Arc SAR remodeling (Q2982589): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string) |
(Removed claim: co-financing rate (P837): 85.0 percent, Removing co-finance rate from projects in portugal) |
||||||
Property / co-financing rate | |||||||
| |||||||
Property / co-financing rate: 85.0 percent / rank | |||||||
Revision as of 15:03, 15 September 2021
Project Q2982589 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Arc SAR remodeling |
Project Q2982589 in Portugal |
Statements
37,964.53 Euro
0 references
1 November 2017
0 references
31 December 2020
0 references
MUNICÍPIO DE VILA FLOR
0 references
Com esta operação pretende-se dotar a ETAR existente de uma obra de entrada que garanta a eficiência dos equipamentos a jusante, de modo a ser assegurado o tratamento satisfatório das águas residuais urbanas da localidade de Arco, pertencente à União das freguesias de Vila Flor e Nabo. (Portuguese)
0 references
With this operation it is intended to equip the existing sewage plant with an entrance work that ensures the efficiency of downstream equipment, in order to ensure the satisfactory treatment of urban waste water of the locality of Arco, belonging to the Union of the parishes of Vila Flor and Nabo. (English)
9 July 2021
0 references
Vila Flor, União das freguesias de Vila Flor e Nabo
0 references
Identifiers
POSEUR-03-2012-FC-000848
0 references