions (which generates prolongation of hospitalisations) and a high need for medical staff to provide specific care. Moreover, these deficiencies are added to the lack of specific equipment and protective equipment so vital to carry out the medical act and protect the lives of all people involved in the fight COVID 19. Directly and indirectly, this situation leads to a very high consumption of resources by the hospital, negatively influencing the funds available for primary or outpatient care. Outdated medical equipment generates additional costs (English) / qualifier | |||||||||||||||
point in time: 16 September 2021
|
Revision as of 10:55, 16 September 2021
Project Q3099321 in Romania
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q3099321 in Romania |
Statements
33,137,530.59 Romanian Leu
0 references
6,627,506.118000001 Euro
0.2 Euro
13 September 2021
0 references
33,137,530.59 Romanian Leu
0 references
6,627,506.118000001 Euro
0.2 Euro
13 September 2021
0 references
1.0 percent
0 references
23 June 2020
0 references
30 April 2021
0 references
SPITALUL DE URGENTA PETROSANI
0 references
Obiectivul general al proiectului este cresterea capacitatii de gestionare a crizei sanitare prin investitii necesare pentru consolidarea capacitatii de reactie la criza de sanatate publica cauzata de raspandirea virusului SARS-CoV-2 in Spitalul de Urgenta PETROSANI, intr-un interval de 11 luni prin achizitia de aparatura, dispozitive medicale, echipamente de protectie si alte dotari corespunzatoare cu scopul de a raspunde in timp util si eficient la criza provocata prin oferirea de servicii medicale adecvate. Obiectivul general este in concordanta cu Obiectivul Specific 9.1 Cresterea capacitatii de gestionare a crizei sanitare COVID-19 vizeaza promovarea investitiilor necesare pentru consolidarea capacitatii de reactie la criza de sanatate publica cauzata de raspândirea virusului SARS-CoV-2 contribuind in mod direct la dezvoltarea infrastructurii sanitare, prin investiti in dotari si echipamente/aparatura specifica contribuind astfel la dezvoltarea operationalitatii la nivel national, regional si local, reducand inegalitatile in ceea ce priveste starea de sanatate publica si imbunatatind accesul la serviciile medicale de calitate. Prin proiect se urmareste modernizarea si tehnologizarea Spitalului de Urgenta PETROSANI, a infrastructurii deficitare care utilizeaza in continuare aparatura uzata fizic si moral, prin achizitia de echipamente noi si eficiente, precum si echipamente de protectie ce aduc o crestere calitativa a serviciilor oferite, cat si o crestere cantitativa a numarului de persoane beneficiari ce servicii medicale, imbunantatind starea de sanatate publica la nivel de judet Hunedoara. Una din marile probleme cu care se confrunta sectorul de sanatate, generând disparitati sociale si inechitatea accesului la servicii de sanatate este reprezentata de catre infrastructura sanitara insuficient dezvoltata si uzata din punct de vedere fizic si moral. Multe dintre spitalele din România functioneaza în cladiri construite cu mai mult de 50 de ani în urma, compuse din multe pavilioane, care uneori se afla în aceeasi incinta, dar deseori sunt situate la mare distanta. Aceasta caracteristica a infrastructurii spitalicesti genereaza dificultati in tratarea pacientilor cu patologii asociate, mai ales in contextul pandemiei, generand costuri ridicate privind transportul pacientilor, accesul dificil la explorari care au loc în pavilioane diferite (ceea ce genereaza prelungirea spitalizarilor) si un necesar ridicat de personal medical care sa acorde ingrijiri specifice. Mai mult, acestior deficiente li se adauga lipsa echipamentelor specifice si a echipamentelor de protectie atat de vitale pentru a desfasura actul medical sia proteja viata tuturor persoanelor implecate in lupta COVID 19. In mod direct si indirect, aceasta situatie duce la un consum foarte ridicat de resurse de catre spital, influentând în mod negativ fondurile disponibile pentru asistenta medicala primara sau ambulatorie. Echipamentele medicale învechite genereaza costuri suplimenta (Romanian)
0 references
The general objective of the project is to increase the capacity to manage the health crisis through investments necessary to strengthen the capacity to react to the public health crisis caused by the spread of the SARS-CoV-2 virus in Petrosani Emergency Hospital, within 11 months through the purchase of devices, medical devices, protective equipment and other appropriate facilities in order to respond in a timely and effective manner to the crisis caused by providing adequate medical services. The overall objective is in line with Specific Objective 9.1 Increasing the capacity to manage the COVID-19 health crisis aims to promote the necessary investments to strengthen the response capacity to the public health crisis caused by the spread of the SARS-CoV-2 virus by directly contributing to the development of the health infrastructure, by investing in equipment and specific equipment/device thus contributing to the development of operationality at national, regional and local level, reducing inequalities in public health and improving access to quality medical services. The project aims to modernise and technologicalise the Petrosani Emergency Hospital, the poor infrastructure that continues to use physically and morally worn equipment, through the acquisition of new and efficient equipment, as well as protective equipment that brings a qualitative increase in the services offered, as well as a quantitative increase in the number of beneficiaries of medical services, improving the state of public health at Hunedoara county level. One of the major problems faced by the health sector, generating social disparities and the inequity of access to health services is represented by insufficiently developed and worn out health infrastructure from a physical and moral point of view. Many of the hospitals in Romania operate in buildings built more than 50 years ago, composed of many pavilions, which are sometimes located in the same premises, but are often located at a long distance. This characteristic of hospital infrastructure causes difficulties in treating patients with associated pathologies, especially in the context of the pandemic, generating high costs for patient transport, difficult access to explorations taking place in different pavilions (which generates prolongation of hospitalisations) and a high need for medical staff to provide specific care. Moreover, these deficiencies are added to the lack of specific equipment and protective equipment so vital to carry out the medical act and protect the lives of all people involved in the fight COVID 19. Directly and indirectly, this situation leads to a very high consumption of resources by the hospital, negatively influencing the funds available for primary or outpatient care. Outdated medical equipment generates additional costs (English)
16 September 2021
0 references
Municipiul Petroşani, Romania
0 references
Identifiers
139962
0 references