Property / instance of | |
| | |
Property / instance of: Kohesio project / rank | |
| Normal rank
| |
Property / financed by | |
| | |
Property / financed by: European Union / rank | |
| Normal rank
| |
Property / intervention field | |
| | |
Property / intervention field: Other reconstructed or improved road (motorway, national, regional or local) / rank | |
| Normal rank
| |
Property / country | |
| | |
Property / country: Romania / rank | |
| Normal rank
| |
Property / EU contribution | |
| 4,814,470.53 Romanian Leu | |
Property / EU contribution: 4,814,470.53 Romanian Leu / rank | |
| Normal rank
| |
Property / EU contribution | |
| 962,894.1060000001 EuroAmount | 962,894.1060000001 Euro |
---|
Unit | Euro |
---|
| |
Property / EU contribution: 962,894.1060000001 Euro / rank | |
| Preferred rank
| |
Property / EU contribution: 962,894.1060000001 Euro / qualifier | |
| | |
Property / EU contribution: 962,894.1060000001 Euro / qualifier | |
| point in time: 15 June 2021Timestamp | +2021-06-15T00:00:00Z |
---|
Timezone | +00:00 |
---|
Calendar | Gregorian |
---|
Precision | 1 day |
---|
Before | 0 |
---|
After | 0 |
---|
| |
Property / budget | |
| 5,664,082.970000001 Romanian Leu | |
Property / budget: 5,664,082.970000001 Romanian Leu / rank | |
| Normal rank
| |
Property / budget | |
| 1,132,816.5940000003 EuroAmount | 1,132,816.5940000003 Euro |
---|
Unit | Euro |
---|
| |
Property / budget: 1,132,816.5940000003 Euro / rank | |
| Preferred rank
| |
Property / budget: 1,132,816.5940000003 Euro / qualifier | |
| | |
Property / budget: 1,132,816.5940000003 Euro / qualifier | |
| point in time: 15 June 2021Timestamp | +2021-06-15T00:00:00Z |
---|
Timezone | +00:00 |
---|
Calendar | Gregorian |
---|
Precision | 1 day |
---|
Before | 0 |
---|
After | 0 |
---|
| |
Property / co-financing rate | |
| | |
Property / co-financing rate: 0.85 percent / rank | |
| Normal rank
| |
Property / start time | |
| 4 February 2016Timestamp | +2016-02-04T00:00:00Z |
---|
Timezone | +00:00 |
---|
Calendar | Gregorian |
---|
Precision | 1 day |
---|
Before | 0 |
---|
After | 0 |
---|
| |
Property / start time: 4 February 2016 / rank | |
| Normal rank
| |
Property / end time | |
| 1 January 2021Timestamp | +2021-01-01T00:00:00Z |
---|
Timezone | +00:00 |
---|
Calendar | Gregorian |
---|
Precision | 1 day |
---|
Before | 0 |
---|
After | 0 |
---|
| |
Property / end time: 1 January 2021 / rank | |
| Normal rank
| |
Property / beneficiary name (string) | |
| UAT JUDETUL MEHEDINTI
| |
Property / beneficiary name (string): UAT JUDETUL MEHEDINTI / rank | |
| Normal rank
| |
Property / location (string) | |
| MH, Burila Mare, Devesel
| |
Property / location (string): MH, Burila Mare, Devesel / rank | |
| Normal rank
| |
Property / summary | |
| Drumul judeţean 565 are o lungime totală de 31,232 km şi îşi are începutul la intrarea în localitatea Jiana Mare, comuna Jiana, întersecţia cu DJ 606 şi se desfăşoară pe traseul Mileni, Burila Mare, Crivina, Vrancea, Batoti până la Dunărea Mică. Se urmareste realizarea unei structuri rutiere astfel încât să răspundă necesităţii traficului actual şi de perspectivă, elementele privind scurgerea apelor şi cele privind siguranţa circulaţiei. Traseul DJ565, respectiv Intrare sat Mileni-int DN56C-Burila Mare (int. DN56B)-Crivina-Vrancea – Batoţi (int. DN56B) asigura conectivitatea indirecta la reteaua TEN-T prin DN 56B, DN 56C. Pentru sectorul DJ 565 km 8+632 – 9+632, km 20+000 – 21+000 Vrancea L= 2km si tronsonul DJ 565 Crivina (asfalt)- Vrancea (la asfalt) km 16+845 – 20+000, L=3,155 km, proiectarea a avut in vedere urmatoarele obiective: - corectarea