Requalification of the Schools of the 1st Cycle of Basic Education and Portalegre Childhood Gardens – Phase 2 (Q2862767): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string) |
(Removed claim: co-financing rate (P837): 85.0 percent, Removing co-finance rate from projects in portugal) |
||||||
Property / co-financing rate | |||||||
| |||||||
Property / co-financing rate: 85.0 percent / rank | |||||||
Revision as of 09:23, 13 September 2021
Project Q2862767 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Requalification of the Schools of the 1st Cycle of Basic Education and Portalegre Childhood Gardens – Phase 2 |
Project Q2862767 in Portugal |
Statements
48,881.48 Euro
0 references
1 October 2018
0 references
31 December 2019
0 references
MUNICIPIO DE PORTALEGRE
0 references
A presente operação tem como objectivo principal a requalificação da Escola Básica de Alegrete, visando a melhoria das suas condições de funcionamento, conforto e segurança. Trata-se de uma escola centenária que carece de uma intervenção urgente que permita resolver os problemas existentes, sobretudo, ao nível de infiltrações, isolamento térmico (portas, portadas e janelas), pisos e mobiliário de exterior. (Portuguese)
0 references
This operation has as main objective the requalification of the Basic School of Alegrete, aiming at improving its operating conditions, comfort and safety. It is a centuries-old school that needs urgent intervention to solve the problems that exist, especially in terms of infiltration, thermal insulation (doors, shutters and windows), floors and outdoor furniture. (English)
6 July 2021
0 references
Portalegre, Alegrete
0 references
Identifiers
ALT20-02-5673-FEDER-000071
0 references