Cycling corridor of the parish of Quintinha – Alcácer do Sal (Q2863235): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
(‎Removed claim: co-financing rate (P837): 85.0 percent, Removing co-finance rate from projects in portugal)
Property / co-financing rate
85.0 percent
Amount85.0 percent
Unitpercent
 
Property / co-financing rate: 85.0 percent / rank
Normal rank
 

Revision as of 09:31, 13 September 2021

Project Q2863235 in Portugal
Language Label Description Also known as
English
Cycling corridor of the parish of Quintinha – Alcácer do Sal
Project Q2863235 in Portugal

    Statements

    0 references
    83,667.94 Euro
    0 references
    15 August 2016
    0 references
    15 August 2017
    0 references
    MUNICÍPIO DE ALCÁCER DO SAL
    0 references

    38°24'16.60"N, 8°36'19.58"W
    0 references
    O Corredor ciclável da Quintinha corresponde à materialização dos corredores cicláveis apontados para a "viabilização de deslocações de natureza quotidiana do bairro periférico - Bairro da Quintinha e a zona ribeirinha/centro histórico da cidade, potenciando também uma utilização mais intensa do corredor ciclável já existente na zona ribeirinha Poente." (Portuguese)
    0 references
    The Quintinha cyclable Corridor corresponds to the materialisation of the cyclable corridors pointed out for the “viabilisation of travels of a daily nature of the parish peripheral – parish of Quintinha and the riverside area/historic centre of the city, also boosting a more intense use of the cycling corridor already existing in the riverside zone Poente.” (English)
    6 July 2021
    0 references
    Alcácer do Sal, União das freguesias de Alcácer do Sal (Santa Maria do Castelo e Santiago) e Santa Susana
    0 references

    Identifiers

    ALT20-04-1406-FEDER-000008
    0 references