Lourinha Interface – Rio Tinto (Q2895580): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The Operation Interface of Lourinha Rio Tinto consists of the construction of large pedestrian/cyclable walks, which will be the main mode of movement of the interface at the entrance and start of people on their arrival and departure routes, enabling a more planned, orderly and safe pedestrian flow, allowing the transhipment and waiting between the flow of public transport in the surrounding area, namely train station and bus stops., translated...)
(‎Removed claim: co-financing rate (P837): 85.0 percent, Removing co-finance rate from projects in portugal)
Property / co-financing rate
85.0 percent
Amount85.0 percent
Unitpercent
 
Property / co-financing rate: 85.0 percent / rank
Normal rank
 

Revision as of 13:50, 13 September 2021

Project Q2895580 in Portugal
Language Label Description Also known as
English
Lourinha Interface – Rio Tinto
Project Q2895580 in Portugal

    Statements

    0 references
    31,212.13 Euro
    0 references
    1 February 2021
    0 references
    30 September 2021
    0 references
    MUNICÍPIO DE GONDOMAR
    0 references
    0 references

    41°10'50.59"N, 8°33'27.25"W
    0 references
    A Operação “Interface da Lourinha – Rio Tinto” consiste na construção de passeios pedonais/cicláveis amplos, que serão o modo de circulação principal da interface na entrada e largada de pessoas nos seus percursos de chegada e partida, possibilitando um fluxo pedonal mais planeado, ordenado e seguro, permitindo o transbordo e espera entre o fluxo de transportes públicos na envolvente, nomeadamente estação de comboios e paragens de autocarros. (Portuguese)
    0 references
    The Operation Interface of Lourinha Rio Tinto consists of the construction of large pedestrian/cyclable walks, which will be the main mode of movement of the interface at the entrance and start of people on their arrival and departure routes, enabling a more planned, orderly and safe pedestrian flow, allowing the transhipment and waiting between the flow of public transport in the surrounding area, namely train station and bus stops. (English)
    8 July 2021
    0 references
    Gondomar, Rio Tinto
    0 references

    Identifiers

    NORTE-05-1406-FEDER-000310
    0 references