Energy efficiency at the General Hospital of the University of Coimbra (Q2981264): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string) |
(Removed claim: co-financing rate (P837): 85.0 percent, Removing co-finance rate from projects in portugal) |
||||||
Property / co-financing rate | |||||||
| |||||||
Property / co-financing rate: 85.0 percent / rank | |||||||
Revision as of 14:38, 15 September 2021
Project Q2981264 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy efficiency at the General Hospital of the University of Coimbra |
Project Q2981264 in Portugal |
Statements
2,211,133.86 Euro
0 references
1 June 2018
0 references
31 March 2022
0 references
CENTRO HOSPITALAR E UNIVERSITÁRIO DE COIMBRA, E.P.E.
0 references
Q2992702 (Deleted Item)
0 references
O Hospital Geral da Universidade de Coimbra propõe-se reconverter os seus sistemas energéticos, com a utilização de LED em toda a iluminação, aquecimento de água quente por painéis solares térmicos, troca de equipamento de produção e distribuição térmica, isolamentos na envolvente opaca, novos envidraçados e produção de eletricidade por painéis fotovoltaicos para autoconsumo. (Portuguese)
0 references
The General Hospital of the University of Coimbra proposes to convert its energy systems, with the use of LED in all lighting, heating of hot water by thermal solar panels, exchange of equipment for production and thermal distribution, insulations in the opaque surroundings, new glazing and production of electricity by photovoltaic panels for self-consumption. (English)
9 July 2021
0 references
Coimbra, União das freguesias de São Martinho do Bispo e Ribeira de Frades
0 references
Identifiers
POSEUR-01-1203-FC-000188
0 references