Project of Infrastructure and Education Equipment (Q2862790): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string) |
(Removed claim: co-financing rate (P837): 85.0 percent, Removing co-finance rate from projects in portugal) |
||||||
Property / co-financing rate | |||||||
| |||||||
Property / co-financing rate: 85.0 percent / rank | |||||||
Revision as of 09:23, 13 September 2021
Project Q2862790 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Project of Infrastructure and Education Equipment |
Project Q2862790 in Portugal |
Statements
30,670.8 Euro
0 references
6 August 2020
0 references
30 April 2021
0 references
MUNICIPIO DE BARRANCOS
0 references
O Município de Barrancos, através da presente operação, pretende dotar a infraestrutura educativa do concelho com novo mobiliário, materiais didáticos e computadores, colmatando as necessidades existentes e garantindo um ensino de qualidade e com as condições de conforto, segurança, e modernidade exigidas, na educação pré-escolar e no ensino básico. (Portuguese)
0 references
The Municipality of Barrancos, through the present operation, intends to provide the municipality’s educational infrastructure with new furniture, teaching materials and computers, filling the existing needs and ensuring quality education and with the conditions of comfort, safety, and modernity required, in preschool education and in basic education. (English)
6 July 2021
0 references
Barrancos
0 references
Identifiers
ALT20-02-5673-FEDER-000087
0 references