Heating centre No.1, 18.novembra iela 2, Daugavpils, increasing energy efficiency of garage premises. (Q3057105): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en: translated_label) |
(Changed an Item) |
||||||
Property / co-financing rate | |||||||
0.85 percent
| |||||||
Property / co-financing rate: 0.85 percent / rank | |||||||
Normal rank |
Revision as of 14:07, 10 September 2021
Project Q3057105 in Latvia
Language | Label | Description | Also known as |
---|---|---|---|
English | Heating centre No.1, 18.novembra iela 2, Daugavpils, increasing energy efficiency of garage premises. |
Project Q3057105 in Latvia |
Statements
94,568.88 Euro
0 references
111,257.51 Euro
0 references
0.85 percent
0 references
6 September 2018
0 references
5 February 2020
0 references
Pašvaldības akciju sabiedrība "Daugavpils siltumtīkli"
0 references
Projekta mērķis:Sekmēt pašvaldības akciju sabiedrības "Daugavpils siltumtīkli" garāžas ēkas energoefektivitātes paaugstināšanu, samazinot primārās enerģijas patēriņu. Projekta galvenās darbības:1. Energaudita veikšana;2. Apliecinājuma kartes izstrāde;3. Būvdarbu veikšana: 3.1. fasādes ārsienu siltināšana, logu, durvju un vārtu nomaiņa;3.2. cokola siltināšana;3.3. jumta pārseguma siltināšana;3.4. ventilācijas sistēmas izbūve;3.5. apkures sistēmas rekonstrukcija;3.6. apgaismojuma nomaiņa;4. Autoruzraudzība;5. Būvuzraudzība;6. Projekta publicitātes nodrošināšana;7. Objekta nodošana ekspluatācijā. Projekta ilgums:Projekta aktivitāšu uzsākšana ir plānota no 2018.gada III ceturkšņa, pirms vienošanās par projekta īstenošanu parakstīšanas.Projekta īstenošana nodrošinās pašvaldības kapitālsabiedrības pakalpojumu kvalitāti un energoefektivitātes palielināšanu, kā arī uzlabos ēku ārējo izskatu un pilsētvides pievilcību.Plānotais projekta īstenošanas ilgums: 17 mēneši.Darbi tika uzsākti 2015.gadā, kad tika noslēgts līgums apliecinājuma karšu izstrādei. Projekta kopējās izmaksas: EUR 275`713,84, no tiem attiecināmās izmaksas EUR 111`331,04.Projekta plānotie rezultāti:•tiks samazināts primārās enerģijas patēriņš, sekmējot ilgtermiņā energoefektivitātes paaugstināšanu un pašvaldības kapitālsabiedrības izdevumu samazināšanos par siltumapgādi, •tiks sasniegtas energoefektivitātes prasības atbilstoši Latvijas būvnormatīvā LBN 002-15 “Ēku norobežojošo konstrukciju siltumtehnika”.Garāžas ēka 18.novembra ielā 2 (kad.nr. 0500 0002 1702 034) ir būvēta 1952.g., apkurināmā platība ir 177.1 m2. Ēka ir uzcelta pēc specprojekta. Ēkas vispārējs siltumtehniskais stāvoklis ir neapmierinošs, jo ēkas norobežojošās konstrukcijas – ārsienu, jumta, ka arī logu siltumpretestība neatbilst spēkā esošajiem Latvijas būvnormatīviem. Ēkā strādā 30 uzņēmuma darbinieki. Ēka tiek izmantota sabiedriskajiem pakalpojumiem (siltumapgāde). Noslēgts pakalpojumu līgums par siltumapgādes sabiedrisko pakalpojumu sniegšanu. Energoefektivitātes uzlabošanas jomā ēkā nekas netika veikts. Ēkas infrastruktūra ir morāli un fiziski novecojusi, tā neatbilst mūsdienu prasībām. Veicot nepieciešamus energoefektivitātes paaugstināšanas pasākumus, atbilstoši energoaudita rezultātiem, pašvaldības kapitālsabiedrības ēkā tiks nodrošināta ēku ilgtspējīga izmantošana ar zemu enerģijas un siltuma patēriņu, uzlabots ēku estētiskais veidols, aizsargātas pamatkonstrukcijas no klimatisko apstākļu ietekmes, kā arī samazināta negatīvā ietekme uz vidi (SEG emisijas). (Latvian)
0 references
The aim of the project:To promote energy efficiency improvement of the garage building of the municipal joint stock company “Daugavpils siltumtīkli” by reducing primary energy consumption. Main activities of the project:1. Conduct of Energ audit;2. Development of a certificate map;3. Execution of works: 3.1. insulation of facade exterior walls, replacement of windows, doors and gates; 3.2. insulation of cap; 3.3. insulation of roof covering; 3.4. construction of ventilation system;3.5. reconstruction of heating system;3.6. lighting replacement;4. Author supervision;5. Construction supervision;6. Ensuring the publicity of the project;7. Commissioning of the facility. Project duration:The start of project activities is planned from quarter III of 2018, before signing the agreement on project implementation.Project implementation will ensure the quality of the services and energy efficiency of the municipal capital company, as well as improve the external appearance of buildings and attractiveness of the urban environment. 17 months.Works were started in 2015, when the contract for development of certificates of certificates was signed. Total cost of the project: EUR 275‘713.84, of which the eligible costs EUR 111’331.04.The planned results of the project:•The primary energy consumption will be reduced, thus promoting the long-term improvement of energy efficiency and reduction of the expenditure of the municipal capital company on heating, • the energy efficiency requirements will be achieved according to the Latvian building norm LBN 002-15 “Heat engineering of building envelopes”.The log building on 18 Novemberembra Street 2 (when 0500 0002 1702 034) will be achieved in 1952. The building is built according to a special project. The overall thermal condition of the building is unsatisfactory, because the thermal resistance of the building’s enclosing structures – exterior walls, roofs, as well as windows – does not comply with the current construction standards of Latvia. The building employs 30 employees of the company. The building is used for public services (heat supply). A service contract for the provision of public heat supply services has been concluded. Nothing was done in the field of energy efficiency improvement in the building. The building’s infrastructure is morally and physically outdated, it does not meet modern requirements. By taking necessary energy efficiency improvement measures, in accordance with the results of the energy audit, the sustainable use of buildings with low energy and heat consumption will be ensured in the building of the municipal capital company, the aesthetic form of buildings is improved, the basic structures from the impact of climatic conditions are protected, as well as the negative impact on the environment (GHG emissions) will be reduced. (English)
15 July 2021
0 references
18. novembra iela 2, Daugavpils, LV-5401
0 references
Identifiers
4.2.2.0/18/I/010
0 references