|
|
Property / instance of | |
| | |
Property / instance of: Kohesio project / rank | |
| Normal rank
| |
Property / financed by | |
| | |
Property / financed by: European Union / rank | |
| Normal rank
| |
Property / intervention field | |
| | |
Property / intervention field: Energy efficiency renovation of public infrastructure, demonstration projects and supporting measures / rank | |
| Normal rank
| |
Property / country | |
| | |
Property / country: Romania / rank | |
| Normal rank
| |
Property / EU contribution | |
| 5,679,081.04 Romanian Leu | |
Property / EU contribution: 5,679,081.04 Romanian Leu / rank | |
| Normal rank
| |
Property / EU contribution | |
| 1,135,816.208 EuroAmount | 1,135,816.208 Euro |
---|
Unit | Euro |
---|
| |
Property / EU contribution: 1,135,816.208 Euro / rank | |
| Preferred rank
| |
Property / EU contribution: 1,135,816.208 Euro / qualifier | |
| | |
Property / EU contribution: 1,135,816.208 Euro / qualifier | |
| point in time: 15 June 2021Timestamp | +2021-06-15T00:00:00Z |
---|
Timezone | +00:00 |
---|
Calendar | Gregorian |
---|
Precision | 1 day |
---|
Before | 0 |
---|
After | 0 |
---|
| |
Property / budget | |
| 6,681,271.8100000005 Romanian Leu | |
Property / budget: 6,681,271.8100000005 Romanian Leu / rank | |
| Normal rank
| |
Property / budget | |
| 1,336,254.3620000002 EuroAmount | 1,336,254.3620000002 Euro |
---|
Unit | Euro |
---|
| |
Property / budget: 1,336,254.3620000002 Euro / rank | |
| Preferred rank
| |
Property / budget: 1,336,254.3620000002 Euro / qualifier | |
| | |
Property / budget: 1,336,254.3620000002 Euro / qualifier | |
| point in time: 15 June 2021Timestamp | +2021-06-15T00:00:00Z |
---|
Timezone | +00:00 |
---|
Calendar | Gregorian |
---|
Precision | 1 day |
---|
Before | 0 |
---|
After | 0 |
---|
| |
Property / co-financing rate | |
| | |
Property / co-financing rate: 0.85 percent / rank | |
| Normal rank
| |
Property / start time | |
| 18 September 2018Timestamp | +2018-09-18T00:00:00Z |
---|
Timezone | +00:00 |
---|
Calendar | Gregorian |
---|
Precision | 1 day |
---|
Before | 0 |
---|
After | 0 |
---|
| |
Property / start time: 18 September 2018 / rank | |
| Normal rank
| |
Property / end time | |
| 30 September 2022Timestamp | +2022-09-30T00:00:00Z |
---|
Timezone | +00:00 |
---|
Calendar | Gregorian |
---|
Precision | 1 day |
---|
Before | 0 |
---|
After | 0 |
---|
| |
Property / end time: 30 September 2022 / rank | |
| Normal rank
| |
Property / beneficiary name (string) | |
| UAT Oras Novaci
| |
Property / beneficiary name (string): UAT Oras Novaci / rank | |
| Normal rank
| |
Property / location (string) | |
| GJ, Novaci
| |
Property / location (string): GJ, Novaci / rank | |
| Normal rank
| |
Property / summary | |
| Descrierea principalelor lucrari de interventiiArhitecturaREABILITARE TERMICA SI REFACERE INSTALATII INTERIOARE SI FINISAJEInterior:a. Inlocuirea tamplariei interioare existente, realizata in mai multe etape si din materiale diferite, cu o tamplarie unitara, de calitate si cu aspect estetic placutb. Repararea finisajelor afectate de inlocuirea tamplariei exterioare/interioare si a elementelor componente ale sistemului de incalzire (trasee de conducte, corpuri statice) .c. Repararea pardoselilor in zonele de rost si montarea de profile de inchidere rostd. Inlocuirea tamplariei interioare existente, realizata in mai multe etape si din materiale diferite, cu o tamplarie unitara, de calitate bsi cu aspect estetic placutExteriora. Realizarea termosistemului pe fatada imobiluluib. Înlocuirea tâmplariei exterioarea existente cu una cu o clasa de eficienta energeticaRezistenta Intradosul placii de peste subsol, care prezinta zone de exfoliere a betonului de acoperire si armatura astfel expusa este corodata,Instalatii sanitareLa instalatiile de apa rece si apa calda din saloane si din grupurile sanitare se vor inlocui bateriile de la dusuri si chiuvete cu unele moderne care au prevazute perlatoare ce fac ca in jetul de apa sa fie antrenat si aer astfel incat la acelasi efect de spalare consumurile de apa vor fi mult diminuate.Se vor izola conductele de apa rece si apa calda pentru a nu aparea condensul si, respectiv, de a avea pierderi de caldura cat mai mici (Romanian)
| |
Property / summary: Descrierea principalelor lucrari de interventiiArhitecturaREABILITARE TERMICA SI REFACERE INSTALATII INTERIOARE SI FINISAJEInterior:a. Inlocuirea tamplariei interioare existente, realizata in mai multe etape si din materiale diferite, cu o tamplarie unitara, de calitate si cu aspect estetic placutb. Repararea finisajelor afectate de inlocuirea tamplariei exterioare/interioare si a elementelor componente ale sistemului de incalzire (trasee de conducte, corpuri statice) .c. Repararea pardoselilor in zonele de rost si montarea de profile de inchidere rostd. Inlocuirea tamplariei interioare existente, realizata in mai multe etape si din materiale diferite, cu o tamplarie unitara, de calitate bsi cu aspect estetic