Basic School of Penafirme Póvoa (Q2871038): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
(‎Removed claim: co-financing rate (P837): 85.0 percent, Removing co-finance rate from projects in portugal)
Property / co-financing rate
85.0 percent
Amount85.0 percent
Unitpercent
 
Property / co-financing rate: 85.0 percent / rank
Normal rank
 

Revision as of 11:02, 13 September 2021

Project Q2871038 in Portugal
Language Label Description Also known as
English
Basic School of Penafirme Póvoa
Project Q2871038 in Portugal

    Statements

    0 references
    1,367,867.23 Euro
    0 references
    11 April 2019
    0 references
    31 December 2021
    0 references
    MUNICIPIO DE TORRES VEDRAS
    0 references
    0 references

    39°9'27.36"N, 9°19'13.73"W
    0 references
    A presente candidatura tem como objeto de intervenção a construção da Escola Básica de Póvoa de Penafirme no concelho de Torres Vedras, equipamento dedicado ao ensino pré-escolar e ao 1.º ciclo do ensino básico, destinado a dotar a União de freguesias de A dos Cunhados e Maceira de melhores condições de ensino e aprendizagem e a otimizar a rede de equipamentos escolares existentes. (Portuguese)
    0 references
    The purpose of this application is the construction of the Basic School of Póvoa de Penafirme in the municipality of Torres Vedras, equipment dedicated to pre-school education and the 1st cycle of primary education, intended to provide the Union of parishes of A dos Cunhados and Maceira with better teaching and learning conditions and to optimise the network of existing school equipment. (English)
    7 July 2021
    0 references
    Torres Vedras, União das freguesias de A dos Cunhados e Maceira
    0 references

    Identifiers

    CENTRO-03-5673-FEDER-000130
    0 references