Q3101725 (Q3101725): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: Setting new description)
(‎Created claim: summary (P836): The aim of the project is to achieve a comprehensive solution to the energy performance of an administrative building ensuring the energy efficiency of the building while using it and at the same time reducing the energy intensity (actual energy consumption) as well as providing barrier-free access to the building. This objective will be achieved by improving the quality of packaging contrusions and internal thermal comfort, efficient air exchan...)
Property / summary
 
The aim of the project is to achieve a comprehensive solution to the energy performance of an administrative building ensuring the energy efficiency of the building while using it and at the same time reducing the energy intensity (actual energy consumption) as well as providing barrier-free access to the building. This objective will be achieved by improving the quality of packaging contrusions and internal thermal comfort, efficient air exchange, replacement of heating system, hot water and lighting. (English)
Property / summary: The aim of the project is to achieve a comprehensive solution to the energy performance of an administrative building ensuring the energy efficiency of the building while using it and at the same time reducing the energy intensity (actual energy consumption) as well as providing barrier-free access to the building. This objective will be achieved by improving the quality of packaging contrusions and internal thermal comfort, efficient air exchange, replacement of heating system, hot water and lighting. (English) / rank
 
Normal rank
Property / summary: The aim of the project is to achieve a comprehensive solution to the energy performance of an administrative building ensuring the energy efficiency of the building while using it and at the same time reducing the energy intensity (actual energy consumption) as well as providing barrier-free access to the building. This objective will be achieved by improving the quality of packaging contrusions and internal thermal comfort, efficient air exchange, replacement of heating system, hot water and lighting. (English) / qualifier
 
point in time: 15 September 2021
Timestamp+2021-09-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 13:22, 15 September 2021

Project Q3101725 in Slovakia
Language Label Description Also known as
English
No label defined
Project Q3101725 in Slovakia

    Statements

    0 references
    502,361.0 Euro
    0 references
    591,012.94 Euro
    0 references
    0.85 percent
    0 references
    1 February 2017
    0 references
    1 February 2022
    0 references
    Ústav na výkon trestu odňatia slobody
    0 references

    49°4'35.62"N, 19°18'58.14"E
    0 references
    Ciežom projektu je dosiahnu dosiahnu komplexné riešenie energetickej hospodárnosti administratívnej budovy zabezpečujúce energetickú efektívnos budovy pri jej užívaní a zároveň zníženie energetickej náročnosti (skutočná spotreba energie) a zároveň vyrieši aj bezbariérový prístup do objektu. Uvedený ciež bude dosiahnutý formou zlepšenia kvality obalových konštrukcií a vnútornej tepelnej pohody, efektívnej výmeny vzduchu, výmeny sytému vykurovania, prípravy teplej vody a osvetlenia. (Slovak)
    0 references
    The aim of the project is to achieve a comprehensive solution to the energy performance of an administrative building ensuring the energy efficiency of the building while using it and at the same time reducing the energy intensity (actual energy consumption) as well as providing barrier-free access to the building. This objective will be achieved by improving the quality of packaging contrusions and internal thermal comfort, efficient air exchange, replacement of heating system, hot water and lighting. (English)
    15 September 2021
    0 references

    Identifiers

    310041L733
    0 references