in plan si spatiu a elementelor geometrice ale traseului existent, astfel incat sa se asigure conditiile tehnice necesare pentru o viteza de proiectare de 40km/ora; - stabilirea axei proiectate astfel incat sa se foloseasca intr-o masura cat mai mare traseul existent; - realizarea lucrarilor de infrastructura; - executarea unei structuri rutiere performante, cu imbracaminte bituminoasa moderna; -refacerea si completarea dispozitivelor de scurgere a apelor meteorice (santuri, rigole, inlocuirea podetelor degradate, prevederea unor podete noi); - realizarea acostamentelor consolidate din balast; -amenajarea drumurilor laterale si acceselor la proprietati; - executarea lucrarilor privind siguranta circulatiei rutiere. (Romanian)
| |
Property / summary: Drumul judeţean 565 are o lungime totală de 31,232 km şi îşi are începutul la intrarea în localitatea Jiana Mare, comuna Jiana, întersecţia cu DJ 606 şi se desfăşoară pe traseul Mileni, Burila Mare, Crivina, Vrancea, Batoti până la Dunărea Mică. Se urmareste realizarea unei structuri rutiere astfel încât să răspundă necesităţii traficului actual şi de perspectivă, elementele privind scurgerea apelor şi cele privind siguranţa circulaţiei. Traseul DJ565, respectiv Intrare sat Mileni-int DN56C-Burila Mare (int. DN56B)-Crivina-Vrancea – Batoţi (int. DN56B) asigura conectivitatea indirecta la reteaua TEN-T prin DN 56B, DN 56C. Pentru sectorul DJ 565 km 8+632 – 9+632, km 20+000 – 21+000 Vrancea L= 2km si tronsonul DJ 565 Crivina (asfalt)- Vrancea (la asfalt) km 16+845 – 20+000, L=3,155 km, proiectarea a avut in vedere urmatoarele obiective: - corectarea in plan si spatiu a elementelor geometrice ale traseului existent, astfel incat sa se asigure conditiile tehnice necesare pentru o viteza de proiectare de 40km/ora; - stabilirea axei proiectate astfel incat sa se foloseasca intr-o masura cat mai mare traseul existent; - realizarea lucrarilor de infrastructura; - executarea unei structuri rutiere performante, cu imbracaminte bituminoasa moderna; -refacerea si completarea dispozitivelor de scurgere a apelor meteorice (santuri, rigole, inlocuirea podetelor degradate, prevederea unor podete noi); - realizarea acostamentelor consolidate din balast; -amenajarea drumurilor laterale si acceselor la proprietati; - executarea lucrarilor privind siguranta circulatiei rutiere. (Romanian) / rank | |
| Normal rank
| |
Property / summary | |
| The county road 565 has a total length of 31.232 km and has its beginning at the entrance of Jiana Mare village, Jiana commune, the intersection with DJ 606 and takes place on the route Mileni, Burila Mare, Crivina, Vrancea, Batoti to the Mică Danube. The aim is to build a road structure in order to meet the need for current and forward-looking traffic, water leakage and traffic safety elements. The DJ565 route, respectively Mileni-int DN56C-Burila Mare village entrance (int. DN56B)-Crivina-Vrancea – Battery (int. DN56B) ensures indirect connectivity to the TEN-T network through DN 56B, DN 56C. For DJ sector 565 km 8+ 632-9+ 632, km 20+ 000-21+ 000 Vrancea L= 2 km and section DJ 565 Crivina (asphalt) – Vrancea (at asphalt) km 16+ 845-20+ 000, L=3.155 km, the design took into account the following objectives: — correction in plane and space of the geometric elements of the existing route, so as to ensure the technical conditions necessary for a design speed of 40 km/h; — Establishment of the axis designed so as to use the existing route as much as possible; — realisation of infrastructure works; — execution of a high-performance road structure with modern bituminous clothing; — redeploying and completing the leakage devices of meteoric waters (wells, ditches, replacement of degraded floors, provision of new floors); — realisation of consolidated ballast moorings; — arranging side roads and access to properties; — execution of road safety works. (English)