placutExteriora. Realizarea termosistemului pe fatada imobiluluib. Înlocuirea tâmplariei exterioarea existente cu una cu o clasa de eficienta energeticaRezistenta Intradosul placii de peste subsol, care prezinta zone de exfoliere a betonului de acoperire si armatura astfel expusa este corodata,Instalatii sanitareLa instalatiile de apa rece si apa calda din saloane si din grupurile sanitare se vor inlocui bateriile de la dusuri si chiuvete cu unele moderne care au prevazute perlatoare ce fac ca in jetul de apa sa fie antrenat si aer astfel incat la acelasi efect de spalare consumurile de apa vor fi mult diminuate.Se vor izola conductele de apa rece si apa calda pentru a nu aparea condensul si, respectiv, de a avea pierderi de caldura cat mai mici (Romanian) / rank | |
| Normal rank
| |
Property / summary | |
| Description of the main intervention worksTermic architecture and restoration INTERIOARY INSTALATIES AND FINISAJE Previously:a. Replacement of the existing interior carpentry, made in several stages and of different materials, with a unitary, quality and aesthetic look. Repair of the finishes affected by the replacement of the exterior/indoor carpentry and the components of the heating system (pipe paths, static bodies).c. Repairing floors in the groove areas and mounting roll closing profiles. The replacement of the existing interior carpentry, made in several stages and of different materials, with a unitary, BSI quality carpentry with aesthetically pleasing appearance Exteriora. Realisation of the thermosystem on the facade of the buildingb. The replacement of the existing exterior carpentry with one with an energy efficiency classThe interior of the plate over the basement, which has areas of exfoliation of the concrete coating and reinforcement thus exposed is corroded, sanitary installationsAt cold water installations and hot water from the saloons and toilets will be replaced by batteries from showers and sinks with some modern ones that have provided the same water effect as water washers will be used in the water. (English)
| |
Property / summary: Description of the main intervention worksTermic architecture and restoration INTERIOARY INSTALATIES AND FINISAJE Previously:a. Replacement of the existing interior carpentry, made in several stages and of different materials, with a unitary, quality and aesthetic look. Repair of the finishes affected by the replacement of the exterior/indoor carpentry and the components of the heating system (pipe paths, static bodies).c. Repairing floors in the groove areas and mounting roll closing profiles. The replacement of the existing interior carpentry, made in several stages and of different materials, with a unitary, BSI quality carpentry with aesthetically pleasing appearance Exteriora. Realisation of the thermosystem on the facade of the buildingb. The replacement of the existing exterior carpentry with one with an energy efficiency classThe interior of the plate over the basement, which has areas of exfoliation of the concrete coating and reinforcement thus exposed is corroded, sanitary installationsAt cold water installations and hot water from the saloons and toilets will be replaced by batteries from showers and sinks with some modern ones that have provided the same water effect as water washers will be used in the water. (English) / rank | |
| Normal rank
| |
Property / summary: Description of the main intervention worksTermic architecture and restoration INTERIOARY INSTALATIES AND FINISAJE Previously:a. Replacement of the existing interior carpentry, made in several stages and of different materials, with a unitary, quality and aesthetic look. Repair of the finishes affected by the replacement of the exterior/indoor carpentry and the components of the heating system (pipe paths, static bodies).c. Repairing floors in the groove areas and mounting roll closing profiles. The replacement of the existing interior carpentry, made in several stages and of different materials, with a unitary, BSI quality carpentry with aesthetically pleasing appearance Exteriora. Realisation of the thermosystem on the facade of the buildingb. The replacement of the existing exterior carpentry with one with an energy efficiency classThe interior of the plate over the basement, which has areas of exfoliation of the concrete coating and reinforcement thus exposed is corroded, sanitary installationsAt cold water installations and hot water from the saloons and toilets will be replaced by batteries from showers and sinks with some modern ones that have provided the same water effect as water washers will be used in the water. (English) / qualifier | |
| point in time: 17 June 2021Timestamp | +2021-06-17T00:00:00Z |
---|
Timezone | +00:00 |
---|
Calendar | Gregorian |
---|
Precision | 1 day |
---|
Before | 0 |
---|
After | 0 |
---|
| |
Property / beneficiary | |
| Q2754166 (Deleted Item)
| |
Property / beneficiary: Q2754166 (Deleted Item) / rank | |
| Normal rank
| |