Q3110287 (Q3110287): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Created claim: summary (P836): The project “Reducing the energy intensity of the administrative building of the Office of Labour, Skutecký 39, Banská Bystrica” aims to reduce the energy intensity of the office building on Skutecký street No.39/3500 in Banská Bystrica.The project presented will be implemented through one main activity “Reducing the energy intensity of the building ÚPSVR in Banská Bystrica”, which includes improving the thermal insulation properties of the buil...)
Property / summary
 
The project “Reducing the energy intensity of the administrative building of the Office of Labour, Skutecký 39, Banská Bystrica” aims to reduce the energy intensity of the office building on Skutecký street No.39/3500 in Banská Bystrica.The project presented will be implemented through one main activity “Reducing the energy intensity of the building ÚPSVR in Banská Bystrica”, which includes improving the thermal insulation properties of the building, reconstruction and innovation of the ventilation system, lighting, heat sources and heating system. The target value of the indicator of the project “Reduction of energy needs in public buildings” will be 370219,1 kWh/year. Energy needs for heating will be reduced by 68 %. The primary energy consumption will be 300128,6 kWh/year after project implementation. The project will reduce energy needs to the level of an ultra-low-energy building. (English)
Property / summary: The project “Reducing the energy intensity of the administrative building of the Office of Labour, Skutecký 39, Banská Bystrica” aims to reduce the energy intensity of the office building on Skutecký street No.39/3500 in Banská Bystrica.The project presented will be implemented through one main activity “Reducing the energy intensity of the building ÚPSVR in Banská Bystrica”, which includes improving the thermal insulation properties of the building, reconstruction and innovation of the ventilation system, lighting, heat sources and heating system. The target value of the indicator of the project “Reduction of energy needs in public buildings” will be 370219,1 kWh/year. Energy needs for heating will be reduced by 68 %. The primary energy consumption will be 300128,6 kWh/year after project implementation. The project will reduce energy needs to the level of an ultra-low-energy building. (English) / rank
 
Normal rank
Property / summary: The project “Reducing the energy intensity of the administrative building of the Office of Labour, Skutecký 39, Banská Bystrica” aims to reduce the energy intensity of the office building on Skutecký street No.39/3500 in Banská Bystrica.The project presented will be implemented through one main activity “Reducing the energy intensity of the building ÚPSVR in Banská Bystrica”, which includes improving the thermal insulation properties of the building, reconstruction and innovation of the ventilation system, lighting, heat sources and heating system. The target value of the indicator of the project “Reduction of energy needs in public buildings” will be 370219,1 kWh/year. Energy needs for heating will be reduced by 68 %. The primary energy consumption will be 300128,6 kWh/year after project implementation. The project will reduce energy needs to the level of an ultra-low-energy building. (English) / qualifier
 
point in time: 15 September 2021
Timestamp+2021-09-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:41, 15 September 2021

Project Q3110287 in Slovakia
Language Label Description Also known as
English
No label defined
Project Q3110287 in Slovakia

    Statements

    0 references
    968,190.38 Euro
    0 references
    1,139,047.5 Euro
    0 references
    0.85 percent
    0 references
    3 January 2019
    0 references
    6 January 2020
    0 references
    Ústredie práce, sociálnych vecí a rodiny
    0 references

    48°8'54.96"N, 17°6'27.90"E
    0 references
    Projekt „Zníženie energetickej náročnosti administratívneho objektu Úradu práce, Skuteckého 39, Banská Bystrica“ má za cieľ zníženie energetickej náročnosti budovy úradu na Skuteckého ulici č.39/ 3500 v Banskej Bystrici.Predkladaný projekt bude realizovaný prostredníctvom jednej hlavnej aktivity „Zníženie energetickej náročnosti budovy ÚPSVR v Banskej Bystrici“, ktorá zahŕňa zlepšenie tepelnoizolačných vlastností budovy, rekonštrukciu a inováciu vetracieho systému, osvetlenia, zdrojov tepla a vykurovacieho systému.Cieľová hodnota ukazovateľa projektu „Zníženie potreby energie vo verejných budovách“ bude 370219,1 kWh/rok. Potreba energie na vykurovanie sa zníži o 68%. Spotreba primárnej energie bude po realizácii projektu na hodnote 300 128,6 kWh/rok . Projektom sa zníži potreba energie na úroveň ultranízkoenergetickej budovy. (Slovak)
    0 references
    The project “Reducing the energy intensity of the administrative building of the Office of Labour, Skutecký 39, Banská Bystrica” aims to reduce the energy intensity of the office building on Skutecký street No.39/3500 in Banská Bystrica.The project presented will be implemented through one main activity “Reducing the energy intensity of the building ÚPSVR in Banská Bystrica”, which includes improving the thermal insulation properties of the building, reconstruction and innovation of the ventilation system, lighting, heat sources and heating system. The target value of the indicator of the project “Reduction of energy needs in public buildings” will be 370219,1 kWh/year. Energy needs for heating will be reduced by 68 %. The primary energy consumption will be 300128,6 kWh/year after project implementation. The project will reduce energy needs to the level of an ultra-low-energy building. (English)
    15 September 2021
    0 references

    Identifiers

    310041M945
    0 references