Works at the Water Treatment Station of S João do Peso (Q2982579): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
(‎Removed claim: co-financing rate (P837): 85.0 percent, Removing co-finance rate from projects in portugal)
Property / co-financing rate
85.0 percent
Amount85.0 percent
Unitpercent
 
Property / co-financing rate: 85.0 percent / rank
Normal rank
 

Revision as of 15:03, 15 September 2021

Project Q2982579 in Portugal
Language Label Description Also known as
English
Works at the Water Treatment Station of S João do Peso
Project Q2982579 in Portugal

    Statements

    0 references
    212,997.65 Euro
    0 references
    1 March 2018
    0 references
    29 May 2020
    0 references
    MUNICÍPIO DE VILA DE REI
    0 references
    Q2991038 (Deleted Item)
    0 references
    0 references

    39°42'59.22"N, 8°4'10.70"W
    0 references
    Esta operação surge no sentido de dar resposta à necessidade detetada de reformulação dos equipamentos existentes, consistindo na substituição de duas unidades existentes por apenas uma ETAR, visando reduzir os custos que lhes estão associados, maximizar os recursos disponibilizados e cumprir os parâmetros de descarga, a fim de concorrer para a diminuição da poluição das massas de água. (Portuguese)
    0 references
    This operation is designed to meet the detected need for recasting of existing equipment, consisting of the replacement of two existing plants with only one sewage plant, with a view to reducing the associated costs, maximising the resources available and complying with the discharge parameters in order to contribute to the reduction of pollution of water bodies. (English)
    9 July 2021
    0 references
    Vila de Rei, São João do Peso
    0 references

    Identifiers

    POSEUR-03-2012-FC-000829