| |
Property / summary: The county road 565 has a total length of 31.232 km and has its beginning at the entrance of Jiana Mare village, Jiana commune, the intersection with DJ 606 and takes place on the route Mileni, Burila Mare, Crivina, Vrancea, Batoti to the Mică Danube. The aim is to build a road structure in order to meet the need for current and forward-looking traffic, water leakage and traffic safety elements. The DJ565 route, respectively Mileni-int DN56C-Burila Mare village entrance (int. DN56B)-Crivina-Vrancea – Battery (int. DN56B) ensures indirect connectivity to the TEN-T network through DN 56B, DN 56C. For DJ sector 565 km 8+ 632-9+ 632, km 20+ 000-21+ 000 Vrancea L= 2 km and section DJ 565 Crivina (asphalt) – Vrancea (at asphalt) km 16+ 845-20+ 000, L=3.155 km, the design took into account the following objectives: — correction in plane and space of the geometric elements of the existing route, so as to ensure the technical conditions necessary for a design speed of 40 km/h; — Establishment of the axis designed so as to use the existing route as much as possible; — realisation of infrastructure works; — execution of a high-performance road structure with modern bituminous clothing; — redeploying and completing the leakage devices of meteoric waters (wells, ditches, replacement of degraded floors, provision of new floors); — realisation of consolidated ballast moorings; — arranging side roads and access to properties; — execution of road safety works. (English) / rank | |
| Normal rank
| |
Property / summary: The county road 565 has a total length of 31.232 km and has its beginning at the entrance of Jiana Mare village, Jiana commune, the intersection with DJ 606 and takes place on the route Mileni, Burila Mare, Crivina, Vrancea, Batoti to the Mică Danube. The aim is to build a road structure in order to meet the need for current and forward-looking traffic, water leakage and traffic safety elements. The DJ565 route, respectively Mileni-int DN56C-Burila Mare village entrance (int. DN56B)-Crivina-Vrancea – Battery (int. DN56B) ensures indirect connectivity to the TEN-T network through DN 56B, DN 56C. For DJ sector 565 km 8+ 632-9+ 632, km 20+ 000-21+ 000 Vrancea L= 2 km and section DJ 565 Crivina (asphalt) – Vrancea (at asphalt) km 16+ 845-20+ 000, L=3.155 km, the design took into account the following objectives: — correction in plane and space of the geometric elements of the existing route, so as to ensure the technical conditions necessary for a design speed of 40 km/h; — Establishment of the axis designed so as to use the existing route as much as possible; — realisation of infrastructure works; — execution of a high-performance road structure with modern bituminous clothing; — redeploying and completing the leakage devices of meteoric waters (wells, ditches, replacement of degraded floors, provision of new floors); — realisation of consolidated ballast moorings; — arranging side roads and access to properties; — execution of road safety works. (English) / qualifier | |
| point in time: 17 June 2021Timestamp | +2021-06-17T00:00:00Z |
---|
Timezone | +00:00 |
---|
Calendar | Gregorian |
---|
Precision | 1 day |
---|
Before | 0 |
---|
After | 0 |
---|
| |
Property / beneficiary | |
| Q2754000 (Deleted Item)
| |
Property / beneficiary: Q2754000 (Deleted Item) / rank | |