Rehabilitation for energy efficiency of Novaci City Hospital (Q2743923): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
(‎Removed claims)
Tag: Replaced
Property / instance of
 
Property / instance of: Kohesio project / rank
Normal rank
 
Property / financed by
 
Property / financed by: European Union / rank
Normal rank
 
Property / intervention field
 
Property / intervention field: Energy efficiency renovation of public infrastructure, demonstration projects and supporting measures / rank
Normal rank
 
Property / country
 
Property / country: Romania / rank
Normal rank
 
Property / EU contribution
5,679,081.04 Romanian Leu
Amount5,679,081.04 Romanian Leu
UnitRomanian Leu
 
Property / EU contribution: 5,679,081.04 Romanian Leu / rank
Normal rank
 
Property / EU contribution
1,135,816.208 Euro
Amount1,135,816.208 Euro
UnitEuro
 
Property / EU contribution: 1,135,816.208 Euro / rank
Preferred rank
 
Property / EU contribution: 1,135,816.208 Euro / qualifier
exchange rate to Euro: 0.2 Euro
Amount0.2 Euro
UnitEuro
 
Property / EU contribution: 1,135,816.208 Euro / qualifier
point in time: 15 June 2021
Timestamp+2021-06-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / budget
6,681,271.8100000005 Romanian Leu
Amount6,681,271.8100000005 Romanian Leu
UnitRomanian Leu
 
Property / budget: 6,681,271.8100000005 Romanian Leu / rank
Normal rank
 
Property / budget
1,336,254.3620000002 Euro
Amount1,336,254.3620000002 Euro
UnitEuro
 
Property / budget: 1,336,254.3620000002 Euro / rank
Preferred rank
 
Property / budget: 1,336,254.3620000002 Euro / qualifier
exchange rate to Euro: 0.2 Euro
Amount0.2 Euro
UnitEuro
 
Property / budget: 1,336,254.3620000002 Euro / qualifier
point in time: 15 June 2021
Timestamp+2021-06-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / co-financing rate
0.85 percent
Amount0.85 percent
Unitpercent
 
Property / co-financing rate: 0.85 percent / rank
Normal rank
 
Property / start time
18 September 2018
Timestamp+2018-09-18T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / start time: 18 September 2018 / rank
Normal rank
 
Property / end time
30 September 2022
Timestamp+2022-09-30T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / end time: 30 September 2022 / rank
Normal rank
 
Property / beneficiary name (string)
UAT Oras Novaci
 
Property / beneficiary name (string): UAT Oras Novaci / rank
Normal rank
 
Property / location (string)
GJ, Novaci
 
Property / location (string): GJ, Novaci / rank
Normal rank
 
Property / summary
Descrierea principalelor lucrari de interventiiArhitecturaREABILITARE TERMICA SI REFACERE INSTALATII INTERIOARE SI FINISAJEInterior:a. Inlocuirea tamplariei interioare existente, realizata in mai multe etape si din materiale diferite, cu o tamplarie unitara, de calitate si cu aspect estetic placutb. Repararea finisajelor afectate de inlocuirea tamplariei exterioare/interioare si a elementelor componente ale sistemului de incalzire (trasee de conducte, corpuri statice) .c. Repararea pardoselilor in zonele de rost si montarea de profile de inchidere rostd. Inlocuirea tamplariei interioare existente, realizata in mai multe etape si din materiale diferite, cu o tamplarie unitara, de calitate bsi cu aspect estetic placutExteriora. Realizarea termosistemului pe fatada imobiluluib. Înlocuirea tâmplariei exterioarea existente cu una cu o clasa de eficienta energeticaRezistenta Intradosul placii de peste subsol, care prezinta zone de exfoliere a betonului de acoperire si armatura astfel expusa este corodata,Instalatii sanitareLa instalatiile de apa rece si apa calda din saloane si din grupurile sanitare se vor inlocui bateriile de la dusuri si chiuvete cu unele moderne care au prevazute perlatoare ce fac ca in jetul de apa sa fie antrenat si aer astfel incat la acelasi efect de spalare consumurile de apa vor fi mult diminuate.Se vor izola conductele de apa rece si apa calda pentru a nu aparea condensul si, respectiv, de a avea pierderi de caldura cat mai mici (Romanian)
 
