ENERGY EFFICIENCY IN THE POOL MUNICIPAL DE CASTRO MARIM (Q2857598): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
(‎Removed claim: co-financing rate (P837): 80.0 percent, Removing co-finance rate from projects in portugal)
Property / co-financing rate
80.0 percent
Amount80.0 percent
Unitpercent
 
Property / co-financing rate: 80.0 percent / rank
Normal rank
 

Revision as of 09:11, 13 September 2021

Project Q2857598 in Portugal
Language Label Description Also known as
English
ENERGY EFFICIENCY IN THE POOL MUNICIPAL DE CASTRO MARIM
Project Q2857598 in Portugal

    Statements

    0 references
    0 references
    63,403.21 Euro
    0 references
    1 January 2019
    0 references
    31 December 2021
    0 references
    MUNICÍPIO DE CASTRO MARIM
    0 references
    0 references

    37°13'4.58"N, 7°26'44.56"W
    0 references
    A operação aposta em medidas que conduzem a 1 diminuição de consumos energéticos no Edifício Piscinas Municipais de Castro Marim, através da substituição de equipamentos obsoletos por outros eficientes, utilização de sistemas solares (térmico) e colocação de isolamento térmico na cobertura. Pretende-se diminuir o impacto energético e carbónico, pela redução de emissões com efeito de estufa. (Portuguese)
    0 references
    The operation focuses on measures that lead to 1 reduction of energy consumption in the Municipal Pools Building of Castro Marim, through the replacement of obsolete equipment by other efficient ones, use of solar systems (thermal) and placement of thermal insulation in the roof. The aim is to reduce the energy and carbon impact by reducing greenhouse emissions. (English)
    6 July 2021
    0 references
    Castro Marim
    0 references

    Identifiers

    ALG-03-1203-FEDER-000025
    0 references