Reconstruction and expansion of existing capacities of the Maternity School Mo iarska 1, Ke marok (Q3101103): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The aim of the project is to support the education of children in the kindergarten, in particular in the area of increasing the schooling of the children of the maternal school by increasing the capacity of the maternal school. The basic philosophy of the project is based on the need to increase the existing capacity of the maternity wheel by ten new places from the original 95 to 105 places on the basis of an analysis of the need to increase th...)
(‎Changed label, description and/or aliases in en: translated_label)
label / enlabel / en
 
Reconstruction and expansion of existing capacities of the Maternity School Mo iarska 1, Ke marok

Revision as of 13:14, 15 September 2021

Project Q3101103 in Slovakia
Language Label Description Also known as
English
Reconstruction and expansion of existing capacities of the Maternity School Mo iarska 1, Ke marok
Project Q3101103 in Slovakia

    Statements

    0 references
    216,221.39 Euro
    0 references
    254,378.1 Euro
    0 references
    0.85 percent
    0 references
    1 February 2017
    0 references
    1 March 2021
    0 references
    Mesto Kežmarok
    0 references

    49°8'32.89"N, 20°25'54.73"E
    0 references
    Ciežom projektu je podpora vzdelávania detí v materských školách a to najmä v oblasti zvýšenia zaškolenosti detí materskej školy prostredníctvom zvýšenia kapacít materskej školy. Základnou filozofiou projektu je v nadväznosti na nevyhnutnos zvýšenia existujúcej kapacity materskej školy o desa nových miest  z pôvodných 95  na 105 miest na základe analýzy potreby navýšenia kapacity materskej školy a vykona také stavebné úpravy, ktoré jednak umožnia priame zvýšenie kapacity prístavbou, ale zároveň  v ostatných existujúcich priestoroch zvýšia kapacitu sociálnych zariadení a materiálno - technického vybavenia, úpravou areálu a tiež zároveň umožnia zníži celkovú energetickú náročnos objektu ako celku.Naplnenie cieža sa dosiahne realizáciou následovných aktivít zameraných na zvýšenie a rozšírenie kvality vzdelávania materskej školy.Zámerom projektu je rozšírenie kapacít materskej školy Možiarska prostredníctvom týchto aktivít:Aktivita č. 1: Rozširovanie kapacít existujúceho objektu materskej školy prístavbou, rekonštrukciou a zmenou dispozície objektuAktivita č.2: Stavebno-technické úpravy areálu materskej školy vrátane detských ihrísk, športových zariadení pre deti a  záhrad vrátane prvkov inkluzívneho vzdelávania-Aktivita č. 3:Obstaranie materiálno - technického vybavenia objektu materskej školyAktivita č. 4: Zvyšovanie energetickej hospodárnosti objektu materskej školyRealizáciou vyššie uvedených aktivít projektu sa dosiahnu stanovené meratežné ukazovatele, a to:Kapacita podporenej školskej infraštruktúry materských škôl v počte 105 detí,Počet podporených materských škôl v počte 1Počet nových verejných budov v počte  1Počet renovovaných verejných budov v počte    1Podlahová plocha renovovaných verejných budov 1260 m2      Postavené alebo zrenovované verejné alebo komerčné budovy v mestských oblastiach 1260 m2      Počet podporených areálov MŠ v počte 1Zníženie ročnej spotreby primárnej energie vo verejných budovách o 157 335,75 kWh/rokOdhadované ročné zníženie emisií skleníkových plynov 14,52 t ekviv. CO2           Počet podporených MŠ materiálno-technickým vybavením v počte 1Suma pre výpočet na základe benchmarku:Aktuálne kapacita – zlepšenie existujúcej kapacity MŠ 95 x 2 500 € = 237 500 €Vytvorenie nových kapacít MŠ 10 x 6 700 € = 67 000 €Spolu rozpočet na základe benchmarku 237 500 € + 67 000 € = 304 500 € Predpokladaný termín realizácie týchto aktivít je 16 mesiacov. Miesto realizácie projektu je materská škola Možiarska 1, 060 01 Kežmarok. (Slovak)
    0 references
    The aim of the project is to support the education of children in the kindergarten, in particular in the area of increasing the schooling of the children of the maternal school by increasing the capacity of the maternal school. The basic philosophy of the project is based on the need to increase the existing capacity of the maternity wheel by ten new places from the original 95 to 105 places on the basis of an analysis of the need to increase the capacity of the maternity wheel and to carry out such building modifications, which both monetise the direct increase in capacity by extension, but at the same time in other existing premises increase the capacity of social facilities and material – technical equipment, by modifying the area and at the same time will reduce the overall energy intensity of the building as a whole. The aim is achieved through the implementation of the following activities aimed at increasing and expanding the quality of education of the parent wheel.The aim of the project is to expand the capacity of the Maternity Wheel as a whole. The aim of the project is to expand the capacity of the Maternity Round by 1: aktivít:Aktivita Expansion of the capacities of the existing building of the parent wheel by extension, reconstruction and modification of the layout of the objectActivities No.2: Structural and technical adjustments to the area of the maternity school, including children’s playgrounds, sports facilities for children and gardens, including elements of inclusive education-Activity No. 3:Procurement of material – technical equipment of the object of the Maternity SchoolActivities No. 4: Improvement of the energy performance of the building of the parent wheelImplementation of the above mentioned project activities will achieve the specified measurement indicators, and to:Kapacita of supported school infrastructure of the mother rounds of 105 children,Number of supported maternity rounds in the number of 1Number of new public buildings in the number of 1Number of renovated public buildings in number 1Floor area of refurbished public buildings 1260 m² Built or renovated public or commercial buildings in urban areas 1260 m² Number of supported areas M in number 1Reduction of annual primary energy consumption in public buildings by 157335.75 kWh/year Estimated annual greenhouse emissions, CO2 Number of material and technical equipment supported by 1Amount for calculation based on benchmarku:Aktuálne capacity to improve existing capacity M 95 x EUR 2 500 = EUR 237 500Creation of new capacities M 10 x EUR 6 700 = EUR 67 000Total budget based on benchmark EUR 237 500 + EUR 67 000 = EUR 304 500 The expected date of these activities is 16 months. The place of implementation of the project is Moiarska 1, 060 01 Kemarok. (English)
    15 September 2021
    0 references

    Identifiers

    302021H603
    0 references