Property / summary: Descrierea principalelor lucrari de interventiiArhitecturaREABILITARE TERMICA SI REFACERE INSTALATII INTERIOARE SI FINISAJEInterior:a. Inlocuirea tamplariei interioare existente, realizata in mai multe etape si din materiale diferite, cu o tamplarie unitara, de calitate si cu aspect estetic placutb. Repararea finisajelor afectate de inlocuirea tamplariei exterioare/interioare si a elementelor componente ale sistemului de incalzire (trasee de conducte, corpuri statice) .c. Repararea pardoselilor in zonele de rost si montarea de profile de inchidere rostd. Inlocuirea tamplariei interioare existente, realizata in mai multe etape si din materiale diferite, cu o tamplarie unitara, de calitate bsi cu aspect estetic placutExteriora. Realizarea termosistemului pe fatada imobiluluib. Înlocuirea tâmplariei exterioarea existente cu una cu o clasa de eficienta energeticaRezistenta Intradosul placii de peste subsol, care prezinta zone de exfoliere a betonului de acoperire si armatura astfel expusa este corodata,Instalatii sanitareLa instalatiile de apa rece si apa calda din saloane si din grupurile sanitare se vor inlocui bateriile de la dusuri si chiuvete cu unele moderne care au prevazute perlatoare ce fac ca in jetul de apa sa fie antrenat si aer astfel incat la acelasi efect de spalare consumurile de apa vor fi mult diminuate.Se vor izola conductele de apa rece si apa calda pentru a nu aparea condensul si, respectiv, de a avea pierderi de caldura cat mai mici (Romanian) / rank
Normal rank
 
Property / summary
Description of the main intervention worksTermic architecture and restoration INTERIOARY INSTALATIES AND FINISAJE Previously:a. Replacement of the existing interior carpentry, made in several stages and of different materials, with a unitary, quality and aesthetic look. Repair of the finishes affected by the replacement of the exterior/indoor carpentry and the components of the heating system (pipe paths, static bodies).c. Repairing floors in the groove areas and mounting roll closing profiles. The replacement of the existing interior carpentry, made in several stages and of different materials, with a unitary, BSI quality carpentry with aesthetically pleasing appearance Exteriora. Realisation of the thermosystem on the facade of the buildingb. The replacement of the existing exterior carpentry with one with an energy efficiency classThe interior of the plate over the basement, which has areas of exfoliation of the concrete coating and reinforcement thus exposed is corroded, sanitary installationsAt cold water installations and hot water from the saloons and toilets will be replaced by batteries from showers and sinks with some modern ones that have provided the same water effect as water washers will be used in the water. (English)
 
Property / summary: Description of the main intervention worksTermic architecture and restoration INTERIOARY INSTALATIES AND FINISAJE Previously:a. Replacement of the existing interior carpentry, made in several stages and of different materials, with a unitary, quality and aesthetic look. Repair of the finishes affected by the replacement of the exterior/indoor carpentry and the components of the heating system (pipe paths, static bodies).c. Repairing floors in the groove areas and mounting roll closing profiles. The replacement of the existing interior carpentry, made in several stages and of different materials, with a unitary, BSI quality carpentry with aesthetically pleasing appearance Exteriora. Realisation of the thermosystem on the facade of the buildingb. The replacement of the existing exterior carpentry with one with an energy efficiency classThe interior of the plate over the basement, which has areas of exfoliation of the concrete coating and reinforcement thus exposed is corroded, sanitary installationsAt cold water installations and hot water from the saloons and toilets will be replaced by batteries from showers and sinks with some modern ones that have provided the same water effect as water washers will be used in the water. (English) / rank
Normal rank
 
Property / summary: Description of the main intervention worksTermic architecture and restoration INTERIOARY INSTALATIES AND FINISAJE Previously:a. Replacement of the existing interior carpentry, made in several stages and of different materials, with a unitary, quality and aesthetic look. Repair of the finishes affected by the replacement of the exterior/indoor carpentry and the components of the heating system (pipe paths, static bodies).c. Repairing floors in the groove areas and mounting roll closing profiles. The replacement of the existing interior carpentry, made in several stages and of different materials, with a unitary, BSI quality carpentry with aesthetically pleasing appearance Exteriora. Realisation of the thermosystem on the facade of the buildingb. The replacement of the existing exterior carpentry with one with an energy efficiency classThe interior of the plate over the basement, which has areas of exfoliation of the concrete coating and reinforcement thus exposed is corroded, sanitary installationsAt cold water installations and hot water from the saloons and toilets will be replaced by batteries from showers and sinks with some modern ones that have provided the same water effect as water washers will be used in the water. (English) / qualifier
point in time: 17 June 2021
Timestamp+2021-06-17T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / beneficiary
Q2754166 (Deleted Item)
 
Property / beneficiary: Q2754166 (Deleted Item) / rank
Normal rank
 

Revision as of 11:47, 14 September 2021

Project Q2743923 in Romania
Language Label Description Also known as
English
Rehabilitation for energy efficiency of Novaci City Hospital
Project Q2743923 in Romania

    Statements

    Identifiers

    118603
    0 references