Riga Classic Gymnasium at Purvciema Street 38, Riga, and Riga Zolitude Gymnasium Ruses iela 22, Riga, New Natural Science Corps (Q3057686): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: translated_label)
(‎Changed an Item)
Property / co-financing rate
 
0.31 percent
Amount0.31 percent
Unitpercent
Property / co-financing rate: 0.31 percent / rank
 
Normal rank

Revision as of 14:02, 10 September 2021

Project Q3057686 in Latvia
Language Label Description Also known as
English
Riga Classic Gymnasium at Purvciema Street 38, Riga, and Riga Zolitude Gymnasium Ruses iela 22, Riga, New Natural Science Corps
Project Q3057686 in Latvia

    Statements

    0 references
    0 references
    0 references
    3,592,099.08 Euro
    0 references
    11,619,470.23 Euro
    0 references
    0.31 percent
    0 references
    27 December 2019
    0 references
    31 December 2020
    0 references
    RĪGAS DOMES ĪPAŠUMA DEPARTAMENTS
    0 references
    0 references

    56°57'11.88"N, 24°10'50.84"E
    0 references

    56°56'46.28"N, 24°0'27.68"E
    0 references
    Projekta mērķis – Rīgas Zolitūdes ģimnāzijas Ruses ielā 22, Rīgā un Rīgas Klasiskās ģimnāzijas Purvciema ielā 38, Rīgā, jauno dabaszinātņu korpusu izveide, nodrošinot ergonomiskas mācību vides ierīkošanu un inovatīvu informācijas un tehnoloģiju risinājumu ieviešanu.Galvenās darbības un plānotie rezultāti:1. Piebūves būvniecība pie Rīgas Zolitūdes ģimnāzijas ēkas Ruses ielā 22 un Rīgas Klasiskās ģimnāzijas ēkas Purvciema ielā 38;2. Rīgas Zolitūdes ģimnāzijas un Rīgas Klasiskās ģimnāzijas esošo ēku pārbūve, lai nodrošinātu piebūves savienojamību ar esošo skolu.3. Ergonomiskas mācību vides izveide, mācību telpas aprīkojuma un mēbeļu iegāde, apgaismojuma modernizēšana.4. Inovatīvu IKT risinājumu ieviešana, bezvadu interneta un interneta pieslēguma izveide, mācību procesa nodrošināšanai nepieciešamā aprīkojuma un programmatūras iegāde.5. Jaunu dabaszinātņu (ķīmijas, fizikas, bioloģijas) tostarp praktisko darba telpu izveide.Projekta kopējās izmaksas veido 15 186 232.77 euro, t.sk., Eiropas Reģionālās attīstības fonda finansējums 3 592 099.08 euro.Projekta attiecināmās izmaksas ir 11 619 470.23 euro, kas sastāv no vispārējiem celtniecības darbiem, iekšējiem apdares darbiem, ūdensapgādes un kanalizācijas darbiem, siltumapgādes darbiem, ventilācijas un elektroapgādes darbiem.Projekta neattiecināmās izmaksas ir 3 566 762.54 euro, kas sastāv no teritorijas labiekārtošanas darbiem, mēbeļu iegādes, lifta izbūves, ārējo inženiertīklu izbūve, informācijas tehnoloģijas iekārtu iegādes, ekspertīze par jauno mācību korpusu projektēšanu, projekta publicitātes un informatīvo materiālu nodrošināšana.Projekta ietvaros tika noslēgts būvdarbu līgums Nr.DI-18-433-lī, kas ietver arī pakalpojumus par būvdarbu autoruzraudzību Rīgas Zolitūdes ģimnāzijas ēkā un Rīgas Klasiskās ģimnāzijas ēkā. Projektu plānots īstenot līdz 2020.gada decembrim. (Latvian)
    0 references
    The aim of the project – Riga Zolitude Gymnasium Ruses iela 22, Riga and Riga Classical Gymnasium at Purvciema Street 38, Riga, creation of new natural science hulls ensuring installation of ergonomic learning environment and implementation of innovative information and technology solutions. Construction of the extension at the Riga Zolitude Gymnasium building at 22 Ruses Street and the Riga Classic Gymnasium building at 38 Purvciema Street;2. Reconstruction of existing buildings at Riga Zolitude Gymnasium and Riga Classic Gymnasium to ensure compatibility of the extension with the existing school.3. Development of ergonomic learning environment, purchase of training room equipment and furniture, modernisation of lighting.4. Introduction of innovative ICT solutions, creation of wireless internet and internet connection, purchase of equipment and software necessary for the training process.5. The total cost of the project is EUR 15186232.77, incl. European Regional Development Fund funding EUR 3592099.08.The eligible costs of the project are EUR 11619470.23, which consists of general construction works, internal finishing works, water supply and sewerage works, heating works, ventilation and power supply works.The ineligible costs of the project are 3566762.EUR 54, which consist of general construction works, internal finishing works, the construction of the building of water supply and sewerage works, heating works, ventilation and power supply works.The non-eligible costs of the project are No 3566762.EUR 54, which consist of the construction of the territory of the building, the construction of the building-in-services, the procurement of public works in the building, the external design of the building, the building’s non-eligible costs are 3566762.EUR 54, which consist of the building of the building, the design of the building and the procurement of the building, the public works of the building and the procurement of public works.The project’s ineligible costs are EUR 3566762.54, which consists of general construction works, internal finishing works, water supply and sewerage works, heating works, ventilation and power supply works.The non-eligible costs of the project are 3566762.EUR 54, which consist of the building of general construction works, internal finishing works, the construction of the building for water supply and sewerage works, heating works, ventilation and power supply works.The non-eligible costs of the project are No 3566762.EUR 54, which consists of the construction of general construction works, internal finishing works, water supply and sewerage works, heating works, ventilation and power supply works.The non-eligible costs of the project are No 3566762.EUR 54, which consists of the construction of general construction works, internal finishing works, water supply and sewerage works, heating works, ventilation and power supply works.The non-eligible costs of the project are No 3566762.54, which consists of general construction works, interior finishing works, water supply and sewerage works, heating works, ventilation and power supply works.The ineligible costs of the project are No 3566762.54, which consist of the construction of the building, the interior decoration works, the works of water supply and sewerage, the works for heating works, ventilation and power supply works.The non-eligible costs of the project are No 3566762.EUR 54, which consist of the building of general construction works, internal finishing works, water supply and sewerage works, heating works, ventilation and power supply works.The non-eligible costs of the project are 3566762.EUR 54, which consist of general works of construction works, interior finishing works, water supply and sewerage works, heating works, ventilation and power supply works.The non-eligible costs of the project are 3566762.EUR 54, which consist of general construction works, interior finishing works, water supply and sewerage works, heating works, ventilation and power supply works.The non-eligible costs of the project are 3566762.EUR 54, which consist of general construction works, The project is planned to be implemented by December 2020. (English)
    15 July 2021
    0 references
    Purvciema iela 38, Rīga, LV-1035
    0 references
    Ruses iela 22, Rīga, LV-1029
    0 references

    Identifiers

    8.1.2.0/19/I/001
    0 references