Stropkov Materská Round, Matice Slovak 740/7 (Q3100624): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The object of the Maternity School is located in Stropkov, in the cadastral area Stropkov, parcel number 914/1, on the deed of ownership No. 5058. The city of Stropkov is the sole owner. The Maternity Round is a budgetary organisation of the city and has a building and all land in the administration, which is also marked on the LV in question. The total area of the maternity wheel area is about 7000 m². The building for normalised (required) val...)
(‎Changed label, description and/or aliases in en: translated_label)
label / enlabel / en
 
Stropkov Materská Round, Matice Slovak 740/7

Revision as of 13:10, 15 September 2021

Project Q3100624 in Slovakia
Language Label Description Also known as
English
Stropkov Materská Round, Matice Slovak 740/7
Project Q3100624 in Slovakia

    Statements

    0 references
    469,308.26 Euro
    0 references
    552,127.37 Euro
    0 references
    0.85 percent
    0 references
    1 September 2016
    0 references
    1 April 2018
    0 references
    Materská škola, Matice slovenskej 740/7, Stropkov
    0 references

    49°12'9.43"N, 21°39'6.55"E
    0 references
    Objekt materskej školy sa nachádza v Stropkove, v katastrálnom území Stropkov, parcelné číslo 914/1, na liste vlastníctva č. 5058. Jediným vlastníkom je Mesto Stropkov. Materská škola je rozpočtovou organizáciou mesta a má budovu a všetky pozemky v správe, čo je vyznačené aj na predmetnom LV. Celková rozloha areálu materskej školy predstavuje cca 7 000 m2. Budova pre normalizované (požadované) hodnoty nevyhovuje kvôli zastaraným stavebným konštrukciám a vežkému množstvu výplní otvorov v konštrukcii, ktoré výrazne zvyšujú potrebu tepla na vykurovanie. Na základe údajov z hodnotenia súčasného stavu v energetickom audite je vidie, že najviac tepla z celého objektu uniká cez obvodový pl᚝. Ďalšie úniky tepla sú cez výplne otvoroch, strechu a podlahu. Jednotlivé navrhované opatrenia riešia komplexne budovu, tak aby bola dosiahnutá maximálna možná úspora energie. Na základe výsledkov hodnotenia súčasného stavu budovy boli v rámci energetického auditu navrhnuté tieto opatrenia:Stavebné konštrukcie: zatepli obalové konštrukcie v styku s exteriérom a nevykurovaným priestorom a výmenu výplňových konštrukcií.Vykurovanie: hydraulické vyregulovanie vykurovacej sústavy s výmenou vykurovacích telies.Osvetlenie: vymeni aktuálne zastarané osvetlenie za nové svetelné zdroje na báze LED technológie.Energia z obnovitežných zdrojov: osadenie fotovoltických panelov.Okrem opatrení investičného charakteru sú navrhované aj ďalšie dodatočné opatrenia, popísané v energetickom audite, najmä organizačného a osvetového charakteru. (Slovak)
    0 references
    The object of the Maternity School is located in Stropkov, in the cadastral area Stropkov, parcel number 914/1, on the deed of ownership No. 5058. The city of Stropkov is the sole owner. The Maternity Round is a budgetary organisation of the city and has a building and all land in the administration, which is also marked on the LV in question. The total area of the maternity wheel area is about 7000 m². The building for normalised (required) values does not meet due to outdated construction structures and a large number of fillings of holes in the construction, which significantly increase the need for heat for heating. Based on data from the assessment of the current state of the energy audit, it is seen that the most heat from the whole object leaks through the perimeter beach. Other heat leaks are through the filling holes, the roof and the floor. The various measures proposed will address the building in a comprehensive manner so as to achieve the maximum possible energy savings. Based on the results of the evaluation of the current state of the building, the energy audit proposed the following opatrenia:Stavebné constructions: insulated packaging structures in contact with the exterior and unheated space and replacement of filling contrusions.Heating: hydraulic control of the heating system with replacement of heating elements.Lighting: replace current outdated lighting with new LED-based light sources.Energy from renewable sources: installation of photovoltaic panels.In addition to the measures of an investment nature, other additional measures described in the energy audit, especially of the organisational and educational nature, are also proposed. (English)
    15 September 2021
    0 references

    Identifiers

    310041A204
    0 references