Energy efficiency at Macedo de Cavaleiros Hospital (Q2981249): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
(‎Removed claim: co-financing rate (P837): 85.0 percent, Removing co-finance rate from projects in portugal)
Property / co-financing rate
85.0 percent
Amount85.0 percent
Unitpercent
 
Property / co-financing rate: 85.0 percent / rank
Normal rank
 

Revision as of 14:38, 15 September 2021

Project Q2981249 in Portugal
Language Label Description Also known as
English
Energy efficiency at Macedo de Cavaleiros Hospital
Project Q2981249 in Portugal

    Statements

    0 references
    2,698,259.26 Euro
    0 references
    1 June 2018
    0 references
    30 March 2022
    0 references
    UNIDADE LOCAL DE SAÚDE DO NORDESTE, E.P.E.
    0 references
    0 references
    0 references

    41°32'27.38"N, 6°57'54.72"W
    0 references
    No Hospital de Macedo vão ser reconvertidos os seus sistemas energéticos.Esta operação vai ser feita através da utilização de LED em toda a iluminação, aquecimento de água quente por painéis solares térmicos, sistema de gestão técnica centralizado, isolamento de fachadas, novos envidraçados, troca de equipamento de produção e distribuição térmica e produção de eletricidade por painéis fotovoltaicos, para autoconsumo. (Portuguese)
    0 references
    At the Hospital de Macedo, its energy systems will be converted.This operation will be done through the use of LED in all lighting, heating of hot water by thermal solar panels, centralised technical management system, insulation of fronts, new glazing, exchange of equipment for thermal production and distribution and production of electricity by photovoltaic panels, for self-consumption. (English)
    9 July 2021
    0 references
    Macedo de Cavaleiros, Macedo de Cavaleiros
    0 references

    Identifiers

    POSEUR-01-1203-FC-000171
    0 references