Requalification of Rua Carlos marnoto (Q2878255): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
(‎Removed claim: co-financing rate (P837): 85.0 percent, Removing co-finance rate from projects in portugal)
Property / co-financing rate
85.0 percent
Amount85.0 percent
Unitpercent
 
Property / co-financing rate: 85.0 percent / rank
Normal rank
 

Revision as of 11:35, 13 September 2021

Project Q2878255 in Portugal
Language Label Description Also known as
English
Requalification of Rua Carlos marnoto
Project Q2878255 in Portugal

    Statements

    0 references
    112,877.22 Euro
    0 references
    7 January 2019
    0 references
    28 March 2020
    0 references
    MUNICÍPIO DE ÍLHAVO
    0 references
    Q2991046 (Deleted Item)
    0 references

    40°35'48.01"N, 8°40'54.98"W
    0 references
    A presente operação consiste essencialmente numa redefinição do perfil da via (alinhamentos de vias e bermas / recolha de águas para meias-canas / redução dos ressaltos de piso) e numa uniformização dos materiais de revestimento bem como uma ligeira obra de correção de componentes das redes de águas e saneamento. (Portuguese)
    0 references
    This operation consists essentially of a redefinition of the track profile (alignments of track and sideways/water collection for half-scanes/reduction of pavement jumps) and a standardisation of coating materials as well as a slight correction of water and sanitation components. (English)
    7 July 2021
    0 references
    Ílhavo, Ílhavo (São Salvador)
    0 references

    Identifiers

    CENTRO-09-2316-FEDER-000084
    0 references