Requalification of Dairas School (Q2899323): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
(‎Removed claim: co-financing rate (P837): 85.0 percent, Removing co-finance rate from projects in portugal)
Property / co-financing rate
85.0 percent
Amount85.0 percent
Unitpercent
 
Property / co-financing rate: 85.0 percent / rank
Normal rank
 

Revision as of 14:33, 13 September 2021

Project Q2899323 in Portugal
Language Label Description Also known as
English
Requalification of Dairas School
Project Q2899323 in Portugal

    Statements

    0 references
    1,611,823.62 Euro
    0 references
    12 October 2016
    0 references
    18 December 2020
    0 references
    MUNICÍPIO DE VALE DE CAMBRA
    0 references

    40°49'55.70"N, 8°23'32.64"W
    0 references
    Responder aos problemas de degradação associados à falta de manutenção e à necessidade de melhores condições de conforto, nomeadamente, a nível da eficiência energética. A presente Operação integra a elaboração do projeto, a intervenção física, essencialmente ao nível da cobertura, das fachadas e dos vão exteriores. Serão adquiridos mobiliário e equipamento informático com vista à respetiva atualização. (Portuguese)
    0 references
    Respond to degradation problems associated with lack of maintenance and the need for better conditions of comfort, including energy efficiency. This Operation integrates the elaboration of the project, physical intervention, essentially at the level of coverage, frontiers and exterior spans. Furniture and computer equipment will be purchased with a view to updating them. (English)
    8 July 2021
    0 references
    Vale de Cambra, São Pedro de Castelões
    0 references

    Identifiers

    NORTE-08-5673-FEDER-000132
    0 references