Reduction of energy costs ZU M. Vileca, Bardejov (Q3103197): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: translated_label)
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
Property / contained in NUTS
 
Property / contained in NUTS: Prešov Region / rank
 
Normal rank

Revision as of 16:12, 15 September 2021

Project Q3103197 in Slovakia
Language Label Description Also known as
English
Reduction of energy costs ZU M. Vileca, Bardejov
Project Q3103197 in Slovakia

    Statements

    0 references
    963,765.39 Euro
    0 references
    1,133,841.63 Euro
    0 references
    0.85 percent
    0 references
    1 June 2017
    0 references
    1 September 2020
    0 references
    Mesto Bardejov
    0 references

    49°17'31.49"N, 21°16'34.61"E
    0 references
    Jedná sa o existujúcu budovu ZUŠ na Hurbanovej ulici v Bardejove.            Objekt ZUŠ pozostáva z dvoch častí – uličná čas a dvorné krídlo v pôdorysnom tvare písmena „T“. Uličná čas je čiastočne podpivničená, trojpodlažná budova s podkrovím a dvorné krídlo je nepodpivničená dvojpodlažná budova s podkrovím. Obidve časti sú prepojené schodiskovým priestorom.            Strecha je šikmá sedlová s valbami na koncoch. Vo valbach sú osadené presvetžovacie vikiere.            Konštrukčne je objekt murovanou stavbou so železobetónovými stropmi a dreveným krovom.            Účelom projektu je zníži celkové energetické náklady prevádzky ZUŠ výmenou vonkajších okenných a dverných výplní, zateplením celého objektu školy, výmenou existujúcich interiérových svietidiel a časti vykurovacích telies, vyregulovaním ÚVK a výmenou ohrievačov TÚV.            Zateplením objektu a jeho modernizáciou dôjde k technickému zhodnoteniu a skvalitneniu priestorov ZUŠ.            Prevádzka a dispozície objektu ostávajú bez zmeny. (Slovak)
    0 references
    It is an existing building ZU on Hurbanova street in Bardejov.            The building ZU consists of two parts street time and court wing in the floor shape of the letter T. Street time is partly basement, three-storey building with attic and court wing is basement two-storey building with attic. Both parts are interconnected by the staircase.            The roof is ilky saddle with valbs at the ends. In the valbas are fitted with illuminating dormers.            The building is a brick building with elezobetone ceilings and wooden truss.            The purpose of the project is to reduce the total energy costs of operation of the ZU by replacing external window and door fillings, insulation of the entire building of the wheel, replacement of existing interior lighting fixtures and parts of heating elements, regulation of the ÚVK and replacement of heaters.            The insulation of the building and its modernisation will result in technical evaluation and improvement of the premises of the ZU.            The operation and layout of the object remain unchanged. (English)
    15 September 2021
    0 references

    Identifiers

    310041I966
    0 references