Q3095648 (Q3095648): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created a new Item)
 
(‎Changed label, description and/or aliases in en)
description / endescription / en
Project 0.5008647055889328 in Romania
Project Q3095648 in Romania

Revision as of 09:47, 14 September 2021

Project Q3095648 in Romania
Language Label Description Also known as
English
No label defined
Project Q3095648 in Romania

    Statements

    0 references
    43,395,452.47 Romanian Leu
    0 references
    8,679,090.494 Euro
    13 September 2021
    0 references
    51,053,473.5 Romanian Leu
    0 references
    10,210,694.700000001 Euro
    13 September 2021
    0 references
    0.85 percent
    0 references
    1 July 2017
    0 references
    31 December 2023
    0 references
    COMPANIA NAŢIONALĂ DE ADMINISTRARE A INFRASTRUCTURII RUTIERE S.A./Departament Documentatii Obtinere Fonduri Externe
    0 references
    0 references
    By LIOP seeks to enlarge the road transport infrastructure located on TEN-T core network by completing sections whose construction was started in the POST 2007-2013 period and those to be established by GTMP, ensuring the further development of the network defined . This will lead, first, to save time in road transport of goods and passengers between regions of Romania and Central, West and South as a result of eliminating bottlenecks on the routes concerned, providing increased mobility. These results will contibute to promote economic competitiveness by improving conditions in road transport of goods and passengers, and to reduce emissions by eliminating / reducing traffic congestion by reducing journey times. Construction of Timisoara-Lugoj Motorway and Timisoara Bypass at the motorway level leads to achieving the result indicator 2S1- reducing average travel time on the road network TEN-Central under Priority Axis 1 Improving mobility by developing the TEN-T network and underground transport. By achievement of Timisoara-Lugoj Motorway and Timisoara Bypass at the motorway level construction will ease the traffic in the area will be secured business conditions of supply and reduce transport times and costs, fuel consumption and reduce the cost of maintenance and repair of vehicles. Benefits of implementing the project are: - Looking from the perspective of economic development: - improving general accessibility and attract investors due to fluid traffic flow; - reducing operating costs at the population level as transposing saving time and travel costs lower; - reducing the carriers costs by reducing the amount of usable fuel and lowering maintenance costs. - In terms of sustainable social development: - increasing the safety of road users: pedestrians and drivers; - easy access for rescue crews, firefighters and police; - low number of accidents; - easy access to education; - potential decrease in unemployment as a result of sustainable economic development. Following the implementation of the phasing indicators for the project, those will contribute to the overall objective, respectively achieving the 35,125 km of 2x2 motorway, thus contributing to the achievement of the preset indicator CO13A - Roads: The total new built length for roads of which: TEN-T. (Romanian)
    0 references
    Municipiul Timişoara, Romania
    0 references

    Identifiers

    110647
    0 references